Business Transformation and Project Controls Systems Specialists, CDI Engineering Corp., All Company Projects
B.S. 4yr. Degree, TWIC 2018, Operations Certified Crude, Reformer, FCC,NHT, STGU, Advanced Data Base utilization has been involved on all projects (Excel, Access, PRISM, JD Edwards, SAP PS/PP/PM/BW, MAXIMO, Earned Value Management BAC analysis reporting, etc.… used on all jobs below. (NECCR Instrumentation Tech. Cert. / Petrochemical Operations Cert., Maintenance/Turnaround Planner with rotating equipment) and economics coursework.
Summary of Experience: ANSI/EIA-748-D
• Experience in Primavera P6, P5, 5.0, P3 3.1, 2b, SAP PM/PS Maintenance(tag list operational level priority live unit maintenance work order planning and release, Turnaround Brisk coordination
• Experience/knowledgeable utilizing Ariba suite of e-procurement software (Ariba Software Workbench) to develop, maintain, and store contractors. Civil drawing Take/Offs
• Strong technical experience in estimating, scheduling, detailed project planning and cost budgeting, expenditure monitoring, Kbase estimate to schedule alignment, Project Performance Tracking & Civil take offs.
• Coordinating with consultants and clients on schedule sequence and logistics.
• Strong analytical skills used in the forecasting of costs & risk analysis.
• Project experience with oil /gas industry at different EPC project phases planning, and scheduling (Engineering, Procurement and Construction for Turnarounds, and Capitol Projects).
• Expertise in reviewing technical specifications, technical bid preparation / evaluations including scope, P & ID, technical details etc. as it pertains to the following industries:
Power Plants (Fossil Fueled/Nuclear, Combined Cycled HRSG GE/Siemens, GE)
Petroleum Refineries (Crude, Reformer, FCC, NHT, STGU)
Pharmaceutical
Chemical Plants
LNG/NGL Recovery/Fractionation facilities
Nuclear Power Plants
Government Secret Clearances (Pentagon, Navy, & Air force (NASA, LLNL), DOE)
20 years in industrial as listed above.
Also I have practical field experience as a Laborer, Pipefitter, Electronics Tech,
Boilermaker, Process Start-Up Specialist, Instrumentation Technician,
Primavera 3.0/5.0, 7 years SAP/R3 PP/PM/PS/MM ModulesMatrix planning from
inception thru execution, MS Projects, AS400,Icarus 2000/Aspen Kbase, Suretrak, Excel, Access, Sr. Maintenance Planner, Sr. Project Controls Specialist,
Electrician, Sr. Project Engineer, Sr. Process Operator, and a thorough
understanding of how work flows forwards and backwards in Crude, Reformer, FCC, NHT, STGU.
Appling For: Open Position (now limited to one discipline):
Currently elections clerk, marine dock worker, and Teaching K-8th grade English, math, science, and social studies presently.
Project Controls Engineer, May 2016 – August 2016
Job function: Project Management
Reported to the Senior Project Controls Manager for Management of Functions-Cost and Scheduling Group (MOF-CS-PS). The Project Control 4 functions as a team lead and supervising work of a group of Project Control Professionals and support staff within MOF-CS. Supervising schedule development, maintenance and monitoring, cost engineering analysis and control activities. Preparing and reviewing the preparation and presentation of cost engineering and planning activities. Supporting project organizational and administrative activities. Responsible for cost engineering and cost analysis/control and planning and scheduling activities for projects with significant non-routine requirements or for discipline/projects/proposal cost and planning activities requiring a high degree of technical skilled experience. Ensuring work is completed as scheduled. Identifying cost trends for management attention. This position is requiring demonstrated skill in identifying, analyzing, and providing innovative solutions to cost engineering and schedule guidance to projects, assuring full compliance with ANSI/EIA-748-D and all procedural "Best Practices"; utilizing Primavera, Acumen Fuse (DCMA/PM30 checks and risk), PRISM (for cost management), PMR (for risk analysis) and proprietary EVMS reporting tools (for EAC/ETC forecasting).
Partner at HEB December 2015 – Part-time (9 months)
Responsable de proporcionar un departamento bien surtido y mantenido mientras que proporciona servicio al cliente superior. Esta posición es responsable de la preparación , envasado y comercialización de productos frescos a diario , mientras que el mantenimiento de todas las normas departamentales y seguridad alimentaria / saneamiento.
- Operaciones de huéspedes Mango y toma pedidos - Rebanadas , paquetes y etiquetas de productos -Weighs , Precios, y las selecciones de paquetes optimizaciones -Proceso Evaluación comparativa nivel -Planta
Galveston County Elections Division November 2014 - February 2016
Elections Clerk (1 year 4 months) 1) performs any combination of the following duties during elections: Compiles and verifies voter lists from official registration records.
2) Requests identification of voters at polling place.
3) Obtains signatures and records names of voters to prevent voting of unauthorized persons.
4) Distributes ballots to voters and answers questions concerning voting procedure.
5) Counts valid ballots and prepares official reports of election results.
Freeport LNG
November 2014 - January 2015
Sr. Scheduler (3 month assignment)
Freeport LNG Plant level 3 baseline integrated planning, and risk assessment to certify for client sign-off and issue “Notice to Proceed”.
KBR Scheduling/Planning: (LNG, FPSO, PolyP, and Crude, Reformer, FCC, NHT, STGU, )
May 2014 – September 2015
Pre-FEED schedule development on the P100 Pre-FEED and Petrobras America Cascade & Chinook Full Field Development Floating System Execution Schedules
February 2014 – May 2014
Koch Corpus Christi refinery, initial site visits and In-Houston Engineering PMT Duties.
December 2013 – January 2014
Small Projects - TBD, Home Office - Houston Texas
Developed Pre-FEED/FEL Primavera resource loaded with all activities WBS codes assigned per ROM estimate, and Project Manager recommendation and generation of Primavera XER file for successful risk review & participated the initial review to answer Basis of Schedule inquiries posed by the review team for this ongoing FPSO; Angolan, Africa Project. The particular of the project are as followed:
Approximately 10 month duration for Engineering
· Complete Jacket Detailed Design: 22 Weeks
· Complete Topsides Detailed Design: 42 Weeks
Punja Project
Sonangol intends to develop the Punja Oil Field, located offshore Angola in Block 3-05A. This field is located approximately 20 Km from the Angolan coast and is located in 80 m of water. Production facilities include two remote wellhead platforms (namely PUN-F1 and PUN-F2). They are connected with a multiphase production flowline from PUN-F2 to PUN-F1 plus a gas injection flowline from PUN-F1 to PUN-F2. An early production system (EPS) is bridge linked to PUN-F1. Finally, a multiphase / oil export pipeline from PUN-F1 is tied back to the existing PALANCA facilities (about 4.0km). Produced oil will be stored and exported via existing PALANCA Terminal. Each wellhead is designed with 12 drillable slots for production wells and gas injection wells.
The scope of work being bid by KBR to Subsea 7 is for the following facilities. KBR will perform complete detailed engineering and procurement services. Follow-on engineering support services during Fabrication, Installation, Commissioning and Startup are also part of the scope.
1) Punja South Well Head platform (PUN-F2), including jacket (optional),
2) Punja North Well Head platform (PUN-F1), including jacket (optional),
3) New Bridge (EPS / PUN-F1)
4) Palanca Platforms (Brownfield):
Pig receiver (PAL-F1)
Tie-in to existing oil export system (PAL-P2)
Tie-ins associated with relief, blow down, open drain, closed drain, and instrument Air and Fire Water System
Tie-ins associated with E&I WHP Works (PAL-P2)
5) Early Production System (Brownfield)
Bridge Connection from PUN-F1
Tie-ins for Piping, Electrical & Control System
Kelly Services 09/2013 – 11/2013
Sr. Project Planner/Scheduler(Commissioning/Startup); Seconded to Dow Chemicals; Freeport, Texas
Responsible for development and maintenance of the overall, integrated project controls systems, procedures, reporting, and change control for Client Owner Operator. Coordinate with project managers and project engineer and supervises project staff to ensure correct implementation of project control/business procedures and requirements.
JE Project Management 03/2013 – 09/2013
Project Controls Consultant (Maintenance Planning); Seconded to Suncor Upgrading Routine Maintenance Project; Ft. McMurray, AB.
Responsible for being accountable for all maintenance planning on equipment in allocated areas. Developed Gross Estimated for Work Requests as required for budgeting and effective decision making, ensuring that materials, personnel, equipment, and tools were available for execution. Field verified the Approved Work Requests such that they could be planned effectively, and was Environmentally, Healthy and Safe. Prepared structured job plans from Approved Work Requests with an effective breakdown of the work required including all steps and duration, all relevant documentation and associated planned costs. Interacted with required stakeholders to effectively plan resources (included being provided with ETA of required resource) Released the Planned Work order and Schedule with Initial Dates based upon Material, Services, Special Tools and Equipment availability. Reviewed and released all Program job plans. Created, maintained, continuously improved and utilized Standard Task Lists. Identified and/or initiated changes to Master Data Solicited feedback regarding job plans, including In Progress and Completed, continuously improve. (Plan, Do, Check, Act) Provided support to Reliability to Created and Optimized Program job plans and to SCM to create and maintain Materials and Service Masters, and Provided feedback to CFT on Approved Work Request Quality.
Faithful & Gould 11/2012 – 02/2013
Project Controls Consultant (Senior Scheduler); Seconded to British Petroleum – Whiting, IN. Crude, Reformer, FCC,NHT, STGU.
Responsibilities included generating high quality, deliverable schedules for the Function in the 8Q, 12 week and 6 week windows, ensuring that they are aligned to business priorities and foster safe, reliable area operations, ensured that the functional schedule within Primavera was up to date and accurate, and worked with SPAs and other stakeholders to ensure that activities meet the relevant gate criteria, and were deliverable within the constraints of the function, was liaise with functional SPAs to understand and optimize level 1, 2 and 3 activities, recommended which activities to execute or reschedule when the activity set exceeds functional constraints, effectively managed changes to schedules, communicate the agreed schedules to functional personnel, supported the identification and resolution of delivery risks, resource conflicts, emergent work and schedule waivers, supported schedule gatekeepers in assessment of schedule waiver requests, Monitored site execution efficiency:
updated/assured progress on functional activities in Primavera on a weekly basis, highlighted slippage in the schedule and proposed actions to recover, highlighted and analyzed critical path/s with PM/CM and staff to maintain proactive vigilance to mitigate any approaching manageable constraints, drove continuous improvement in functional scheduling performance, and was liaise with contractor planning teams to ensure alignment of BP and Contractor plans and schedules.
Flint Energy 06/2012 – 11/2012
Project Controls (Senior Scheduler); ConocoPhillips – Ft McMurray, AB. Crude, Reformer, FCC, NHT, STGU,
Responsibilities included managing the integrated planning process and implementation for the Surmont 2 Base Plant Projects; ensured the planning process was followed rigorously, coordinated activities inputs, and facilitated planning knowledge sharing between business units, network of Excellence (NoE) participations, assured provision of an effective integrated plan support for all assets to ensure that the most valuable tasks are executed within the operations (BRISK), led the planning process development and plan reviews, and produce a quality Integrated Plan of various time horizons, ensured achievement of preset planning performance metrics, to publish direct field labor month end man hours by disciplines histograms and next month’s ETC hour forecasts by disciplines. Assure weekly progress feed to scheduling for the Progress Tracking System was accurate by perform spot field audits.
Sun Constructor 08/2011 – 06/2012
Project Controls (Block T/A Sr. Planner/Scheduler); Hovensa; St. Croix, USVI (08/11-03/2012)
Responsibilities included staff guidance to Engineering and Construction supervisors in one or more areas of planning and scheduling expertise by analyzing and evaluating all pertinent data, analyzed portions of major capital projects to plan the most effective execution sequence in light of experience and current industry practices, discussing, coordinated and resolved long term and short term planning and scheduling problems with personnel throughout the Company and with contractor organizations, assists in the technical evaluation of contracts relative to their expertise in planning and scheduling and analyzed in detail performance relative to planning, reporting and forecasting methods of contractors, and evaluated the planning and scheduling information collected from Project Management Teams or contractors and advises supervision of exceptions to plan and potential corrective action and/or impact to the projects. Reviewed project schedules integrity and acted as a P6 SME.
Site Project Engineer / Scheduler / Document Controls Site Manager; Dow Chemicals, Freeport, Texas (03/12-06/12)
Responsibilities included organizing site master stick file, updated SharePoint client documentations need dates, managed mechanical/piping and E/I walk-down teams, evaluated the planning and scheduling information collected from Project Management Teams or contractors and advises supervision of exceptions to plan and potential corrective action and/or impact to the projects, oversaw the development of the level 4 schedule, assured the level 4 schedule meet Dow’s Scheduling Execution Plan Matrix, lead interactive planning session with team core execution staff through the level 4 scheduling 3 pass baseline sessions.
JE Project Management 01/2011 – 08/2011
Sr. Scheduling Engineer; PSE&G (Smart Grid Projects) FERC; Newark, NJ
Responsibilities included maintaining good communications with management, contractors, project team and clients, coordinated with Project Controls Leads and Construction Manager to maintain readiness plans for immediate sound responses to what if scenarios. I worked in the Utilities Distribution, Transmission, and Gas Industry. FERC regulated work involving 500kV-230kV Electrical Utility Provider working thru the Program Level authorization administrative phase, 50%,70%, & 90% estimate phases, A/E award and design phase is work to be perform by outside A/E such as (Burns and McDonald etc...), Interfacing with PM, PCE, Transmission and Distributions PEs, L&P (Licensing and Permitting) Local, State, Federal, and Environmental Municipalities, A/E PMs and staff (Site walks) as a client representative. Smart Grid Capital Projects(Lump Sum), 3rd Party (Cost Reimbursable), Federal Stimulus/Violation Compliance based around Regulatory Commission authorization and approvals to proceed to authorize funding for project and also project for the state department of transportation (DOT); jobs like Highway Bridge Relocation foundation/tower/structure for Electrical; Reconductoring, Substation, Transmission Towers, Switchyard (Inside and Outside plant) Control Level I/II Schedule and Execution Level III/IV schedule integration into the Control Schedule within the Primavera P6 r8 EPS Portfolio network system projects node.
Paton Controls Inc. 09/2010 – 12/2010
Instrumentation/Controls Engineering Technician; Exxon/Mobil 2010 TA, Beaumont, TexasCrude, Reformer, FCC, NHT, STGU
Responsibilities included process unit P&ID walk-down, loop shooting of digital and analog circuits, systematic troubleshooting of digital and analog circuits, 1151/3051 Rosemount transmitter calibrations, instrument function testing & QC/QA/Operations sign off, daily communication with Engineering, and DCS/Plant Operations personnel, and adherence to Safety (STICC), Quality, and Performance.
11/2009-09/2010 L3 Communications (Waco, Texas/ Federal Government Complex)
Program Schedule and Cost Analyst
- Development of initial schedules for statement of work and engineering decision tree draws and technical documentation
- Estimate to complete production schedule updating for P3 Navy Aircraft Maintenance
- Schedule resource loading/leveling (MS Project / SAP PP/PM)
- EV surveillance schedule hour maintenance adjustments on a daily basis
- Analyze cost variances / weekly reporting
- Daily communication with procurement in regards to material short report for delivery status arrival of scheduled equipment/consumable/Work Packages needed to deliver product/execute work/ MATERIAL TAKE OFFSs
- DCMA Earned Value Analysis.
10/2008-10/2009 1099 JEPM (York Penn., Voith-Seimens)
Master Scheduler
- SAP/P6 Production/Execution Scheduler for inspection and refurbishment of hydro-electric turbines for wicket gates, runners, stators, head house, test lab, inspection, logistics etc.
- EVMS set up and dashboard updating
- data mapping
- master data experience
- vendor data
- purchase order migration
- "cut over" experience (meaning moving data from old system into SAP)
- manufacturing environment
- Met with client on weekly basis to update
- Generated weekly performance reports
12/2007-09/2008 Jacobs Field Services
Position: Constructability Coordinator (Cypress California), Primavera P3/5/6, Excel,
BP, Alon, Exxon, NRG, & Chevron Capitol projects. Duties: EPC interactive planning chair Level II, III, to development of on time baseline schedules. Civil drawing take offs. Crude, Reformer, FCC,NHT, STGU,
09/2007-11/2007 Foster Wheeler Coal Plant Outage at AEP Plant (Brilliant, Ohio) was call into progress schedule after original person quit was ask to come to meet with client on weekly basis to update and generate weekly performance reports to Foster Wheeler Management. Primavera P3/5/6, Excel
05/2007-09/2007 on W/9 / 1099 basis JE Project Management (For PMI). (NRG, Chevron, &/BP Alliance projects) provided TAR Defined Estimated Schedule, IPA qualifying schedules, & Staff Loading/WBS. (Truck, Cell, Laptop, Per Diem Package)
Primavera P3/5/6, Excel
07/2006- 04/2007 Roberts Companies. (P3, SAP PS Module) P5 Training paid
Principle Project Controls Engineer (Estimating (bottom up estimating, planning, and scheduling) Scheduling/Change Management/Cost) (Engineering/Construction Capitol Projects) worked in California, live in Texas. (Civil, Arch., Structural, Mech., Piping, E/I, etc.). Served as in-house client gatekeeper of Caps Schd. Appraise, Select, Define, and Execute. Cut over schedules, available only for full time/contract client owner employment supporting project charter and scope development assurance & consulting / schedule development / change management assurance / cost analysis & progress reporting / 35-40+ hours/week. Primavera P3, Excel.
12/2005-06/2006
CDI (Scheduling/Cost Engineering) (P5 Trained) Shell Deer Park, Texas, Primavera P3, Crude, Reformer, FCC,NHT, STGU
Principle Project Controls Engineer, Stafford/Deer Park(Shell Deer Central Control Center Relocation Project( Scouting, FEL 1,2,3 thru AFE $2.6MMM) Scoring 4.2 IPA Schedule review of 900 line 2.6 MMM Project for AFE Schedules, Logic integration and 3 pass, Resource Loading, Generate Custom Tabular reports/Resource Curves/Project individual or total histograms, etc…
P3, Excel, Access, MS Projects to Primavera 3.1 Project Planner
• Developed, resource load and maintain schedules for multiple projects, using Primavera (P3 3.1 & e/c 4.1 to 5.0) Appraise, Select, Define, and Execute, & Operate.
• Cost Control for multiple projects; Develop scheduling and cost template for proposals.
• Track progress and issues in regards to meeting critical milestones and the completion dates.
• Tracking and reporting on critical path, keep management informed by creating standards and reports.
• Work profile includes developing EPS, getting inputs from engineers, department heads and making feasible schedule.
Preparation / Review of Early Cost Estimates
Review of Contractor Estimates
Estimate Aggregation
• Assist in evaluation of changes to funded scope
• Review contractors’ estimating systems for validity and contractual compliance
• Coordinate estimate risk analysis effort
• Respond to estimate inquiries from the project team
09/2005-10/2005
Austin Ind. Inc.
IP Mansfield, La.
Planner/Scheduler
Per Diem, Benefits, Equipment (cell phone, computer, ect. necessary to function effective) Primavera P3, Excel
07/2005-08/2005
J E Project Management
Eastern Division Greenville, SC/DC/Florida Primavera P3, Excel
Principle Project Controls Manager E21 (FEMA Disaster / Temporary Housing Assessment Team)
Salaried Non-Exempt (all expenses direct billed rental car, airfare, housing)
Developed definitive MHs / Cost from the FEMA Project Level 1 Rough Order Of Magnitude
IDed and defined Tasks and Subtasks from the conceptual issued scope of work estimates for SAP WBS for Cost Centers, GL Account, ect…
IDed inadvertent cost double dips in the conceptual estimate for MH / Cost reporting accuracy
04/2005-07/2005
Technip
Principle Project Controls Manager (CITGO Reformer Project) Crude, Reformer, FCC, NHT, STGU
Salaried Non-Exempt, Primavera P3, Excel
Detailed Engineering and Design (Estimating, Planning, Scheduling, Performance Tracking, and Change Management) Primavera Project Planner
10/2004-03/2005
Fishbone Engineering Inc.
T/A Coordinator (Praxair & PRSI (CROWN Refining T/A), Primavera P3, Excel Crude, Reformer, FCC, NHT, STGU
Liaison between Engineering/Operation to EPC Project Controls
SAP (Matrix Development / Outage tag list activity exporting)/Primavera Project Planner
04/2004 - 05/2004
CDI Engineering Solutions (Lyondell Chemical Company/Bayport, Texas)
Position: Sr. Field Planner IIC, 1.5 OT, PTO, 401k etc...
Key Role: Planner SAP, Primavera P3, Excel
Department: Maintenance
Basic Function: My role within the Maintenance Operation Workflow Process (MOWP) is to develop planned job packages for maintenance repair work and improvement projects based on priorities established by the Production Maintenance Coordinator (PMC/gatekeeper). The job plans must full satisfy the notification scope and include all materials, services, resources, and appropriate scheduling logic between individual operations or task. I insure that sufficient amount of work is planned to satisfy production needs as well as the available man-hour capacity.
Responsibilities:
My function/role/position is responsible for the following:
* Providing necessary planning information that insures safe efficient execution of critical priority 1 - 4 jobs/improvement projects/shutdowns.
* Participating in the management of notification and work order
backlog management.
* Reviewing backlog and planning list for duplicates.
* Grouping notifications together that can be planned and worked as a
single order that optimizes utilization of resources.
* Insuring plans were in places that meet the timing requirements of the process units.
* Checking for understanding of scope through notification text and
field work through.
* Changing notification(s) to orders which includes:
* Insuring that order type and maintenance activity types were
accurately assigned on the order.
* Using or creating task lists for repetitive jobs.
* Using of creating BOMs where appropriate
* Building of copying the job plan that clearly shows:
* package special instructions and required documentation such as MOC
information, QA/QC needs, piping schematics, etc...
* Required skill crafts and duration.
* Specialty tools, equipment.
* Optimal scheduling logic between operations/tasks.
* Operation for capital spare repair, where necessary.
* Reservation or purchase order for necessary commodities
(components)/equipment.
* Participating in bidding process and requisitioning for third party
services.
* Forwarding job packages to supervision.
* Soliciting feedback on executed jobs plans and making any necessary changes to insure planning and work efficiencies continued to improve.
* Writing necessary change orders for third party services upon job completion.
* Participating in the identification and implementation of reliability driven improvements.
* Attend daily maintenance look-ahead meetings. (CATS daily time
entry)
5/2003 - 11/2003
Austin Industrial Inc. (GB Bioscience a Syngenta, Company Green Bayou)
Position: Sr. Planner/Scheduler, Primavera P3, Excel, SAP, MS Projects
* Identify clients Fall Outage defined scope of work for all crafts
(phase/time constrains) MPP exporting to P3 (Randy Woods P3 Scheduler)
* WBS development/project FEL duties
* Attend client project team building sessions
* Co Ordinate client maintenance staff to accomplish the merger of the
Maintenance Outage execution plan for SAP R/3 PP/PM to MS Project to P3
(Supervised Client 3 Maintenance Planners)
* Audited work orders steps for logical order/process sequencing (with assistance of client Process Engineering staff)
* Created Fall Outage Maintenance Staffing Plan for recommendation and
acceptance for all crafts.
* Developed progress tracking system to monitor execution
performance/percent complete/current budget vs. control budget
* Developed work execution contingency plans (work arounds), assisted
HSE in JHAs
1/03 - 3/03
Jacobs Facilities Inc.
Lawrence Livermore Laboratory: Livermore, California
Position: Instrumentation Technician
* Laser tube installation
11/02 - 12/02
Austin Industrial
Equistar Chemicals: Bay Port, Texas 7/12s
Position: Instrumentation Technician
* Instrument & Electrical decommissioning/commissioning
9/02 - 10/02
Industrial Instrumentation and Electrical Inc. Crude, Reformer, FCC, NHT, STGU
Position: Instrumentation and Electrical Technician
* Compressor maintenance (Thrust probes set @ -10VDC tuned to VSI,
Radial probes set @ -9.5VDC two 45 degrees top dead center for horizontal and
vertical shaft probes all probe reading were recorded and plotted on graph
paper), also the Key Phase probes, journal TEs and vibration switches
were checked on TA project
* Escort Limitorque maintenance service vendor via Job Package to
inspect actuators/valves tagged by Operations, our primary function was to asses,
diagnose, determine proper corrective action, I took digital pictures of
valve orientation for reinstallation, I also was required to generate a
task level plan consisting of resources, quantities, integration logic,
durations, and man hours to execute this Scope Change work
* Installed new tubing
* 480 Vac 3phase thru 4160 kV LOTTO
* Loop shooting, commissioning, & start-up coverage
11/95 - 8/02
Fluor Corp. Inc.
Position: Sr. Project Controls Specialist (E21), Primavera P3, Excel, SAP
Was responsible for performing highly complex Project Controls activities
and overall Project Controls efforts for projects and assignments (areas
in/out of the US). My responsibilities included, but were not limited to
the following:
* Developed, implemented, and directed the total Project Controls program
on a Exxon/Mobil/Baytown, Texas and BP/Pasadena, Texas projects
($80MM-$130MM) projects
* Ensured that the Progress Tracking software was installed onsite and
operable
* Analyzed variance in cost and schedule performance against the plan,
and communicated the reasons for the issuance of variance mitigation plans to
Project Management
* Development of Commissioning procedures/ Turnover Packages for I&C
Cut-overs, with great detail given to safety as it applied to LOTTO Procedures
* Served as the Construction Coordinator, attending daily client
maintenance meeting and generating a 2 Week Look Ahead schedules weekly
* Provide meaningful and accurate historical data and other duties assigned
* Assigned to field to plan and schedule execution of construction and
Turnarounds in P3
* Created project useful Excel spreadsheets
* Interfaced closely with operation management to coordinate new
instrument cut-overs
* Attended daily maintenance scheduling/look ahead meetings
2/01 - 4/01
Larkin Ent. Inc
Lake Road PG&E Power Plant/ Putman, CT.
Position: Instrumentation & Controls Specialist
* Commission of all electro/mechanical, instrumentation, rotating
equipment and compressors, PLC ect... Combined Cycle Turbine Unit (GE)
Fossil Fuel Plant
* Daily interfaced with Owner Validation Turnover Reps. & Vender
Equipment Reps
6/95 - 7/00
Z C C. (Home Office/Field) (CMIS Job Cost Training), Primavera P3, Excel, SAP
San Antonio Main Office/ Equistar Chemicals Corpus Christi, Texas
Position: Project Controls Rep. I (SureTrak, Primavera, & CMIS)
* Responsible for auditing companywide project progress to the latest
Data Date
* Created job packages for all turnaround disciplines/ Commissioning
Procedures per field walkdown/P&ID, ISO, Electrical/Instrumentation drawings
10/98 - 2/00
CIMCO a Washington Group Company, Primavera P3, Excel, SAP
Union Carbide Chemicals (DOW)/ Texas City, Texas
Position: Lead Maintenance Planner SAP/R3 Project Planning/PM, PP, MM
Module/MS Projects
* Attended daily unit maintenance meeting to be assigned work
Activities and schedule constraints for all disciplines
* Performed job walk down to ID all staging and special need items
* Requisitioned vender for specialty services to complete certain
activities
* Created and executed Purchase Orders for consumable for planned
activities
* Attended Weekly Stretch Goal meetings
* Released work for activity execution and progress activities start to finish
6/97 - 2/00
N Group Inc.
Position: Instrument and Electrical Technician (Flint Hill Resources, Steve Edwards Client) Crude, Reformer, FCC, NHT, STGU
* Compressor maintenance (Thrust (axial motion) probes set @ -10VDC
Tuned to VSI, Radial probes set @ -9.5VDC two 45 degrees top dead center for
(radial motion) shaft probes all probe reading were recorded and plotted
on graph paper), calibrated (PSL, PSLL, PSH, PSHH) switches also the Key
Phaser probes, journal TEs and vibration switches were checked on TA
project.
* Calibration of compressor deck control panel switches and gauges
* Calibration of Rosemount transmitters 3051 with
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: