KRISHNAN SRIDHARAN
RESUME
1.0 PERSONAL DATA
NAME : Krishnan Sridharan
DATE OF BIRTH : 9th May 1970
PASSPORT NO. : J5819214
Japan Residence Card Holder : Vaild Till Oct 2013
ADDRESS : Sreesukima, 12, Suryanagar
NSN Palayam, Coimbatore-31
Tamilnadu, India.
EMAIL /PH. NO. : sreesukima@yahoo.com
+919843682503
EDUCATIONAL : Bachelor of Civil Engineering
BACKGROUND MaduraiKamaraj University
Tamilnadu, India.
GRADE : I – Class
GRADUATION DATE : April-1991
CERTIFICATION / : Primavera P6v7 (Oracle-Primavera 6)
ON JOB TRAINING (PMDB/MMDB)
AutoCAD, Autolisp-COA Certificate from
CCIT-India (1994)
` Survey GPS at Coimbatore Institute of
Technology, Coimbatore
Diploma in e-commerce CSC Computers-
India(2001)
Program Maintenance (Mainframe)-
Focus InfoTech- Chennai India (1997)
2.0 KNOWLEDGE & CAPABILITIES FOR PLANNING WORKS:
Preparation and updating of the following documents:
Schedules based on critical path method analysis showing man-hour loading for each activity
Target milestone schedules, Equipment and critical item lists. Equipment loading chart (Civil/Steel structure/Building/Mechanical/Piping and E&I)
Planning and Scheduling activities includes:
Preparation of detailed network diagram for projects identifying all the critical and sub-critical activities and milestones using Primavera (P6v7).Preparation of a comprehensive Monthly Progress Report (MPR), which shows the status and actual progress of all aspects of the work. MPR will highlight progress percentage, milestone dates and areas of concern. Development for submission of curves along with progress reports illustrating planned target and actual achievement. Engineering and design, Construction schedule/man-hour schedule, Weekly construction Status Report- reporting on project status, progress and areas of concern. Actual manpower against approved manpower histogram. Actual progress against approved "S" curve. To assess progress and assigned weightings against each activity with respect to the estimated quantity of each element of work to be executed at site and its unit of measurement (UOM).
Project Involved:
GPP-2, 3 & 4 ETHAN EXTRACTION PROJECT, Kerteh. Malaysia.
Period: Sep 2002 Preparation of base schedule, Look Ahead schedule and for all discipline works (Civil, Mechanical/Piping/E&I/Painting and Insulation) following reports are prepared:
Preparation of Progressclaim and invoice register, Productivity/Daily Site report, area work leader/Fire watcher, indirect staff report. Change Enquiry/Order register
Cost Report/Erection _Claim (Valuation Progress Claim report), List of sub-con vendor/supplier - report. Preparation project highlight. Weather/Rainfall record.
Inch mtr. & Spool no. / Piping per system fluid report. Pipe support control / Status of Isometric draw report.
3.0 WORK EXPERIENCE
· Oct 2012 – March 2013
Mitsubishi Heavy Industries Plant Construction Company ltd.,
YokohamaEngineering Center, 3-1 Minatomirai,3-Chome Nishi-Ku,Yokohama,220-8401 JAPAN
Designation: Manager (Project Control/Construction )
Project Involved / Responsibilities of work :
Preparation of Saudi Methonal Company (AR-RAZI PLANT-V Shutdown (Oct - 2013)) work Pre-Shutdown / Shutdown schedule(P6), Progress Analysis and S-Curve(Plan), Weekly / Monthly report format Draft, Inspection and Test plan and Inspection record Draft and Equipment Installation checklist.
.
· May 2005 – July 2012 : Nadia Holdings Ltd.
Coonoor, The Nilgiris, Tamilnadu, India.
Designation: Project / Planning Manager
Project Involved / Responsibilities of work :
Project involved Industrial Buildings, Housing Projects, Bungalow, Electrical Substation, Sewerage Treatment Plant, All External Works and Road Works.
Responsibilities of work includes preparation of schedule using Primavera (Bar chart, S-Curve, Manpower Histogram) by WBS(Work breakdown Structure/Activity code) and Preparation of Progress analysis to monitor the Actual Progress, S-Curve by using MS-Excel, Preparation of weekly Progress Report, Two weeks look ahead schedule, Preparation recovery schedule at Site Office. Also involved in preparation of schedule for tenders at Company Head Quarters in Contract Service Department.
· Oct 2002- Apr2005 : Sumatec Resources Berhad, Malaysia
Designation:Planning Engineer
Project Involved / Responsibilities of work:
Preparation of Base Schedule for Technical Proposal Bid involved in Oil & Gas - Storage Tanks, Power Plants(Bid for Malaka Power Project. Sumatec JV with MHI) and EPCC of all Mechanical and piping works, Chemical Plant Shut down jobs(PTA/TA) works, Petrochemical Projects(Thar Jath Development Project, All Package Accommodation Complex, Central Processing Facilities (CPF), Field Surface Facility(FPF) Export Pipe Line, Central Power Plant, Runkona Bridge for WPNOC ) and GNPOC Petrochemical Projects, Storage Tank for Brunei sheel ,Fertizer Plant, Chemical Plant Shutdown job(Petronas Methanol Plant(Labuan)), Tank Facilities (Client –STP Maldives) preparations at Company Head Quarters in Contract Service Department, Preparation of S-curve using Primavera- 3 and Manpower loading according to the Scope of work( Mechanical works related to equipment list and its classification (Static and Rotary)and long lead item and scope of free issue materials from client. Piping works related to pre-fab. of supports, free issue piping materials fittings and tie-in valves, piping around equipment, Electrical works related to power cables, area lighting and fixtures, electrical equipment and panels / earthing system. Instrumentation works related to instruments, control cables, fire and gas detection system. Painting works related to touch-up/final painting. Insulation works related to piping/equipment and fire proofing on steel structures) in(ITB) Tender Document for Submission of bid and also worked at Sg.Besi Army Camp Housing Project- responsibilities includes Preparation of Progress Analysis, Recovery Schedule, Weekly Progress report, two weeks look ahead schedule and Progress updating. Project involved five 9storey building Blocks and 16 Bungalows. Used Primavera and MSOffice for above works.
· Feb 1997 – Sep 2002: Nadia Holdings Ltd.
Coonoor, The Nilgiris, Tamilnadu, India.
Designation: Sr.Project / Planning Engineer
Project Involved / Responsibilities of work:
Small Scale Industrial Park Building Structures, All
External Works,
Monitoring the progress of work, checking of form
Work, rebar with client side consultant and
Preparation of schedule, S-Curve, Bar chart,
Method Statement for Bid, Monthly progress report.
Conducting “Tool Box Meeting” to explain the safety measure to the Labours periodically.
· Dec 1994 – Dec 1996: Survey Department at Housing and Development
Board, Singapore.
Designation: Technical Officer
Project Involved / Responsibilities of work:
Looking after the activities in Survey Department with Title Engineering. The complete job was under CADD/CAM Micro station (Sun Micro System) by using the CADD System I have prepared the Strata Plan, Strata Lease Plan, Rd and Scaling of Areas for title Engineering Section. The above job was performed with running program to generate the Elevation Sketch. Unit Strata Lot Nos. according the Building layout and Units of Flats.
· May 1991 – Oct 1994 : Coonoor Municipality (Govt. of Tamilnadu) Nilgiris
District, Tamilnadu, India
Designation:Site Engineer
Project Involved / Responsibilities of work:
Looking after the Supervision of Building works, road works, preparation of estimates, building plan and preparation of bills for works to be performed.
- Industry:
- Region: