Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Mohammad Ayaz Khan

First Name: 
Mohammad Ayaz
Last Name: 
Khan

 

WORK EXPERIENCE:

Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).

Jan 2012 till now.

 

·         Projects Undertaken:

·         Working in Isoplus, Kuwait a reputed pre-insulated pipe production company as a QC Inspector (KOC PROJECT) for Polyurethane Thermal Insulation & Moisture Monitoring System. The project is for Installation of LSFO, FG and Gas oil pipelines from MAA to Subiya & Doha Power Stations.

·         Responsibilities as QC Inspector:

·         Control and monitor the condition of Goods/Packing delivered

·         Ensuring the manufacturer instructions for the storage of raw material

·         Verification of batch certificates for polyol, isocyanate, HDPE and copper wires.

·         Performing the lab tests for polyurethane such as cream time, gel time & free rise density for every batch.

·         HDPE melt flow index test as per ISO 1133:2005 for every batch.

·         Dimension check for every batch of copper wires.

·         Visual Inspection of HDPE casing pipe to ensure it is free from grooving and other defects.

·         Dimensional control of HDPE casing pipe every two hours as per ITP.(Inspection and Test Plan) From KOC.

·         HDPE jacket corona treatment every two hours to ensure the surface energy of casing pipes.

·         Perform the HDPE casing offline tests such as density on extruded material, melt flow rate etc.

·         Polypropylene coated pipe visual inspection after washing.

·         Holiday detection of PP pipes to ensure no damage at 25 kV

·         3LPP pipes corona treatment every two hours to ensure the minimum surface energy required.

·         Monitor the ambient temperature at injection area and injection time control to ensure reach of foam properties.

·         Core density tests every shift to ensure the Polyurethane properties.

·         Checking of HDPE jacket pipe final diameter, cutback, marking, leak detection wire continuity, marking and final inspection of all the pipes produced in the shift.

·         Prepare the daily production report and test reports.

Professional Since: 
Mar-2012 (12.8 yrs experience)
Oldest experience: 
Jun 2002 (22.5 yrs experience, WARNING: 9.7 years variance with Professional Since)
Years Experience: 
43

Market Place

No results found... (try selecting a different content filter)