Project Planner, Balfour Beatty, South East Rail Network

START Date: 
January, 2002
END Date: 
December, 2002

Planning both P-Way and Signals for the London South East Rail Network, involving new projects and planned maintenance. Producing reports for use by both project teams and senior management, procurement, resourcing and costing. In terms of Track work, I have been involved in planning work on High Speed main line, heavy haul, urban mass transit commuter systems and light rail transits and also switches and crossings and special track work. On the signaling I was involved in planning for cabling, installation, commissioning and testing in the following type of projects: Time Division Multiplex (TDM) and Frequency Division Multiplex (FDM) renewals, Solid State Interlockings, Train Protection Warning System (TPWS), Level crossings, Interlocking Renewals, Point Renewals, New Power Supplies and Re-signaling projects. Based at London Bridge Station, I covered the London Area and the Kent Coast.