PROJECT PLANNER/PLANNING ENGINEER, Descon Engineering Limited, Plant shutdown maintenance; Construction Project Oil & Gas
START Date:
January, 2005
END Date:
October, 2007
Responsibilities:
- I have worked with DESCON Engineering in the positions of Planning & Scheduling Engineer, Lead Planning Engineer and Project Engineer and Planning Coordinator at different projects and locations
- Developing, reviewing and updating the daily/weekly/monthly plans for scheduled project activities
- Responsible for implementation and maintenance of project planning and control procedures
- Prepare and monitor the overall integrated Level-IV Plans using the Primavera Project Planner (P3)
- Maintain accurate schedule and control curves in an updated condition. Analyze schedule trends and produce regular forecasts of schedule performance and issues for project review
- Responsible for cost control measures by optimum utilization of resources & eliminating re-work, idling of manpower and equipment, wastage of material and consumables, etc
- Ensure that all sub-contracted works are carried out strictly in accordance with sub-contract terms & conditions
- Preparation of resources such as manpower, equipments, tools and plants as per plan and assure timely availability
- Site checks and verification of engineering data, in liaison with the discipline engineers and supervisors
- Assess resource requirement and produce integrated mobilization / demobilization plans
- Preparation of invoices, change order and extra work claims for Civil, Mechanical, E&I works
- Preparation of control and monitoring sheets and prepare job packages for the execution team
- Verification of BOM from drawings, P & ID’s, Spare Parts Lists and Data Sheets
- Identifying and managing material requirements for coming shutdowns e.g. gaskets, spare parts and LLI
- Maintaining equipments history, reporting and relevant documentation using MAXIMO
- Prepare improvement plans for future shutdowns and review lesson learned during the execution of work
- Worked as a Lead Planning Engineer for GASCO Shutdown Core Team
Construction Projects/Maintenance Projects executed with DESCON,
- GASCO OGD-I, Train-II Shutdown Bab Plant Total Shutdown, Habshan Abu-Dhabi, UAE
- GASCO OGD-I, Train-II Shutdown, Habshan Abu-Dhabi, UAE
- De-bottlenecking Project of Qatar Gas LPG Plant (Train-III), Ras Laffan Qatar
- Revamping Project of Abu-Dhabi Polymer Company (Borouge) Rawais, Abu Dhabi UAE
- Revamping Works Project National Refinery Limited (Fuel Refinery) Karachi, Pakistan
- Revamping/Maintenance Fauji Fertilizer Bin Qasim Limited Karachi, Pakistan
- Underground Piping Project, Uch Power Station Dera Murad Jamali, Pakistan
- Shutdown/Maintenance National Refinery Limited (Lube-II) Karachi, Pakistan
- Annual Turnaround of PPL Adhi LPG/NGL Plant, Pakistan
- Annual Turnaround of Pakistan PTA Plant ICI (T11) Karachi, Pakistan