Planning & cost contol, EPPM, EPC Projects

START Date: 
July, 1992

 

A total of 18 years experienced in Construction Industry (including 10 years in Engineering/Procurement/Construction), a combination of 06 years in Oil & Gas Operations . Directly involved in Project Planning and Controls using the latest version of Primavera Project Planner (P3/P3e/P6),

Activities specifically included within the scope are:  To integrate the planning of functional groups, resources and assets across the Business Unit to achieve. 


Ensure all activities in Operations, Maintenance, Well Intervention, Corrosion Team, Rig moves and Projects are captured in Integrated Planning Process schedule. Close coordination with Operations, Maintenance Group, Facilities Engineers and Contractors. Responsible for scheduling of Turnaround and shutdowns activities, Well construction and Intervention drilling works. Capital upgrade and replacement activities on existing facilities. Identify critical activities that include production losses, shutdown/shut-ins and high profile work. Participate safety, staff meetings and other meetings for the facilities. Conduct planning meetings regularly with participation of Operations, Maintenance group and Contractors. Provide training in Project Controls (Planning) related works for our Assistant Planners

 

  • Project Time Management: Includes the process requires accomplishing timely completion of the project, planning & controlling.
  • Project Cost management, cost estimation & controlling
  • Key performance indicators(KPIs)
  • Balanced Scorecard (BSC)
  • Responsible for Operations Readiness (OR) planning and progress monitoring. I assure that established procedures and best practices are applied as appropriate
    • Responsible to assist in the revision of the OR plan and schedule to meet the OR objectives.
    • Adhering to the Project and Area   Work Breakdown Structure (WBS).
    • Compiling (CPM) Critical Path Method, logic networks.
    • Responsible for ensuring that all applicable standards procedures and systems for project planning and scheduling are followed,
    • Responsible for the planning progress covering the OR progress and productivity reporting for work areas assigned,
    • Assist in the integration of the OR team’s level 4/5 plans and schedules into the level 3 master schedule,
    • Produce and distribute reports on a weekly / monthly basis for progress updating.
    • Perform schedule assessment and reports that includes the trends and changes per assigned area.
    • Also responsible for
      • All aspects of the planning and scheduling for all designated areas. Consistent methods / procedures, compliance with the contract, schedule assurance and team work.

Perform periodic project schedule risk analysis within areas assigned