PLANNING ENGINEER, L & T , SALALAH INTERNATIONAL AIRPORT PROJECT, OMAN
START Date:
September, 2007 Roles & Responsibilities:
- Thorough study of the contract documents / drawings to prepare a Master Plan / Schedule for the project using PRIMAVERA (P6/P3) within the given budget, manpower and time limits using CRITICAL PATH METHOD.
- Resource Loading / Leveling.
- Getting the Master plan approved.
- Updating the progress every week and comparing it against the Master plan / Target for submission to the client / consultant and to the management (Through “S-Curve”).
- Preparation of recovery schedule / detailed schedule in case of requirements.
- Preparation of Daily reports consisting of the activities done previous day, activities planned for the next day and total detailed man power.
- Preparing the Activities 3-Week Look a-head schedule as well as Material 3-Week Look a-head Schedule every week to help the construction team cope up with the target and also for the client purpose.
- To make cash flow statements / S-Curve’s, comparisons of the curve’s, Manpower Analysis, weekly reports & monthly reports preparation (MS PowerPoint Presentation)
- Approvals of EOT (Extension of Time) from the Main Contractor / Consultant.
- Approvals of Acceleration Costs from the Main Contractor / Consultant.