BRICE ARMEL DAN
Ø Planning Manager Deputy (Primavera P6 ; MS project)
Redevelopment of Anguille’s Fields – COGA Project (Installation of Flexible lines and associated works) - Revamping of ICSS - Electrification
ü Introduction totechnical for installing Flexible and associated work (I-tubes, Flexible Laying, Hot Tap, Riser Protector), Introduction to Precommissioning philosophy; Introduction to commissionning ofa power plant, philosophy of safetyand control systemsforoil fields;
ü Construction &management oflevel 3planning, Construction &management ofplanning offlexible laying activities (Installation of Flow line,Precommissioning, the Topsides),Constructionof schedule3 weeksahead (Level 4), physical progress;
ü Critical path analysisand sub-critical, proposals for remedial action; Analysis of interface with other projects, monthly reporting, forecasting and closing progress, S curves;
ü Analysis of theprogress schedule, Comments of schedule’s documents; Scheduling
ü Organizing and conductingmeetings, writing minutes of meetings; Participation in technical meetings, Participation in planning meetings (weekly and monthly);
ü Analysis and resolution of certain issues of interfaces, Analysis & management of Claims