Suramontri Rottong
CURRICULUM VITAE
Mr.SURAMONTRI ROTTONG
Address:
770 Soi.Sukchan, Makekong
Muang, Samutsongkram 75000
Mobile Phone +66 86 897 2258
Home Phone +66 34 713 129
E-mail : Suramontri@yahoo.com.sg, Suramontri@gmail.com
Position to apply for Planning Engineer
EDUCATION BACKGROUND
SCHOOL / UNIVERSITY
1) Samutsongkram Technical College Secondary (Technical Course) 1985 – 1987
2) Rajamangla Institute of Technology
North Bangkok Campus Machinist (Diploma) 1987 – 1989
3) Rajapark College Industrial Engineer 2004 - 2006
TRAINING / SEMINAR
1. LAN / NETWARE 4.10 FOR (Administration)
2. LAN / NETWARE 3.12 AND INSTALL SERVER
3. LINE NETWORK
4. Microsoft Access
5. Foxpro
6. Visual Basic
7. Microsoft Offices
8. MS Project
9. Primavera P3 and P6
10. AutoCaD
____________________________________________________________________________________________
Company / Address Position Date
Alstom Transport (Thailand) Co., Ltd. Planning Eng. (Nov, 16 – May,17 )
PROJECT: MRT BLUE LINE EXTENSION PROJECT AND MRT GREEN LINE EXTENSION PROJECT
JOB DESCRIPTION
ü Update project schedule for Trackworks and Third rail , Contract 1 Tunnel 2.4 Km, Contract 2 Tunnel 2.4 Km, Contract 3 Viaduct 13.1 Km, Contract 4 Viaduct and Deport 8.9 Km.
ü Update SCHEMATIC PROGRESS and 4 weeks rolling programmed.
ü Weekly / Monthly progress report, Project S-Curve.
ü Monitoring Critical path, Manpower and Non-Manpower.
Company / Address Position Date
AMEC – FOSTER WHEELER Planning Eng. (Oct, 14 – Nov, 16 )
(Singapore DSME Yard)
ZADCO UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2
ü Monitors Module Fabrication Yards.
ü China BOMESC Fabrication 5 Modules for Power Substation
ü Indonesia SIEMENS Fabrication 12 Modules for MTR (Module Technical Room) 1,200 Tons.
ü Singapore DYNA-MAC Fabrication 14 Modules for PAU (Pre-Assembly Unit) 10,000 Tons.
- Prepare KPI and weekly progress report
- Steelwork status
- Fabrication status
- Steelwork erection
- Pipework erection
- Overview of module progress and pictorial view
- Liaise between Contractor planning team regarding claimed progress and slippage.
- Analysis of shop fabrication data, both piping and structural. Providing Project Manager reports per shipment and module.
Company / Address Position Date
Kellogg Brown & Root (KBR) Planning Eng. (Feb, 11 – Jul, 14)
(Korea HHI Yard Ulsan)
Gorgon LNG Downstream Project
The Greater Gorgon Area is located 200km offshore of the northwest coast of Western Australia and contains in excess of 40 trillion cubic feet of recoverable natural gas.
- 16.5m Manhours (EPC)
- 200K Tonnes overall
- 97K Tonnes of structure steel
- 97,000 Pipe Spools
- 1.5m meters cable
- 51 Module
JOB DESCRIPTION
ü Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.
ü Liaise between Sub-Contract planning team regarding claimed progress and slippage.
ü Analysis of shop fabrication data, both piping and structural. Providing superintendents reports per shipment and module.
ü Yard progress verification: analysis of Sub-Contract claimed progress against company verified progress.
ü Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.
ü Summary 8 week look-ahead report communicated to senior management.
ü Attend Primary Yard progress meetings and communicate planning progress and issues.
ü Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.
