zafar khan
Zafar Khan
Project Management Professional
Mobile: +966-551435517
Email id: zafar_khan956@yahoo.com
Professional Summary
Ø A Competent Project Management Professional with over 11 years of experience.
Ø Extensive experience in Project Planning, Execution, Billing Scheduling and Material Planning, Quality Control and Quantity Survey.
IT Skills
ØPrimavera-3, 6
ØAutoCAD
ØAuto Plotter – Road Estimator Software
ØMS Project
ØExhaustive experience of all tools of Ms Office.
Professional Experience
Beijing Construction Engineering Group Co. Ltd. Al- Jubail KSA
Project Control Manager
From Oct. 2012 to Continue now
Reporting to: Project Manager
Project : - SABIC MEGA HOUSING PROJECTS – PHASE III HAII JALMUDAH PACKAGE No. 2, 3 & 4
Client : - SABIC
Key Responsibility Areas:
ü Establishing Project Execution strategy
ü Establishing a subcontracting plan / Strategy
ü Establishing Work Breakdown Structure (WBS) & Cost Breakdown Structure (CBS)
ü Issuing and maintaining schedule control procedures
ü Identifying project activities and integrating engineering, procurement and construction activities into one comprehensive project execution plan.
ü Developing and issuing various types / levels of project schedules
ü Identifying / Monitoring the critical paths
ü Resource Planning and optimal resource mobilization
ü Issuing Progress Measurement Method
ü Analyzing schedule trends
ü Planning and initiating corrective actions for delays
ü Updating and monitoring the schedules, incorporating any changes occurring during project execution
ü Preparing and issuing progress schedule and progress reports
ü Hold a progress meeting
Key Projects Handled:
ü SABIC Mega Housing Project Phase III- Haii Jalmudah – Package 2, 3 & 4. The Project is Construction of 1280 Villas Construction with Secondary Infra structure Facilities where 878 Nos. Precast Villa and 402 Nos. Conventional Villa worth 1278 Million SAR.
Manarah Al- Jubail Construction Company Limited, Al-Jubail (KSA)
Construction Manager
From June 2010 to June 2012
Reporting to: Project Manager/ General Manager
Project : - Jubail Export Refinery Project (Package # 6 Construction Work of North Tank Farm)
EPC CONTRACTOR; - PETROL STEEL COMPANY LIMITED , JUBAIL- KSA
Client : - Saudi Aramco Total Oil Refinery Project (SATORP)
Key Responsibility Areas:
ü Day to Day Planning for Deployment of Resources with Construction Team.
ü Co-ordinate with the Team of Planning & Execution for assuring the work progress should be as per Schedule.
ü Monitoring & Control of resources to get the maximum output and to optimize the resources.
ü Co- ordinate with the Client is regarding drawing issues and clarifying the discrepancies with written or verbal discussion.
ü Raising the Technical queries for the drawing & technical Clarifications.
ü Co-ordinate with construction personnel’s for the execution it should be as per approved drawings as per Architectural & Structural Drawing.
ü Co – ordinate with QA/QC personnel’s & Client for the RFI Submission & Approval.
ü Identify the problems, risk & bottlenecks at site, purpose & solutions.
ü Identify the claims & report with reasoning to PM.
ü Project Planning, scheduling & evaluation of Subcontractors with safety & Quality in the project.
ü Checking of Submitted bills as per physical verification & measurement raised by Planning.
ü Complying with the Project Quality & site safety Plan and all local regulation.
ü Monitoring Performance, identify deficiencies and initiate both trainings on and off site for the deployment of junior staff.
ü Ensuring close liaison with the client as per rules & regulations.
ü Doing crises analysis and participating in remedial solutions.
ü Responsible for procurement of materials, site documentation, safety and quality records.
ü Complying with the Saudi Aramco & ISO Procedure of the project as per Saudi Aramco standards.
ü Complying with permit requirements, safety & quality procedure of the project.
Key Achievements:
ü Two year contract agreement we poured 34000cum. Concrete i.e. 83% of the total structural concrete of the project.
ü Our original work scope initially was 105 million Saudi Arabian Riyals., Due to our performance it was increased and reached up to 205 Millions SAR.
ü Our Peak Manpower strength was 1800 Men.
ü We achieved at the end of June 2012- 6.3 millions Man-hour.
ü I attended & conducted HSE & Project Progress Meeting, my personnel man-hour reach 500 hrs in two years.
ü We were executed 34 Nos. Tanks Ring Wall Structures.
ü I executed 24km underground line work i.e. OSW/WSW line, Fire waterline, utility line.
ü We were executing 6nos. Pump stations.
ü 7.2 Km Bund Wall with Structural fill Material & 90% concrete done for slope pavement.
ü 325 Nos. Manhole we constructed & installed.
ü We had used 120 Nos. Heavy Equipments at site.
ü We did 227 Duct Banks Precast & Cast in situ.
ü We did 5km Telecom Trench Work.
ü We were 2500 pipe sleepers / Pipe Supports cast & installed on site.
Key Projects Handled:
ü Construction of NORTH TANK FARM AT PLOTS 9 JERP PACKAGES -6. The project cost is 200Million Saudi Arabian Riyals.
ü 34 Nos. Tank Farm Ring Wall Structures, around 4500 Nos. Pipe Sleeper, 8000M Bund Wall, 6000m RC DIKE WALL, 12000M RC DITCH , Oily Sewer Water Line-9km- RTR Line – Max.600Dia, RC Line -2000m Max. 1.3m DIA., 6000m Fire Water Line, 325 Nos. MH/CB/VP, Road Asphalting 10000m. 6Nos. Pump Stations, 200Nos. Duct Banks, Telecom & Electrical Cable Trenches- around 10000m.
ü The Above Mentioned job cost wise is 200Million- Saudi Arabian Riyals.
Advantage Equifund Pvt. Ltd, Sendhwa
Construction Manager
From November 2008 to May 2010
Reporting to: Project Manager / General Manager
The company is involved in construction of residential projects and road projects.
Key Responsibility Areas:
ü Project planning, estimation, execution, scheduling, evaluation and subcontracting, resource deployment and utilization, control and monitoring.
ü Coordinating with the team for planning and execution of projects.
ü Responsible for executing the work as per Architectural and Structural Drawing.
ü Responsible for procurement of materials, plant control, site documentation, safety and quality records.
ü Anticipate and identify problems, risks and bottlenecks at the site, propose solutions, identify claims and report with reasoning to PM.
ü Preparing the bills of executing works, estimating the costs of various projects / works, and scrutinizing bills of various subcontractors.
ü Site safety and compliance with Project Safety Plan and all local regulations.
ü Monitoring performance, identify deficiencies and initiate both trainings on and off site for the development of junior staff employed in consultation with the Project Manager.
ü Ensuring close liaison with client and consultant as per rules and regulation.
Key Projects Handled:
ü Mass Housing Project - Construction of 234 Nos. Of 3 BHK & 4 BHK Duplex – INR 44 Crore
Galfar Engineering & Contracting SAOG, Muscat (Oman)
Construction Manager
From February to September 2008
Reporting to: Project Manager/ General Manager
Galfar Engineering & Contracting SAOG is one of the largest, multi-disciplined engineering, contracting and construction company in the Sultanate of Oman with a turnover of over US$1 billion. Galfar, has the experience and expertise in project management, engineering, procurement and construction in areas like Oil & Gas, Civil, electromechanical, Roads & Bridges and Environmental projects. (www.galfar.com)
Key Responsibility Areas:
ü Day to Day Planning for Deployment of Resources with Construction Team.
ü Co-ordinate with the Team of Planning & Execution for assuring the work progress should be as per Schedule.
ü Monitoring & Control the resources for optimum use of machinery and manpower the optimum use of resources.
ü Co- ordinate with the consultant & Client is regarding drawing issues and clarifying the discrepancies with written or verbal discussion.
ü Co-ordinate with construction personnel’s for the execution it should be as per approved drawings as per Architectural & Structural Drawing.
ü Co – ordinate with QA/QC personnel’s & consultant for the RFI Submission & Approval.
ü Identify the problems, risk & bottlenecks at site, purpose & solutions.
ü Identify the claims & report with reasoning to PM.
ü Project Planning, scheduling & evaluation of Subcontractors with safety & Quality in the project.
ü Checking of Submitted bills as per physical verification & measurement raised by Subcontractors.
ü Complying with the Project Quality & site safety Plan and all local regulation.
ü Monitoring Performance, identify deficiencies and initiate both trainings on and off site for the deployment of junior staff.
ü Ensuring close liaison with the client & a Consultant as per rules & regulations.
ü Responsible for procurement of materials, site documentation, safety and quality records.
ü Ensuring close liaison with client and consultant as per rules and regulation.
Key Projects Handled:
ü Construction of Toyota Show Room & Service Facilities at Liwa, Sohar (Oman)
Key Achievements:
ü Secured 100% marks in Safety Examination.
B. R. Goel Infrastructure Pvt Ltd, Indore
Project Engineer
From May 2005 to January 2008
Reporting to: Managing Director
The company is involved in highway and road construction and carry out with PWD projects’ also.
Key Responsibility Areas:
ü Responsible for estimation, planning and execution of whole Project including procurement of materials as per the requirement.
ü Planning of the project in Bar Chart.
ü Coordinating with the team for planning and execution of projects.
