Sr Planning & Coordination executive, TRIOTEP ENGINEERING & CONSULTANCY LLP, DANGOTE FERTILIZER PROJECT
ü Preparation of planning schedule at different levels.
ü Recourse Planning & assignment,Interaction with field personnel for developing schedule activities.
ü Baseline Schedule preparation and progress comparison.
ü Preparing Daily/weekly/Monthly progress reports & update.
ü Preparation/updating of progress 'S' curves for reporting progress to Client/Management.
ü Report generation and customization of reports.
ü Understanding project work scope, contract milestones.
ü Preparation of progressive invoices (RA) for the work done and planning of resource, machinery required to complete the job as per schedule.
ü Tracking of material consumed, perform periodic material reconciliation and identification of material required well in advance.
ü To take part in site inspection and preparing reports and documentation of site inspection.
ü To coordination with site regarding Erection and commissioning of equipment as per protocol and final documentation for handover of project.
ü Preparation of QA/QC documents (Quality Control Plan,Work Method Statement, Check list/Format, ITP etc.) & review.
ü Fabrication & installation of cable duct, instrument stanchion, J.B frame, and panel base frame, as per standard drawing & field situation.
ü Erection of different size cable tray /duct/conduit etc.
ü Installation of panel/cabinets and console etc. as in GA drawing.
ü Earthing for panel/cabinets, console & field instruments, Cable trays, JB etc.
ü Meggering of control, signal & power cables.
ü Continuity, glanding & termination, loop(core/hot) checking using proper ferruling philosophy.
ü Installation, Testing & Calibration of Field Instruments.
ü Strock Checking of control/on-off valve and testing calibration of MOV.
ü Supervision for impulse piping and tubing (CS, SS, AS) as per hook-up & MOC.
ü Execution of airline & air header for control & pneumatic/ON-OFF valve.
ü Preparation of sampling/tapping point for field instruments followed by piping GA.
ü Installation of PA&EPABX, CCTV system.
ü Supervising of different kind NDT(RX) & Heat Tracing testing as per standard procedure & MOC.
ü Installation of security access control system.
ü Conducting of Hydro/pneumatic test for impulse pipe/tube.
ü Erection & supervision of power & distribution transformer.
ü Installation of electrical equipment’s of 33KV, 11 KV, 6.6 KV,415/433 V substations.
ü Erection & supervision control & power schematic checking of LT & HT switch gear/panel system.
ü Plant lighting & lightening protection system.
ü Installation of DG set.
ü Erection & supervision testing & Charging IPBD & SPBD,LT/HT bus duct along & NDT.
ü Having well knowledge on testing equipment for calibration laboratory.
ü Terminology of cable schedule, Instrument Index, Termination/interconnection Schedule, I/O list,P&ID,PFD,SLD,schematic ,GA etc.