Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Sheb Shafi

First Name: 
Sheb
Last Name: 
Shafi
A Project professional with five years of experienceworking in the construction Industry. Currently workingin project controfs on the Q6 Lot-4 Framework atHeathrow Airport. An Associate member of the Association for ProjectManagement with aspiration to become a full memberin the near future. Skills & Knowledge Working effectively within time and budget constraintsMaintaining company standards of Quality, Health andSafety.Earned Value ManagementKnowledge of NEC3 form of contractsProficient end-user of Primavera P6, MS Word, Excel, PowerPoint and Project.Practical experience in geology fieldwork, setting out andextensive use of surveying instruments.Hold a full UK driving licence and Airside driving permitTrainingAPMG - Foundation in EVM.GMH Planning - Introduction to NEC3.Built intelligence - NEC3 structured learning.Good foot Development - Management developmenttraining courses entailed personal effectiveness,negotiation and presentation skills.CTS - Setting out for EngineersCSCS Qualified - Supervisor level.Internal Training in collaborative planning, financial andcommercial awareness, supply chain management, BIM,CDM 2015, and service protection best practice. Relevant Work ExperienceAug 2011 - Present, Sep 2015 - Present,Various Roles at Morgan Sindall pie - (Heathrow);Project Controls Engineer, Q6 lot 4 Framework(£ 169ml) Working with project teams to maintain project schedules in line with contract requirements.Producing monthly EVM reports for internal and external stakeholders.Carrying out WBS-CBS mapping to incorporate in performance measurement baselines.Establishing control accounts plans to define the responsibility, scope, and earned value techniques.Producing time phased planned value curves against the contract program and budgets.Monitoring Risk to track position of contract risk allowances, spend and release.Maintained WBS change log to verify change control.Organising and holding internal project review meetings.Produced and maintained KPI reports for client and ensured improvements were made.Advising teams on corrective actions to ensure high standards and quality of reports.Supporting project teams to monitor and improve forecast predictability.Processing analytics via electronic change management system (CEMAR) to verify agreed changes in linewith reporting calendars.Assisting Senior Management and Project Controls Manager with continual improvements to processesand procedures.Administering of NEC3 Contracts. Dec 2014- Sep 2015 Graduate Engineer, Sierra Taxiway Realignment (£20m)Raised, priced and agreed compensation events.Provided operatives and management with technical assistance.Presented company and project specific inductions.Proposed engineering solutions to problems on site and seeking approval from designers.Compiled information for issuing early warnings and site measures of additional work.Completed quality assurance and non-conformance reports to comply with management systems.Attending planning meetings and producing three weekly programs to assign resource, time, cost codes,forecasted quantities, target output and risks against activities.Oct2014- Dec2014 Graduate Engineer, Terminal 4 Code F Stands(£ 1 Om)Supervised and managed sub-contractors in completing finishing works to successfully handover stands.Booked and maintained detailed records for the site diary.Liaised with end users and stake holders within operational and airline teams.Sep 2014 - Oct 2014 Graduate Engineer, Runway Rehabilitation (£31 m)Assisted project engineers and site management team during night shifts.Completed commissioning and handover documentation.Managed and ensured all snagging works were being completed to acceptable standards by subcontractors.July 2013 - Sep 2013 Summer Placement Student, Taxiway and Cul-De-Sac Reconstruction (£3.1 m)Designed a Digital Terrain Model for surveying, setting out and automatic grade control to concrete paving.Processed material reconciliations to monitor imports, exports and wastage.Completed site measures to aid project team members.Aug 2011 - July 2012 Year Out Student, Energy Infrastructure Project (£35m)Carried out setting out duties accurately and on time.Operated and promoted a high standard of health and safety through implementation of company codes.Provided quality assurance through completion of company standard forms.Education and Qualifications2009 - 2014 University of Surrey- (Guildford, UK)MEng Civil Engineering (Thick) Sandwich. The five year Master's degree included construction law, project and riskmanagement.2007 - 2009 Richmond upon Thames College - (Twickenham, UK)A-levels in Mathematics (B), Computing (B), Physics (C), and AS-level in Economics (E).2002 - 2007 Lampton School - ( Twickenham, UK)10 GCSEs obtained grades A to B. 
Professional Since: 
Aug-2011 (13.3 yrs experience)
Oldest experience: 
Aug 2011 (13.3 yrs experience)
Years Experience: 
6

Market Place

No results found... (try selecting a different content filter)