Richard Horton
RICHARD T. HORTON
Work Control/Project Control - Sr. Primavera Planner / Scheduler / Analyst
Cell: 704.467.6788 email: Richaudt@aol.com
DUKE ENERGY Corporation, Charlotte NC Mar 2010-Oct 2015
[Contract Assignments]
T & D Project Controls - DEP Carolinas East Region - Sr. Project Controls Analyst (PCS)
As a Sr. PCS responsible for tracking and managing changes (incl PM dashboard and KPIs) to the project scope, resource-loaded schedule and cost baselines for major T&D programs including the upgraded replacement of critical AT&T telecom equipment and configurations; PMU installations and NERC CIP Battery Replacements at Transmission and Distribution substations for Line and Relay construction.
Managed per Project Management Center of Excellence Standards over 225 sub-projects (Green and White-ranked) on which complex aspects of individual project estimating; scheduling, change documentation and cost control were performed while reporting up to the program and portfolio level. Provided leadership in the development and generation of daily, weekly, monthly and quarterly project controls reporting including to sr. mgmt. Identified and processed Notices to Proceed (NTP), change requests (PCR), change notices (PCN) and/or change orders (PCO) in a manner compliant with Duke internal governance standards and the terms and conditions of relevant contracts. Developed and maintained assigned 45 funding level projects against phased project funding for Schedule, Cost and Budget.
High proficiency user of Business Objects; Maximo; Primavera P6; MS Project/MS Office Suite, Passport, Prolog, Peoplesoft, Visio, PowerPlant, Risk management tools and Monte Carlo analysis of P6 schedules.
CCR/ABSAT/CCP Governance-Work Mgmt Group - Work Control Mgr / Sr. Business Analyst
Recently served as the interim Work Control Manager for the Ash Basin Strategic Advisory Team/Coal Combustion Products (ABSAT/CCP) Work Control Group responsible for the scheduling, coordination, preparation and execution of all tasks associated with new business, corrective, preventative and predictive maintenance tasks, projects, switching evolutions and associated tests. Responsible for the development, execution and monitoring of the Work Management policies, programs and processes as well as contributing support of compliance commitments with external regulatory agencies.
As part of the original team assembled to develop a comprehensive response to the Dan River coal ash spill, trained and managed 9 work package planners in achieving significant improvement/productivity on both large and small CCR-based projects. From concept, developed work control code structure and process mapping to align with P6 WBS. Continually sought and implemented methods/codes to improve the Work Control System (IBM’s Maximo) as well as monitored and reported project status monthly to Senior Management. Effectively coordinated work between Duke internal work groups/departments and outside organizations (e.g., regulatory agencies, suppliers and contractors) to efficiently and effectively address CCR program issues.
Grid Modernization (PMO) - Sr. Planner / Scheduler
Assisted in the managerial administration of the $1.5B DOE matched Grid Mod program which deployed over 530,000 residential smart meters, 625,000 electric meters and 364,000 gas modules. Developed detailed Primavera schedules for the program’s projects using input from functional areas and ensuring schedule met project/program objectives. Presented proposed changes and alternatives to management and coordinated inclusion of changes into the PMO program schedule and cost estimates. Achieved program savings of approximately 3 million avoided customer outage minutes and eliminated more than 500,000 truck service calls. Major equipment deployments included Distribution Automation (DA) and Advanced Metering Infrastructure (AMI) within a project portfolio (PPM) of 112 projects.
DSDR Carolinas/Smart Grid Program - Sr. Planner/Scheduler/Business Analyst
Developed and maintained the fully networked/ integrated P6 schedule consisting of over 75,000 activities tracking all component projects in the DSDR Carolinas Program including the plan, design, build, and execution of the Feeder Conditioning; Substation Modifications; and DMS Software Upgrade Projects. Monitored and ensured the effective levelization of the task level schedule to ensure the safe and effective utilization of work week resources. Coordinated the multi-disciplined regional teams to ensure holds or restrictions were eliminated prior to work entering the E-0 schedule. Reviewed, analyzed and reported proposed changes to the project plan and cost estimate.
These projects consisted of the installation of over 10,000 distribution feeder devices, i.e. capacitor banks, voltage regulators, medium and low-voltage sensors and line reclosers. This schedule tracked the Megawatt Optimization and Secondary Optimization work performed on over 315 transmission-to-distribution substations in North Carolina, all down to the executed work order level. Successfully supported the system level demand reduction capability and the estimated incremental 235MW originally anticipated.
Rowan County Combined Cycle Plant - Lead Construction Planner/Scheduler/Cost Analyst
Developed and maintained the EPC schedule for the 2 on 1 Combined Cycle Rowan County Station for Progress Energy / Carolina Power and Light, Salisbury, NC; and other CC projects from 2001 through 2004.
SHAW POWER GROUP dba Chicago Bridge & Iron, Inc (CBI), Charlotte NC Jan 2005-Sep 2009
Project Controls Manager/Sr. Planner
Trained and managed six planners in achieving significant improvement/productivity on large projects:
Dominion Power: VA High Energy Center, Greenfield 500MW CFB Coal Plant; $1.2 billion
Central Louisiana Electric Co (CLECO): Greenfield 500MW CFB Coal Plant Project, $867 mill
Duke Energy Corp: Marshall FGD Project, $460 million and SCR Project, $340 million
Belews Creek FGD Project, $498 million
EDUCATION
CambridgeCollege, Cambridge, Massachusetts Masters, Business Administration - Finance
Universityof Illinois, Chicago, Illinois Materials Engineering / Structural Design (Civil)
References and detailed information furnished upon request
DIVERSIFIED SUPPORT SERVICES, Chesapeake VA
Outage Planner/Scheduler, Jan 2000-May 2000
Yorktown Power Station, Virginia Electric Power Company, Yorktown, VA
RODERICK ENTERPRISES, Crystal River FL
Planning Programmer/Database Analyst, Jan 1999-Nov 1999
Darlington Nuclear Generating Station, Ontario Power Generation, Bowmanville, Canada
VOLT SERVICES GROUP, Orange CA
Senior Planning Engineer, Jul 1998-Jan 1999
Y2K Project; Wires Software Integration Program, Southern California Edison
G.D. BARRI & ASSOCIATES, INC., Phoenix AZ
Senior Planning Engineer / Outage Coordinator, Aug 1996-Sept 1997
Indian Point III Nuclear Power Station R09 Refueling Outage, New York Power Authority
ZionNuclear Power Station Z2R14 Refueling Outage, Commonwealth Edison Corporation
GM / DELPHI INTERNATIONAL-MANPOWER, INC., Hueytown, AL
Critical Path Manager / Engineering Change Coordinator, Aug 1995-Jul 1996
RUSSELL PROGRAM MANAGEMENT, INC., Birmingham, AL
Owner’s Schedule Representative / Consultant, Aug 1989-Jul 1994
STONE & WEBSTER ENGINEERING CORPORATION, Boston MA
Assistant Lead Cost and Schedule Engineer, Jan 1982-Jul 1989
PERINI CONSTRUCTION & LAND DEVELOPMENT CORPORATION, Framingham MA
Project Engineering Management Training Program, Jan 1980-Dec 1981
EXPERIENCE / SOFTWARE SUMMARY
Expert in providing a wide range of planning, scheduling and work control solutions, including portfolio management technical support [db admin]. Projects range in phase from justification through operations. Skilled with scheduling projects incorporating major equipment and facility modifications. Highly proficient with JIRA, PassPort, Maximo Crystal Reports and Project View. Expert user of specialized scheduling management and presentation applications software Primavera (all versions incl. P8.1); Access; Visio; Microsoft Project and most MS Office Suite products.
EMPLOYMENT HISTORY
- Supervised, executed daily operations of major utility’s work control group.
- Developed detailed baseline schedules & goals in accordance with industry PMBOK and PMI standards, and best practices working with project teams [AGILE].
- Identified optimal sequence of operations & efficient use of resources produced critical path schedules highlighting long lead time items and potential program schedule conflicts.
- As database administrator developed, maintained, and updated project databases ensuring unified Primavera system alignments, i.e. Work Breakdown Systems, Activity Codes, etc.,.
- Developed/Man-load WBS constructs. Prepared and presented related management reports.
- Supervised, executed daily operations of schedule maintenance and analysis.
- Support the peer group process to ensure adoption of best practices into standard processes.
- Demonstrated ability to work independently, achieve deadlines and handle multiple assignments.
- Excellent organizational, planning and interpersonal skills.
- Ability to execute independent judgment.
- Demonstrated excellent oral and written communication skills.
- Ability to work closely with all levels of management.
- Demonstrated conflict management skills.
- Strong leadership abilities.
- Industry:
- Region: