Muhammad Bilal
WORK EXPERIENCES
1. From December 2014 to date in Pipelink Construction (pvt) Limitedas aPlanning Engineer:
JOB RESPONSIBILITIES
At PCL Headoffice:
· Tender’s Evaluation
· Project Scheduling in Primevera P6 & MS Project 2010 for Bids
· Resource Loading& S-Curves
· Costing Assistancy in Projects
· Labor & Equipment Histograms
· Tender package preparation
· Site Work Monitoring from HO & Monitoring sheet preparatoin & maintaining.
· Preparation & Updation of S-Curves & Histograms b/w Planned Vs Actual Progress % of Estimated Wts.
· Dia-Inches Calculation & Drawings Evaluation
· Join Pre-Bid, Bid Opening & Site Visits Meeting for UEP, SSGC, SNGPL, ENI/OMV, OGDCL& PPL.
· Preparation of BOQ.
· MR and POs Preparation and Coordination with Vendors.
Duties & Responsibilities in Projects:
· Submitting daily Progress Report & Strength Report of all Disciplines to Client.
· Attending Client & Internal meetings
· Updating Daily Progress Monitoring Sheet.
· Submitting Weekly Over head Schedule to Clients.
· Prepared weekly & Monthly Progress Reports & Over heads For Next Month
· Up Loading all Activities Status on Primavera P6.
· Update S-Curve Using Earned Value b/w Planned Vs Actual Progress % of Estimated Wts.
· Prepared Progress Graphs of Duration & Cost Vs Actual & Planned % Progress.
· Prepared Activities Progress bar chart.
CURRENT PROJECT
· Installation / Supply of Flow lines approx. 170 KM, 30 Wellheads & Gas Gathering facilities etc at KPD. (PC-1) for OGDCL/ZEL.
2. From April 2013 to November 2014 in BST Servicesas aProject Engineer:
JOB RESPONSIBILITIES |
o HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman & developed HAZOP detailed Report
o Project Scheduling in Primavera P6 & MS Project 2010
o Controlling & Monitoring Project Schedule and Resource Loading & S-Curves
o Tender’s Evaluation & Develop required technical Documents at the initial stage
o Established Procedures of Dismantling, Installation, Pre-Commissioning, Commissioning, Transportation, Rigging etc.
o Equipment Technical Evaluation & P&IDs, PFDs Evaluation
o New Equipment PO preparation e.g. HCDP unit, Condensate Stabilization unit etc.
o Prepared Pre-qualification Documents for OMV
PROJECTS CONTRIBUTED
· Dismantling, Relocation & Installation of Chachar Plant to Shahdad Wellsite, Supply and Installation of additional process & Utility Equipment and Allied Services for Setting up Shahdad Gas Processing Facility of PPL.
· Construction/Welding and installation of “8 inch dia buried and aboveground pipeline” from Kinza Well X-1 to Sharaf Plant.- Pakistan Petroleum Limited
· Construction/Welding and installation of “16 inch dia buried and aboveground Sales Gas pipeline” from Sharaf Plant to SSGCL S3- Pakistan Petroleum Limited
· Maintenance of “Cathodic Protection” system at Kandhkot Gas field-Pakistan Petroleum Limited
· Construction/Welding and installation of 4inchdia buried and aboveground pipeline. Flow line from Chachar gas field to Kandhkot field - Pakistan Petroleum Limited.
· Replacement of bottom plates of Condensate storage tanks at Adhi Gas Field-Pakistan Petroleum Limited.
· Drilling Site preparationand executed Conductor Casing run to 41 m depth using drilling machine at Falah X-1 Shahdad-pur Gambat block.
INTERNSHIP
One month internship in Weatherford Oil Tool Service Company at Karachi Base, learnt about the drilling Equipment and operations of different departments including:
§ TRS (tubular running system), Jars, Stabilizer grinding and welding, Rental Tools, Machine Shop, JAM, Liner Hanger.
SKILLS & TRAININGS
· SCABA & Firefighting Training at Adhi Field of PPL
· Good Communication Skills
· Project Management & Project Handling skills
SOFTWARE SKILLS
· Primavera P6, MS Project 2010, PHA Pro 6 (HAZOP Software)
· MS Excel (any version), MS Word (any version), Power Point
OTHER ACTIVITIES
· Teaching to class XI, XII (Pre-Engg), O/A Level; Engg. Mechanics to NED Students.
· Affiliated with HAZTEK international for HAZOP Scriber in Asia Region.
· Doing my own Urdu Poetry & Pencil Sketches in leisure hours.
SCHOLARSHIPS & ACHIEVEMENTS
· Secure 24th position in Intermediate Karachi board and topped in the Dehli College in year 2008.
· Scholarships awarded by Bihar Foundation after admission of University.
· Per year scholarships in NED University by Mian Muhammad Yusuf Scholarship program.
· Scholarships awarded by Siemens each semester.
· Last 02 years in NED got Scholarship from UKAA from Karachi University.
PROFESSIONAL MEMBERSHIP
· Member of SPE (Society of Petroleum Engineers).
· Pakistan Engineering Council (PETGAS / 1594)
- Industry:
- Region: