Thiyagarajan T
T. THIYAGARAJAN
E-Mail: thiyagarajan24@gmail.com
Phone: +971-565866978, +91 -9160986979
PROFESSIONAL SYNOPSIS
- 10years of experience in Project Planning, Project Monitoring & Controls, Extention of time Claims and Tender Preparation.
- A Civil Engineer with 2 Years Full Time Post Graduate Diploma in Project Engineering and management.
- Currently associated with Jazeera Emirates power –Dubai, UAE as Sr. Planning Engineer.
- Experienced in High Rise Residential buildings / Substation and Power plant works.
- Proficient in use of Planning & Civil engineering based Software Applications (P6, MSP, AutoCAD)
- Strong negotiation & analytical skills with the ability to network with Project Members, Consultants, Sub-Contractors with consummate ease and working in International Environment.
ACADEMIC QUALIFICATION
- Master’s Degree in Project Engineering and Management (PGDPEM) from National Institute of Construction Management & Research, Pune in 2008 (Executive Batch).
Research: Bridge Deck Evaluation using Ground Penetrating Radar.
- Bachelor's Degree in Civil Engineering from S.R.M Engineering College (Anna University), India in 2006. Research: Implementation of Remote Sensing Technique in Construction Projects.
WORK EXPERIENCE SUMMARY
TATA Projects Limited, India Apr-2008 to Oct-2015
Growth Path:
- Apr’08 to Mar’09 Management Trainee,
- Apr’09 to Mar’11 Senior Engineer – Planning,
- Apr’11 to Mar’13 Assistant Manager – Planning,
- Apr’13 to Oct’15 Manager – Planning.
Project Undertaken:
- Mantri Lithos - Residential towers, Bangalore (4B+G+21 Floors)
- Mantri Webcity - Residential towers, Bangalore (10B+G+17 Floors)
- 8MTPA - Crushing, Washing and Screening Iron Ore Plant, Khondbond, Odisha
- 2 x 500MW Thermal Power Plant (BOP Scope), Bhusawal, Maharashtra
Jazeera Emirates Power, Dubai Oct-2015 - Till now
Project Undertaken:
Project: 05 nos 132kV GIS Substation works (132kV/11kV Muhaisanah SS, 132kV/11kV Treatment plant SS, 132kV/11kV Marina Community SS, 132kV/11kV Shipment SS & 132kV/11kV Corniche SS) – AED 400 Million.
Client: DEWA (Dubai Electricity & Water Authority)
ROLES AND RESPONSIBILITIES
Project Planning & Monitoring
- Responsible for Preparation of Cost & Resource Loaded Baseline Schedule for the Project.
- Prepare the Cash flow and other Progress related Curves.
- Schedule Updates, Progress monitoring and Reporting
- Monitoring progress throughout all phases and comparing to the baseline, preparing Variance Report, Exception Reports etc.
- Periodically analyze the Programme and advise the site management with regards to activities that are delayed.
- Prepare the recovery Schedule if the project is delayed.
- Prepare the look ahead schedule for internal Construction Team
- To participate in the progress and coordination meetings in order to discuss the status of the project
- Generation of Project Progress Reports including Daily, Weekly, Monthly, etc.
Extension of Time Claim
- Prepare Extension of Time claims (EOT) using various methodologies such as Time Impact/Window Analysis / Impacted as planned.
- Coordinate with Contracts Team to notify a potential event of delay referring to the pertinent contract clause
- Maintain Delay event register / Notice of Delay log.
- Compile contemporaneous records for each event
- Prepare the revised Schedule based on the Awarded Extension of Time
Subcontractor Management:
- To review and evaluate the subcontractor’s schedules, reports and monitoring submittals in order to align the subcontracted items as indicated in the contract schedule.
- Preparation of delay notices to Subcontractors.
- Review and reply of Subcontractors Claim.
- To track and monitor Shop Drawing, Material Submission & Material Procurement.
- Attend Major Subcon progress monitoring meeting.
WORK EXPERIENCE DETAILED
TATA Projects Limited, India.
Apr-2008 to Oct -2015 - Planning Manager.
Project Undertaken:
- Mantri Lithos - Residential towers, Bangalore, India.
Building Type : Residential Building,
Floor : 4B+G+21 Floors
Project Cost : AED 120 Million
BUA : 1300,000 m2
Client : Mantri Developers
Duration : 27 Months
My responsibilities include preparing the Baseline Schedule, Target Schedule for this building, reviewing the Subcontractor Programme, coordinating with all the subcontractor for their progress reports, aside from the preparing all the project reports such as Daily/Weekly/Monthly Reports etc.
- Mantri Webcity - Residential towers, Bangalore, India.
Building Type : Residential Building,
Floor : 10B+G+17 Floors
Project Cost : AED 110 Million
BUA : 1250,000 m2
Client : Mantri Developers
Duration : 30 Months
My responsibilities include preparing the Baseline Schedule, Target Schedule for this building, reviewing the Subcontractor Programme, coordinating with all the subcontractor for their progress reports, aside from the preparing all the project reports such as Daily/Weekly/Monthly Reports etc.
- 8MTPA - Crushing, Washing and Screening Iron Ore Plant, Khondbond, Odisha
Building Type : Industrial - EPC Contract,
Project Cost : AED 224 Million
Client : TATA Steel ltd, India.
PMC : TATA Consulting Engineering ltd
Duration : 23 Months
Self was the Lead Planning Engineer for this Industrial building located at Orissa forest area. My responsibilities include preparing the Baseline schedule and preparing the control budget for the same to monitor the cash flow and control profitability margin periodically. Also involved in preparing the Variation claims / EOT, Detailed Procurement/ delivery plan, Engineering deliverables plan in line to the Baseline schedule coordinating with all disciplines, aside from the preparing all the project reports such as Daily/Weekly/Monthly Reports etc.
- 2 x 500MW Thermal Power Plant (BOP Scope), Bhusawal, Maharashtra (On-site)
Building Type : Industrial - EPC Contract,
Project Cost : AED 1.1 Billion
Client : Maharashtra State Electricity board.
Duration : 32/ 36 Months
Scope : Civil, Mechanical, Electrical &
testing works for BOP package.
Self was the onsite planning engineer for the Thermal power plant project from the beginning till Handing over - Which involves preparation of the detailed Programme as per the Approved Baseline schedule, reviewing subcontractor Programme for Civil and Electromechanical works, coordinating with all the subcontractor for their progress and review the progress periodically by conducting weekly meetings etc. Also engaged in the availing the statutory approval from the Authorities, aside from the preparing all the project reports such as Daily/Weekly/Monthly Reports etc.
Jazeera Emirates Power, Dubai:
Oct-2015 to Present as Sr. Planning Engineer
Project Undertaken:
- 05 nos of DEWA Substation projects, Dubai,
Building Type: Substation
Project Cost : AED 400 Million Duration : 22/27 Months
Client : DEWA / DP world / ICD PMC : Energo Projekt Entel, Dubai.
- Currently Working as a Lead Planner these Projects from the Project start, Responsible for preparation of Technical Submission in the Tender Stage, Preparing & getting approval of cost & resource loaded Baseline Schedule, Delay Notifications to Client, EOT preparation against Client, Delay notification to Subcontractor, Preparation of revised Programme based on the awarded EOT. Review of subcontractors Programme, reports & their Claims and all other usual Planning related works.
PROFESSIONAL TRAININGS
- PMP Exam Preparation Course:
Completed online course on Professional project management Program from TATA - Cambridge Institute.
IT SKILLS
- Primavera – P 6 - 10 Years
- Microsoft Project – 2007 - 5 years
- Microsoft Office (Advanced) -12 years
- Wrench- 1 Year
PERSONAL DOSSIER
Date of Birth : 24th December 1983
Present Address : Dubai- U.A.E
Gender : Male
Languages Known : English, Hindi, Tamil, Telugu
Nationality : Indian
Visa Status : Residency Visa.
Driving License : UAE & INDIA,
Marital Status : Married.
ANNEXURE
INTERNSHIP
Organization: Essar Power Ltd., Munnar, Kerala
Title: 2x30-MW Hydroelectric Project
Period: Apr’07 to Jun’07
Key Learnings:
- Exposure to project management skills with the site activities and functionality
- Learned about contractual documents and prepared detailed schedule in line to the project requirement
- Acquired knowledge of sequence of operation involved for commissioning of the Hydro Electric Power Plant
THESIS
Main Thesis:
Title: Implementation of Remote Sensing Technique in Construction Projects
Period: 2007-2008
Key Learnings:
- Remote Sensing and GIS based end to end solution for Highway construction activities
- Interlinking the remote sensing data with the project schedule for monitoring and controlling of project
Mini Thesis:
Title: New Exploration Licensing Policy (NELP)
Period: 2005-2006
Key Learnings:
- Policy formulated for exploration & production of oil & natural gas to meet the day to day domestic requirement
ACADEMIC PROJECTS
Title: Bridge Deck Evaluation using Ground Penetrating Radar
Period: 2005-2006
Key Learnings:
• Benefits of Non destructive test for bridge maintenance
• Time and Cost effective method adopted for the monitoring and proactive maintenance of bridges
Title: Selection of Potential Site for Solid Waste Disposal Using GIS
Period: 2006-2007
Key Learnings:
- Utility of Remote Sensing Technology in identification of wasteland and assessment of the capability of GIS Technology for site selection for waste disposal
- Industry:
- Region: