Engineer (Planning & Designs), WAPCOS, Infrastructure, Hydro-Power & Water Resources
START Date:
June, 2001
END Date:
August, 2007 - SALMA DAM PROJECT (14 x 3 = 42 MW),AFGHANISTAN
- LOHARINAG-PALA H.E. PROJECT (4 x 150 = 600 MW), INDIA
- LATA-TAPOVAN H.E. PROJECT (3 x 36 = 108 MW), INDIA
- TAPOVAN-VISHNUGAD H.E. PROJECT (4 x 130 = 520 MW),
INDIA - BAMIYAN (ARANGARAN) MICRO-HYDEL SCHEME (3 x 250 =
750 KW), AFGHANISTAN - PURULIA PUMPED STORAGE PROJECT (4 x 225 = 900 MW),
(WB) INDIA - GODAVARI LIFT IRRIGATION PROJECT(AP),INDIA
- MANSI WAKAL DAM STAGE-I,(RJ) INDIA
- OMKARESHWAR H.E. PROJECT (4 x 130 = 520 MW),(MP)
INDIA - KOL DAM PROJECT (4 x 225 = 800 MW),(HP) INDIA
Responsibilities involve Project Planning, Scheduling, Project Coordination and Project Management using Primavera Project Planner andMS Projects.
- Engineering, Procurement and Construction.
- Creation & Maintenance of the overall Coordinated Project Schedule
- Review & Creation of Client/Contractor Schedules
- Development of Engineering Bar-chart Schedules, S-curves and Histograms based on deliverables and in accordance with the Work Breakdown Structure.
- Development of Procedures & Coordination of Methods & Norms for Planning and Scheduling
- Maintenance of Cash Flow Statements
- Periodic Progress Reporting/Meetings
Member of Core Engineering, Responsibility involve in Preparation of
- Conceptual Project Layout Planning
- Planning, Hydraulic and Structural Analysis
- F.E.M. analysis for Planning and Design of Structures
- Detailed Engineering Designs
- Technical Specification & Tender Documents
- Tender Stage Drawings
- Construction Stage Drawings
- Bill of Quantities
- Cost Estimates
- Geological & Geotechnical Investigation