ü Site Survey, TBM Fixing and Level takes of original Ground, verification of levels & TBM with consultant and submission.
ü Project Documentation and coordinating with design consultants and contractors for clarification of drawing discrepancies.
ü Preparing bills of subcontractors and clients.
ü Handling QA / QC procedure to ensure strict adherence to design specifications, international standards & codes and method statements.
ü Project monitoring and control, compliance, quality and safety System.
ü Conducting weekly progress meetings with contractors and subcontractors.
ü Executing different type of road items – Sand Bitumen, SDBC, BUSG, BC, MSS, WMM, WBM, CRM, PQC, GSB and different grade concrete – M10, M15, M20, M25, M30, M35, M40
ü I have worked with different Departments of India like National Highway, Indore Development Authority, Indore, Municipal Corporation WORKS, Airport Authority of India Limited, & Central Govt. Projects Also.
Marshal Test Labs (I) Pvt Ltd, Indore
Lab In-charge
From July 2003 to April 2005
Reporting to: Technical Director
Marshal Test Labs (I) Pvt. Ltd. is an ISO 9001 : 2000 Certified Laboratory for the Testing of Building and Road Materials, Certified by; standardization Testing & Quality Certification Directorate, Ministry of Communication and Information Technology , Govt. Of India, New Delhi. (www.mtlipl.com)
Key Responsibility Areas:
ü Conducting Laboratory Test of Soil, Concrete & Bitumen and concrete and bitumen mix designs.
ü Handling Non Destructive Analysis on Concrete e.g. Ultra Pulse Velocity Test, Rebound Hammer Test.
ü Responsible for quantity and quality check of work.
ü Handling Mix Designs of Concrete and Bitumen that the trial with admixtures and accelerators for R.M.C. Plant. And I am working with IS- Specification and also have an experience of ISO Audit and Documentations as per ISO Management System and Marshal is Also a ISO-9000, 2000 Certified Firm
ü Dealing with clients and involve in technical discussion.
ü Responsible for tendering, payment follow up, documentation and reporting to the top management.
Professional Training Undertaken
Primavera 3.1 and 6 October 2008
CadCenter Indore (M.P.) India
Auto Plotter, June 2004
Advantage Equifund Pvt Ltd, Sendhwa
Date | Topic/Course Title |
July, 2001- December, 2001 | We have made Minor Project in 3rd Year 5th Semester which was a “Construction of 100 Bedded Hospital Project” . For this Project I was selected as Team Leader where I was leading my team for Preparing & Approvals of the project. We were visited renowned Hospitals in Indore (M.P.) India which was a remark as big Hospital in Asia in Govt. Organization the Name is “Maha Raja Yeswant Rao Holkar Hospital & we were visited many other big Hospitals. In this Project we prepared Planning & Designing & Model for the Project.
|
April, 2002 | I have been Conducted Seminar on Architecture & By Laws for Building. Where we have been discussing about Orientation of Buildings & Sun Diagram’s.
|
November, 2002 | I have conducted the Seminar on Narmada Treatment Plant Project which was Project of Water Treatment Plant at Narmada River at Omkareshwar.
|
January 2003- June 2003 | We have made a Major Project in Final Year which was” Comparative Study of Waste Water Treatment Plant & Sewage Treatment Plant. Where we studied different Methods of treatment of wastewater & SEWAGE WATER”.
|
Feb 10, 2008- | I have attended the safety induction Program in M/s GALFAR ENGINEERING & CONTRACTING S.A.O.G. OMAN. And the company issue HSE Passport for site execution. I have reserved the 100% Marks in safety Examination which was conducted by Galfar Engineer & Contractors S.A.O.G. Oman.
|
April 2008 | I have attended the Project Quality Control Plan orientation which was conducted by QA/QC MANAGER for the Project implementation. |
Education Qualifications
Bachelor of Engineering (Civil), 2003 from an Autonomous Engineering Institute “ Shri Govind Ram Sakseria Institute of Technology & Science, Indore (M.P.) India.
www.sgsits.in
Rajeev Gandhi University, Bhopal
Profile Key Words
Project planning, execution, scheduling, material planning, procurement, quality assurance, quality control, QA / QC, Concrete & bitumen Mix Designs, laboratory testing, Preparation of Bar chart, TBM fixing, highway, road, Mass Housing, Pre Engineering Buildings, Commercial Show Room etc.
Personal Details
Ø Date of Birth : 1st March, 1979
Ø Gender : Male
Ø Marital Status : Married
Ø Nationality : Indian
Ø Passport Details : H 9089336(Valid Till 2nd May 2020)
Ø Address : C/o Nasir Khan
Lohar Mandi,
Behind Urdu Primary School,
Burhanpur, Madhya Pradesh, India
- Industry:
- Region: