Thomas Bolzmann
07.1996 - 03.2000
Project Controls Engineer in a Consortium consisting of 4 parties being responsible for the planning and control for a USD 1.4 Billion Project in Indonesia. The Consortium had to supply a two unit coal fired power plant with 610MW of power output each. I was representing the Consortiium Leader and as such responsible for the overall project schedule.
04.2000 - 10.2003
Lead Project Controls Engineer in a Consortium consisting of 4 parties being responsible for the planning and control for a EURO 800 Million Project in Turkey. The Consortium had to supply a two unit coal fired power plant with 650MW of power output each. I was representing the Consortium Leader and as such responsible for the overall project schedule.
11.2003 - 12.2006
Lead Proejct Controls Engieer in a Consortium consisting of 2 parties being responsible for the planning and control for a EURO 3.4 Billion Project in Finnland. The Consortium had to supply a nuclear power plant with 1600MW of power output. I was responsible for the project controls for the supply of the conventional island and associated interfaces to the nuclear island.
01.2007 - 04.2013
Head of Project Controls for all projects being part of the portfolio of Nuclear Power Plants and Steam Power Plants including project aquisition and project execution.
05.2013 - to date
Head of Project Controls for all projects being part of the portfolio Energy Transmission, especially HVDC, including project aqusition and project execution.