Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Senior Project Planner, Laing O'Rourke, As Above

START Date: 
August, 2007

Laing O'Rourke Planning Experience

Sellafield EPS3 (Project Planner / Project Controls Manager)   2007 – 2009

Turnkey Nuclear Waste Repository, approximately 100m in length, 50m in width, and 24m tall.  The Repository consists of two storage vaults, a multi level maintenance area for the two remote controlled cranes, and associated building services and maintenance facilities.  Planning Software – Primavera P3 and P6 –

IEP Doncaster Tender 2009

Demolition of Existing Facilities and Enabling Works, Asbestos Removal, New Rollingstock Maintenance and Assembly Sheds, Offices, Track and OHP, Signals, Points and Connections to Existing Track.  Planning Software – P6v6.2

 Urenco TMF (Senior Project Planner / Project Controls Manager)       2009 – 2011.

Turnkey Reprocessing Facility, consisting of 11 process and storage buildings, of which five are seismically qualified RC structures and one is a seismically qualified steel framed structure.  The works involve construction of an island site within an existing Nuclear Licensed Site, Process Buildings, Infrastructure and Associated works.  Planning Software – Primavera P6 and P6v7 – (Pertmaster Risk Analysis utilised)

Manchester Metro – Ashton Line (Senior Project            Planner)              2011 – Present

Tramway extension of 4km from Droylsden to Ashton-u-Lyne, including four tram stops, highway running and off street light rail sections.

Planning Software P6v7