Senior Planner, Ansaldo Energya, Power Plant 3x127,8 MW
START Date:
December, 2008
END Date:
April, 2009 Turbo-generator 3x126,7MV with electrical substation (workshop, administration building, post of centralized control with integral system : energy equipments, gas, gas oil, various water system, electrical, measures and telephony system, supervisory and security system and many other services). |