Job Responsibilities:
§ Schedule preparation, monitoring, and recovery plan development activities for projects.
§ Support project organizational and administrative activities.
§ Supervise the development and integration of individual schedules into the total project plan.
§ Establish milestones for the total project and supervises schedule.
§ Support development of scheduling standards and procedures.
§ Participating in project review meetings for tracking project progress, de-bottlenecking by understanding the requirements.
§ Coordination with execution team for progress.
§ Preparation of Method Statement for Various Activities at Site.
§ Preparation of Daily progress Report, Monthly Progress Report.
§ Resources planning as per Site requirement.
Project Description:
§ Construction of Iron Ore Facility for Port of Buchanan, consisting of Industrial facilities.
AFCONS INFRASTRUCTURE LTD.
Sr. Engineer (Planning)
Civil & Structural Steel Works for Polypropylene and Polyethylene (PP & PE) Plant at OPAL, Dahej , Gujarat
February-2012 to July-2012
Client: ONGC Petro addition Ltd.
Consultant:Engineers India Ltd. (EIL)
Total Cost of project: INR 128 Cr
Job Responsibilities:
§ Micro Schedule preparation, monitoring, and recovery plan development activities for projects.
§ Support project organizational and administrative activities.
§ Supervise the development and integration of individual schedules into the total project plan.
§ Establish milestones for the total project and supervises schedule.
§ Support development of scheduling standards and procedures.
§ Participating in project review meetings for tracking project progress, de-bottlenecking by understanding the requirements.
§ Coordination with execution team for progress.
Project Description:
§ Construction of Civil & Structural works for Polypropylene & Polyethelen Plant for OPaL (ONGC Petro Addition Ltd), containing Main substation, Extruder substation, SRR Building, Pipe Racks, Equipment Foundation ,Finishing buildings etc
AFCONS INFRASTRUCTURE LTD.
Sr. Engineer (Planning)
Jordan Phosphate Rock Terminals (EPC Project) Aqaba, Jordan
May’2011- February’2012
Client: : Jordan Phosphate Mines Company LLC (JPMC).
Consultant:Royal Haskoning B.V. (HNBV), Netherland
Total Cost of project: 142.23 Million JD (INR.- 846 Cr)
Job Responsibilities:
§ Schedule development, maintenance, monitoring, and recovery plan development activities for projects.
§ Support project organizational and administrative activities.
§ Supervise the development and integration of individual schedules into the total project plan.
§ Establish milestones for the total project and supervises schedule.
§ Support development of scheduling standards and procedures.
§ Participating in project review meetings for tracking project progress, de-bottlenecking by understanding the requirements.
§ Preparation of Daily progress report.
§ Preparation of Monthly Progress report.
§ Preparation of monthly MIS report.
§ Daily progress Monitoring.
§ Preparation of Micro-schedule.
§ Updating SAP DPR.
Project Description:
§ Construction of Marine Jetty & Mooring Dolphins with steel piles.
§ Construction of Bulk Flat store, Truck unloading station, Substation buildings.
§ Pipe Conveyor structure fabrication & Erection.
§ Silo Erection & Fabrication
§ Electromechanical Installation.
§ Ship loader Fabrication & Erection.
I.T.D. CEMENTATION INDIA LTD (SKANSKA)
Sr.Engineer (Planning and Commercial)
Mazdock Modernization Project- Construction of New Wet Basin (MARINE PROJECT), Mumbai,
September 2008 - April 2011
Client: Mazagaon Dock Limited (MDL) Mumbai
Consultant:Royal Haskoning B.V. (HNBV), Netherland
Total Cost of project: INR- 242 Cr.
Job Responsibilities:
§ Preparing Monthly RA Bills and get it certified.
§ Checking and Certification of Monthly Subcontractor Bill.
§ Preparing and issuing PO’s to Subcontractors.
§ Rate Analysis for Subcontract Activities.
§ Preparing Daily, Weekly and Monthly progress report as per Actual Work done on Site,
§ Updating Progress on Daily Weekly and Monthly basis.
§ Preparing Approval letters.
Project Description:
§ Construction of 225 mtr long Wet basin in marine environment. This includes strip dredging of soil deposit & underlying rock up to founding level (varying from (-)6.00 to (-)10.00 M
§ , and Underwater Rock Blasting to achieve desired depth inside basin, casting of underwater mass concrete wall above high water level (up to (+)5.5/(+)6.00 M), top capping concrete in dry condition, dewatering, construction of ancillary structures and piers.
§ Drilling and Grouting Shear Dowel with 100 mm dia drill in Mass Concrete upto (-) 6.00, (-) 8.00,(-) 10.00 CD. To anchor Mass concrete panel with existing rock to absorb shock by any Ships or Marine Vessels by 70 mm shear dowel bar.
I.T.D. CEMENTATION INDIA LTD (SKANSKA)
Construction of Coal Berth and Approach at Ennore Port (MARINE PROJECT), Chennai,
May 2008 - September 2008
Engineer (Execution)
Client: Chettinad International Pvt. Ltd.
Total Cost of project: - INR - 273 Cr.
Job Responsibilities:
- BBS Preparation for Cast In-situ Beam, Pile Muff, Deck Slab of Jetty.
- In-charge of RCC Insitu Work for Approach Jetty.
Job Description
- Construction of Coal Berth and Approach jetty.
HINDUSTAN CONSTRUCTION COMPANY (HCC) LTD.
Engineer (Safety)
February 2007 - April 2008
Bandra Worli Sea Link Project, Mumbai (MARINE PROJECT),
Client: MSRDC (Maharashtra State Road Development Corporation)
Consultant : DAR Engineering.
Total Cost of Project: INR -1600 Cr
Job Description:
· Construction of Marine Bridge connecting Bandra to Worli, length 5.5 Km.