SNR PLANNING ENGINEER/COST CONTROL ENGINEER, Seplat Petroleum Dev Co, gAS PLANT OF 150MMSCF

START Date: 
October, 2014

discipline:                     SNR. Planning/CONTROLS engineer

CONTACT ADDRESS:    5TH Avenue N Close House3 Festac Town, Lagos State, Nigeria.

NATIONALITY:                Nigerian                   

MARITAL STATUS:         Married

E-MAIL:                               fred13ng@yahoo.com

TELEPHONE NUMBER:    +2348033527721

 

 

PROFESSIONAL EXPERIENCE

 

I have more than Eight (8) years exposure in Oil & Gas industry which ranges from Production,Drilling & Completion, Fabrication, Installations, Maintenance Operations, Project planning,scheduling,monitoring, executions, Engineering Design, Production, Oil field Operations and independent handling of technical matters  with construction ability.

Some of the areas include:

  • Management of site based team and project work scope during fabrication, construction and installation
  • Monitoring and implementation of sub-contractors adherence to project standard schedule and budget.
  • Repair and replacement of various Flow station Equipment/Parts

§  Flow station facility integrity checks e.g. Routine checks on instrument connections, Pumps, Valves, Meters etc.

§  Chemical injection operations and Well heads maintenance operations e.g. Routine establishment of Wellhead Pressure regime.

§  Routine changes of various Beans on various Wellheads for onward Flow lines pressure regulation.

 

QUALIFICATION

·         Bachelor of Engineering Degree (B.Eng), Petroleum Engineering

University of Benin, Benin City

  • Second Class Honours                                              (2004-2007)

·                     Institute of Management and Technology, Enugu. (1998-2000)

  • Upper credit  OND IN Elect./Elect Engineering  (1998-2000)            

                                             

TRAINING COURSES

ASPEN HYSYS TRAINING ON;

  • Well and Process Design Simulation Using HYSYS   (Feb.2008)

AVEVA TRAINING ON;

  • PDMS Modeling                                                           (June 2008)
  • BOSIT                                                                                      (2012 -2015)

 

PROFESSTIONAL AFFILIATIONS;

  • Member, Society of Petroleum engineers
  • Member, Project Management Institute (PMI ID NO 1230444.)

 

SUMMARY OF EXPERIENCE:

 

  • Ability to produce deliverables based on project requirements and review detail design documents to client satisfaction.
  • Ability to use software for engineering design.
  • Ability to work effectively in a multidiscipline environment.
  • Review and interpretation of Piping drawings and P & ID’s
  • Has Good knowledge of project management and coordination.
  • Excellent communication, organizational, Leadership Skills, interpersonal skills, Presentation Skill and Adaptability
  • Good Time Management Skill and Good Team Spirit
  • Technical Report Writing Skills
  • Total Quality Management Skills]
  • Permit to work system skill

 

March 2012 – Till Date: Seplat Petroleum Development Company

PROJECTs: Oben Gas Debottlenecking 90MMSCF-140MMSCF

                        Oben Gas Debottlenecking 140MMSCF-200MMSCF

                        Sapele,Oben & Amupke Flowstation Upgrade

                        Oben Associate Gas Compressor Green Field

                        Sapele Non Associate Gas Upgrade

                        Sapele Associate Gas Compressor Upgrade

                        Oil Field Development Project(Warri, Sapele & Oben)

                        Ovhor infill bulklines & Flowlines Const, & Installation

                        Alternative Export Route & LACT(Warri Reinery)

                        Liquid Treatment Flowstation (Green Field)

                        Construction of Crude Storage Tanks(200,000bbl)

                        Drilling & Completion of Oben Work over Wells

            Drilling & Completion of Appraisal & Exploratory Wells

                         

POSITION: Production/Field Operations Planning Engineer

·              Responsible for setting up planning systems & monitoring of major projects like Oil Field Development Plant and to manage an existing schedule using Primavera (P6) & MSP on all project planning and scheduling functions, to assure definition, determination of schedule status and progress, and analysis of scheduling trends.

·              To prepare schedule update on a bi-weekly basis, provide all required schedule information (milestones, interfaces and durations) for all contract packages to ensure proper evaluations of quotations, comparison to target schedule and progress reporting.

·              Development of onshore hook-up work plan and construction work packs

·              Coordination of construction crew and construction activities

·              Liaising with Contractors in reviewing the scope and work to be done on a daily basis

·              Responsible for tracking, planning systems and Monitoring for Drilling & Completion wells progress update.

·              Tracking, Updating and publishing of Seplat Operations weekly dashboard.

·               Aided  with  the  preparation  of  management  reports  and  maintaining  the  oil  production account

·              Tracking, Updating and publishing of Seplat Capital Projects weekly dashboard

·              Consolidate, control and coordinate all planning and progress measurement activities related to the package scope of supply.

·              Ensure that all package activities are correctly planned and performed throughout the whole project duration in accordance with the initial plan.

·              Elaborate and revise the package planning & progress measurement procedures, documents and Participate in reviews and technical audits on planning & progress activities.

·              Collaborate with Package Cost controller for validating progress and milestones used in Contractor monthly invoice.

 

 

 

Feb.2012–March2012: Addax Petroleum Nigeria Ltd/Kaztec Engineering

Project: Lift and Installation of Deck Extension to existing Tanker Mooring/Manifold Platform (Offshore)

CLIENT: Addax Petroleum Development Nigeria Limited

POSITION: Senior Planning/Controls Engineer

·              Prepares - on the basis of the proposal time schedule – a detailed network diagram for Project execution covering all phases of a Project (Engineering / Procurement / Construction / Commissioning) and to makes sure that all activities including those from the client and/or partners are presented in a network diagram and that the critical path is clearly depicted.

·              Development of offshore hook-up work plan and construction work packs

·              Coordination of construction crew and construction activities

·              Liaising with client in reviewing the scope and work to be done on a daily basis

  • To establish monitoring formats & schedule preparation
  • Preparation of Variation order (VOR) and Claims for Extra work.
  • To Manage Personnel onboard and identify potential delays, analysis and proposed corrective actions as required.
  • To identify and maintain Contractors interface milestones for the Commissioning Schedule including Construction, Commissioning and Start Up for the Topside, the Accommodation Unit, the Offshore Gas Terminal, the Subsea activities and operations.
  • Prepare reports about projected Project costs

 

Sept 2011- Feb. 2012: Addax Petroleum Nigeria Ltd/Kaztec Engineering   

PROJECT: Installation/Hook-up of Topsides, Risers and subsea Pipelines on ADRP-1 & 2, Pigging of ADRP2 Pipeline to TMMP (Offshore)

CLIENT: Addax Petroleum Development Nigeria Limited

POSITION: Project Planning/ Controls Engineer

·              Prepares - on the basis of the proposal time schedule – a detailed network diagram for Project execution covering all phases of a Project (Engineering / Procurement / Construction / Commissioning) and to makes sure that all activities including those from the client and/or partners are presented in a network diagram and that the critical path is clearly depicted.

·              Development of offshore hook-up work plan and construction work packs

·              Coordination of construction crew and construction activities

·              Liaising with client in reviewing the scope and work to be done on a daily basis

  • To establish monitoring formats & schedule preparation
  • Preparation of Variation order (VOR) and Claims for Extra work.
  • To Manage Personnel onboard and identify potential delays, analysis and proposed corrective actions as required.
  • To identify and maintain Contractors interface milestones for the Commissioning Schedule including Construction, Commissioning and Start Up for the Topside, the Accommodation Unit, the Offshore Gas Terminal, the Subsea activities and operations.
  • Prepare reports about projected Project costs.

 

Dec. 2010 – Sept 2011: Addax Petroleum Nigeria Ltd/Kaztec Engineering   

 

PROJECT: Installation/Hook-up of Topsides, Risers and subsea Pipelines on ADPP, ADRP, TPU & TMMP (Pre-shutdown, shutdown & post-shutdown Activities)  (Offshore)

CLIENT: Addax Petroleum Development Nigeria Limited

POSITION: Project Planning/ Controls Engineer

 

RESPONSIBILITIES:

·              To establish cost, time, resource (CTR) and contractor work estimate (CWE) and schedule package for  the work

·              Shut down preparation and checking of all activities connected to shut down

·              Prepares – on the basis of the initial contract estimate as well as on the basis of the approved detailed Project execution schedule – the progress curves and the manpower histograms as a basis for effective man-hour management

·              Prepares - on the basis of the proposal time schedule – a detailed network diagram for Project execution covering all phases of a Project (Engineering / Procurement / Construction / Commissioning) and to makes sure that all activities including those from the client and/or partners are presented in a network diagram and that the critical path is clearly depicted.

·              Development of offshore hook-up work plan and construction work packs

·              Coordination of construction crew and construction activities

·              Liaising with client in reviewing the scope and work to be done on a daily basis

·              To establish monitoring formats & schedule preparation

·              Monitoring of muilti-pupose supply vessel (MPSV) movement and transfer of Construction Personnel offshore and onshore

·              To establish progress measurement system (client & team players respectively).

·              Create work breakdown structures suitable to the program of work

·              Input planning data: activities, tasks, logic, resources, key dates, progress etc

·              Analyse planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling

·              Maintain progress data on live programs and produce progress reports

·              Contribute to internal initiatives such as the implementation of contemporary Project Management software and development of business processes

·              Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports, Daily Project Report,) for projects and tender support.

·              To Manage Personnel onboard and identify potential delays, analysis and proposed corrective actions as required

 

PROJECT: Installation of Topside and Riser, Adanga South Water Injection (Offshore) May 2010-Dec 2010

CLIENT: Addax Petroleum Development Nigeria Limited

POSITION: Site Planning/Costing Engineer

 

RESPONSIBILITIES:

·              To establish cost, time, resource (CTR) and contractor work estimate (CWE) and schedule package for  the work

·              To establish scope of works(for all disciplines)

·              To establish deliverables relevant to fulfill the project

·              To establish monitoring formats & schedule preparation

·              Monitoring of muilti-purpose supply vessel (MPSV) movement and transfer of Construction Personnel offshore and onshore.

·              To establish progress measurement system(client & team players respectively).

·              Create work breakdown structures suitable to the program of work

·              Input planning data: activities, tasks, logic, resources, key dates, progress etc

·              Analyse planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling

·              Maintain progress data on live programs and produce progress reports

·              Contribute to internal initiatives such as the implementation of contemporary Project Management software and development of business processes

·              Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports, Daily Project Reports,) for projects and tender support.

·               To Management Personnel onboard and identify potential delays, analysis and proposed corrective actions as required

·              To Manage Personnel onboard and identify potential delays, analysis and proposed corrective actions as required

 

WORKEXPERIENCE: COMPACTMANIFOLD & ENERGY SERVICES LTD              SEPT. 2010 – NOV. 2010

Position: PROJECT CONTROLs

Project:Fabrication of Jacking Beams and to comply with regulatory and corporate operational excellence requirement.

CLIENT: BUILDWELL PLANT AND EQUIPMENT LTD

Job Position: Cost & Planning Engineer

Responsibilities;

·              Project budget estimation & control

·              To establish deliverables relevant to fulfill the project

·              Schedule & cost S-curves generation

·              Establishing of man-hours cost/quantity(in contract)

·              To establish monitoring formats & schedule preparation

·              To establish progress measurement system(client & team players respectively)

·              Ensures compliance to our clients policies, processes and administration requirements

·              Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports) for projects and tender support

·              Independently, or under limited supervision, apply advanced scheduling and planning techniques and analysis within a project environment. When required, supervise a small group of Schedulers/Planners in developing, maintaining, and analyzing critical path plans and related schedules

·              Provide planning support as required by Engineering management

·              Liaise with project and other functional planners to obtain critical planning information

·              Create work breakdown structures suitable to the program of work

·              Input planning data: activities, tasks, logic, resources, key dates, progress etc

·              Analyze planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling

·              Maintain progress data on live programs and produce progress reports

 

WORKEXPERIENCE: COMPACTMANIFOLD & ENERGY SERVICES LTD              April 2010 – Dec. 2010

Department: PROJECT CONTROLs

Project:FEED and DED to UTONANA FIRE WATER UPGRADE and

to comply with regulatory and corporate operational excellence requirement.

CLIENT: CHEVRON NIGERIA LIMITED

Job Position: Cost & Planning Engineer

Responsibilities;

·         Toestablish cost, time, resource (CTR) and contractor work estimate (CWE) and schedule package for  the work

·         To establish scope of works(for all disciplines)

·         To establish deliverables relevant to fulfill the project

·         To establish monitoring formats & schedule preparation

·         To establish progress measurement system(client & team players respectively).

·         Create work breakdown structures suitable to the program of work

·         Input planning data: activities, tasks, logic, resources, key dates, progress etc

·         Analyse planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling

·         Maintain progress data on live programs and produce progress reports

·         Contribute to internal initiatives such as the implementation of contemporary Project Management software and development of business processes

·         Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports) for projects and tender support

           

2009 – Till Date: COMPACT MANIFOLD AND ENERGY SERVICES LTD

(Project control/Engineering department)

As a project planner/scheduler, I have worked on;

Work History: Engineering Design and offshore Experience

Project: GAS TRANSMISSION PIPELINE INTEGRITY, METERING STATION AND REVAMP OF THE OLD SAPELE METERING STATION (LOT 4 SAPELE/OBEH) PROJECT (OCTOBER 2009-Till Date)

Client: Federal ministry of Power and Steel, Nigeria, Niger Delta Power Holding Company

Job position and responsibility: project planner/scheduler Engineer: 

·              Project budget estimation & control

·              To establish deliverables relevant to fulfill the project

·              Site visitations to Sapele to cover site investigation area of the metering station as well as the on going power plant construction.

·              Schedule & cost S-curves generation

·              Establishing of man-hours cost/quantity(in contract)

·              To establish monitoring formats & schedule preparation

·              To establish progress measurement system(client & team players respectively)

·              Ensures compliance to our clients policies, processes and administration requirements

·              Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports) for projects and tender support

·              Independently, or under limited supervision, apply advanced scheduling and planning techniques and analysis within a project environment. When required, supervise a small group of Schedulers/Planners in developing, maintaining, and analyzing critical path plans and related schedules

·              Provide planning support as required by Engineering management

·              Liaise with project and other functional planners to obtain critical planning information

·              Create work breakdown structures suitable to the program of work

·              Input planning data: activities, tasks, logic, resources, key dates, progress etc

·              Analyze planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling

·              Maintain progress data on live programs and produce progress reports

·              Contribute to internal initiatives such as the implementation of contemporary Project Management software and development of business processes

 

2008 – Till Date: COMPACT MANIFOLD AND ENERGY SERVICES LTD

            (Business development/Engineering department)

            As a project planner/scheduler, I have worked on;

Project:        GAS TRANSMISSION PIPELINE AND METERING STATION

(LOT 3 CALABAR) PROJECT (June 2008-Till Date)

Client:          Federal ministry of Power and Steel, Nigeria, Niger Delta    

                        Power Holding Company

Job position and responsibility: project planner/scheduler Engineer: 

·              Project budget estimation & control

·   To establish scope of works(for all disciplines)

·   To establish deliverables relevant to fulfill the project

·   Site visitations to calabar to cover site investigation area of the metering station as well as the on going power plant construction.

·              Schedule & cost S-curves generation

  • Establishing of man-hours cost/quantity(in contract)
  • To establish monitoring formats & schedule preparation
  • To establish progress measurement system(client & team players respectively)
  • To Establish monitoring database
  • To Establish progress/information routing
  • Assigned to work in various departments such as procurement, civil, power plant, electrical &instrumentation.

 

2000-2004: Heritage Preciousland Company

Client: Chevron Nigeria limited, Escravos LPG FSO, warri, Nigeria.

Duties: Assistant Process Engineer (in FSO/FPSO operations)

  • Familiar with the operation and maintenance of all FSO’S plant and machinery
  • Comprehensive knowledge of all ESD system including gas and fire detection systems and safety valves.
  • Work individually under the guidance of the maintenance supervisor. Be part of schedule maintenance process
  • Assist maintenance supervisor in planning of weekly and monthly scheduled maintenance.
  • To run the department under the guidance of the maintenance supervisor in a responsible and conscientious manner and know how to report abnormalities or to ask for assistance.
  • Comprehensive knowledge of the FSO’s monitoring and control systems.
  • Comprehensive knowledge of the FSO’s refrigeration and reliquefaction control systems.
  • Comprehensive knowledge of the FSO’S electrical installations in hazardous areas.
  • Knowledge on production process and terminal operations

Good Knowledge of working in line with companies’ policy, safety and standard.

 

 TECHNICAL SKILLS:

        Software:          

1.       AutoCAD                                                                                   (Good Knowledge)

2.      Plant Management Design System (PDMS)                      (Good  Knowledge)

3.      Microsoft Office (Word, Excel, PowerPoint)                      (Good  Knowledge)

4.      Process Plant Modeling and Design Using (HYSYS)        (Good  Knowledge)

5.      Project planning and scheduling using (MICROSOFT PROJECT)  (Good Knowledge)

6.      Project Planning and scheduling using (PRIMAVERA 3&6) (Good Knowledge)

7.      Well Head and Control Panel using  Microsoft Office Visio  (Good  Knowledge)

8.     Offshore survival skill

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
2600