Site Civil engineer, Bombela Civil Joint Venture, Gautrain Rapid Rail Link

START Date: 
August, 2006
END Date: 
August, 2008

BOMBELA CIVIL JOINT VENTURE:  GAUTRAIN PROJECT Viaduct 14 and 15.1: Site Engineer (September 2006 to August 2008)

Site Administration

  • Managed and updated Safety inspection procedure’s records
  • Controlled Site Documents (submissions of letters to utility authorities, minutes, filing, issuing drawings),
  • Managed records of utility progress and issued purchasing orders for site materials

      Safety & quality control

  • Inspected erected scaffoldings and enforced  safety to use or not measures
  • Managed and completed First Aider all site compliances ( Completion of the Fem forms during incidents )
  • Managed daily records of tower inspections and shutter access for the Piers (structures)
  • Managed subcontractors compliances  to safety and environmental regulations
  • Arranged safety inductions for subcontractors before commencement of work
  • Managed procuring of drainage pipes orders, inspected the quality delivered against issued for construction drawings and updated piping schedule
  • Inspected and managed reinforcement delivered on site according to bending schedule
  • Updated and kept records of dates of concrete cast
  • Coordinated sending cubes to Midrand lab

      Site inspection

  • Managed and structured subcontractors for site establishment, fencing and clearing  
  • Supervised of platform treatment for all weather conditions
  • Evaluated the quality of work done for payment
  • Accepted and checked materials delivered on site
  • Managed and coordinated compliances of environmental regulations
  • Compiled and updated monthly reports of accidents, water management, noise measurements etc.
  • Authored and updated 3 months construction program and  3 weekly forecast program
  • Monitored site work  interphase construction work per section and monitored progress
  • Monitored, managed and authorised access for sub- contractors per section of work
  • Supervised piling works that is reinforcement casing, pile depth and concrete slump before casting.
  • Supervised lateral support work that is reinforcement casing, pile depth and concrete sump before casting.
  • Managed, inspected and supervised road works that is stabilization of road work, resealing of road and fill of potholes.
  • Monitored fencing sub-contractor and validated completion of work
  • Identified, verified and monitored tree felling contractors for parking
  • Prepared and updated progress reports including progress picture

 Contracts

  • Evaluated and verified schedule of quantities submitted by contractors
  • Estimated cost  for material and equipment for construction
  •  Issued and validated of completion certificates, measurements of the completed works (area & volumes) for As – built drawing
  • Verified payment certificates ( re-measurements on work done)
  • Evaluated Pre- tender documents, Participated in the preparation of the overall work programme and  balanced resources to complete in time,
  • Estimated cost of  temporary and permanent works, tender inspections and adjudication and prepared back charges schedules for the client

Results:

  • Completed of Viaduct 14 and 15.1 Site Establishment, Piling works, Relocation of exciting    Utilities.
Experience Hours (Planning & Scheduling): 
4000