Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Project Planner, Scheduler, Istana Karang Laut, PT, Onshore, Offshore Oil&Gas

START Date: 
February, 2003
END Date: 
March, 2003

 

PT Istana Karang Laut                                                                                       Jan 2011– June 2011

Project Planner, Scheduler

  • Responsible to ensure Engineering, Procurement and Construction are carried out as per Dossier, Requisition, Codes and Standards from Client’s contract  (Deliverable list) in a planning
  • Responsible in project management team (PMT) to create, ensure project schedule planning, control & monthly, weekly report
  • Develop WBS, resources, weight factor, predecessor – successor andtime line for project schedule, s curve weekly report and controlling (Micr Project / Primavera 6.2)
  • Capture and expedite status of technical queries (TQ), technical bid evaluation (TBE) and procurement report in project team, as weekly, monthly report purpose
  • Direct responsible to Project Manager (PM) and management
  • Responsible to deliver quality req, budget awareness and ontime delivery as per Client’s contract

Project experiences:

  1. Brown Field: Sembgas Onshore Receiving Facility (ORF) Modification GSA-2 Project (Sembcorp, Singapore)
  2. EPCI Jambi Ultrasonic Metering Gas Station Simpang Abadi Project, PGN
  3. Engineering-Procurement Gas Lift Compressor Station – COMPRA Energy SA, Azerbaijan

BID proposal project experiences: EPCI Dayung Gas Compression & Central Gas Debottlenecking ConcoPhilips Indonesia, EPCI Rawa Modification ConocoPhilips Indonesia (Brownfield, Onshore)

 

 

BPMigas, Consultant                                                                                           Nov 2010– Feb2011

Project Planner

Maintenance Assessment Benchmark for KKKS (Pedoman Penilaian Pemeliharaan) Project

  • Project planner
  • As part of consultant member for Pertamina Hulu Energi (PHE) West Java (Previous: BP West Java) and Pertamina EP Region Jawa
  • As a team to develop scoring as per Maintenance Method and assessment report

 

 

ZICOM Equipment Pte Ltd (Zicom Group), Australia Company                          2009 – Oct 2010                                                                                                               

Project Engineer, Planner Scheduler:  Asia Region

  • Responsible to ensure Engineering, Procurement and Construction are carried out as per Dossier, Requisition, Codes and Standards from Client’s contract  (Deliverable list)
  • Part of project management team (PMT) as liason in deliverable list key point (PFD, P&ID, Datasheet, Drawing and Procedures), project execution plan (PEP), project schedule & client report monthly, weekly
  • Develop WBS, resources, weight factor, predecessor – decessor andtime line for project schedule, s curve weekly report and controlling (Micr Project / Primavera 6)
  • Develop and coordinate TQ, TBE, MR with engineering team and procurementas per Client’s contract
  • Supervise Master Document Control to ensure Client’s Dossier and “as built documents”  as per contract(If any, non conformance record / NCR)
  • Point of report to Client and management
  • Responsible to deliver quality req, budget awareness and ontime delivery as per Client’s contract

Project experiences:

  1. EPCI condensate extraction plant (Phase-1) 12mmscfd Pertamina EP Tambun
  2. TURNKEY One (1) Skid-Mounted 1250 Bbl/Day Capacity Condensate Fractionation Plant w/ Associated Facilities (Turn-key), Sylhet Gas Fields Ltd.
  3. EPCI 30 Mmscfd  glycol (TEG) type natural gas plant Semutang

BID proposal project experiences: EPCI custody metering regulation gas station Paket-19 PGN, , Gas gathering pipeline and associated facilities Bangladesh Petroleum E&P Co. Ltd. (BAPEX), Gas metering system Pertamina EP Tambun

 

 

PT SAS Internasional (SAS Group)                                                                         2006 – 2009                                                                                                         Project Engineer (Mechanical Packager), Planner Scheduler

  • Responsible for package equipment (Mechanical packager) onshore and/or offshore upstream facilities in rotating equipment package, custody gas / liquid metering system, Eex cctv system, heat tracing system, portable test separator package, demister package unit for offshore, chemical injection package, HVAC package, water produce hydrocyclone package, nitrogent (N2) generation package, refrigeration (compressor) package, grout packer and LMU for platform structure
  • Responsible to ensure Engineering, Procurement and Construction are carried out as per Dossier, Requisition, Codes and Standards from Client’s contract  (Deliverable list)
  • Develop and coordinate TQ, TBE as per Client’s contract
  • Liason of project team and client in deliverable key point (P&ID, Datasheet, Drawing and Procedure), project schedule & s curve weekly report and qualified vendor / subcontractor
  • Developt WBS, resources, weight factor and time line as per Client’s contract (Micr Project / Primavera)
  • Ensure daily, weekly, monthly and close out report as per Client’s contract (Bar chart, s curve, onsite actual pictures)
  • Supervise document control for Master Document (Deliverable) as per Client’s procedure / system
  • Responsible to deliver quality req, budget awareness and ontime delivery as per contract

Project experiences: Refrigeration (Compressor) package unit offshore – Gajah Baru Project Premier Oil, Custody gas metering calibration Medco E&P Lirik, EPCI portable test separator Petrochina Jabung Ltd, Demister package unit offshore - NORTH Belut ConocoPhillips Project, Tube heat trace for custody gas metering hangtuah platform ConocoPhillips

BID proposal project experiences: Chemical injection package YETAGUN Phase-4 Dev. Project Petronas Carigali, HVAC package for living quarter (LQ) MUMBAI high north (MHN) project ONGC Ltd, Pipeline 6-5/8 inch subsea for KG GAS Dev. Project Star Enery (Kakap) Ltd, Full support in gajah baru project CPP and WHP Premier Oil BV (Awarded to Saipem ENI) in major equipment package offshore, Operation support for Betara Gas Plant Petrochina Ltd in gas compressor spare part and pipeline, Custody liquid metering system Pertamina UP-2 Dumai

 

 

PT KLARAS Pusaka Instrumindo                                                                          2003 – 2006                                                                                                  Project Engineer, Planner Scheduler

  • Responsible in condition based maintenance (CBM) strategy with vibration analysis, oil measurement, thermography and sound assessment, particularly for turbo compressor, gas turbines, diesel engine, fin fan, and pump motor
  • Create and maintain CBM report to client in vibration signature interpret and another symptom to get root cause analysis (RCA)
  • Responsible to planning and controlling project schedule per item task list daily (Micr Project / Primavera)
  • Coordinate to QA QC team in point of inspection testing plan (ITP) and procedure
  • Ensure and hands on Client’s document ASB Status(Dossier)
  • Responsible to deliver quality req, budget awareness and ontime delivery as per contract

Project experiences: Condition monitoring for rotating equipment in Pertamina UP-2 Dumai, Contract basis of turbo compressor and motor pump condition monitoring GT Petrochem (Petrochemical Plant), Preventive maintenance task list & inspection work Pertamina UP-4 Cilacap, Contract basis of major equipment condition monitoring Ajinomoto Mojokerto (Manufacture Plant)

BID proposal project experiences: EPC seven (7) pressure vessels for KONENG gas station Medco EP and Three phase separator production Petrochina Jabung Ltd

 

ConocoPhillips Indonesia                                                                                        Feb 2003                                                                                                                            

Practical Student

Report: Preventive Maintenance in Gas Turbines Centaur T-4500 Driven Generator Power Plant, Ramba - South Sumatra

 

 

EDUCATION

1999 - 2003     Mechanical Eng.         Indonesia Institute of  Technology

Thesis(Grad.A):         Vibration Analyze as a part of Predictive Maintenance on Gas Turbine Centaur T-4500 CATERPILLAR” (Mech. Eng. ITI, 2003)