ü Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements
ü Prepare weekly progress report
- Steelwork status
- Fabrication status
- Steelwork erection
- Pipework erection
- Overview of module progress and pictorial view
____________________________________________________________________________________________
Company / Address Position Date
Bechtel International, Inc., Planning Eng. (Sep, 11 – Feb, 12)
(Thailand)
Project QCLNG Project
ü QC LNG is a multibillion-dollar EPC contact won by OG&C on Feb 5, 2010 - possibly the largest Lump Sum Turn Key LNG job that Bechtel has taken on!
ü Two LNG trains are being developed on Curtis Island, Queensland, AU on a 270-hectare site surrounded by an environmental buffer zone. They are to produce approximately 8.46 MTPA (million metric tons per year) of liquefied natural gas utilising the ConocoPhillips Optimised Cascade Process.
ü First LNG to use Coal Seam Gas from the Surat Basin in eastern Australia. The gas will be delivered through a 380km buried pipeline to Gladstone.
ü Modules Fabrication at Sriracha Job Site Chonburi Thailand Module Type
§ 14 Cryogenic Rack, Propane Chiller
§ 8 Propane Condenser
§ 14 ISBL Piperack
§ 44 OSBL Piperack & Jetty Modules
Total Manhouse 6,500,000 Weight 46,641 Tonnes
JOB DESCRIPTION
ü Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
ü Monitoring actual of progress comparing with BOQ
ü Maintain and update Project schedule
ü Work variation and forecast volume
ü Project S-Curve, Milestone schedule, 3 week look ahead program
ü Critical Shipment follow up and recovery plan preparation
ü Evaluate and produce Weekly progressive report, manning report
ü Monthly progressive / Critical milestone report and update P6
ü Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
SNC Lavalin Thermal Power Planning Eng. (Sep, 10 – Aug,11)
(Jordan)
Project : IraqFast Track Project(4x125 MW) Base on Jordan (Amman)
JOB DESCRIPTION
ü Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
ü Monitoring actual of progress comparing with BOQ
ü Maintain and update Project schedule
ü Work variation and forecast volume
ü Project S-Curve, Milestone schedule, 3 week look ahead program
ü Critical Shipment follow up and recovery plan preparation
ü Evaluate and produce Weekly progressive report, manning report
ü Monthly progressive / Critical milestone report and update P3
ü Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
Foster Wheeler International Corporation Planning Eng. (Nov, 09 – Sep, 10)
ThailandOperations
JOB DESCRIPTION
Project : Thailand Propylene Oxide Project Owner is Dow Chemical Thailand, Ltd.
Total of Man- hours 5,221,876
ü Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified CMS progress.
ü Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
ü Progress, Man-hour & Productivity Report , Progress Evaluation Summary Report.
ü Three Week Look-ahead schedule, Weekly Manpower / Man-hour Report.
ü Analysis of shop fabrication data, both piping and structural. The purpose of the level 4 Category Schedule is to set up an overall monthly project status.
ü Prepare weekly progress report
- Steelwork status
- Fabrication status
- Steelwork erection
- Pipework erection
- Overview of module progress and pictorial view
____________________________________________________________________________________________
Company / Address Position Date
Foster Wheeler International Corporation Planning Eng. (Dec, 07 – Nov, 09)
ThailandOperations
JOB DESCRIPTION
Project : Pluto LNG Project Western Australia Onshore Pre-Assemblies of Module Thailand
Owner is Woodside Burrup Pty Ltd.
261 Preassemblies
Weights ranging from 10 Te to over 1,700 Te.
Combined circa gross weight of 49,000 Te.
138 PAR’s gross weight 26,000 Te
76 PAS’s gross weight 3,000 Te
47 PAU’s gross weight 20,000 Te
Circa weights and Quantities:
30,600 Te Steelwork
670,000 WDI Pipe
7,000 M Hot Insulation
19,000 M Cold Insulation
270,000 M Electrical & Instrument Cable
7,250 No. Instruments
325 No. Equipment
ü Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.
ü Liaise between Sub-Contract planning team regarding claimed progress and slippage.
ü Analysis of shop fabrication data, both piping and structural. Providing FWW superintendents reports per shipment and module.
ü Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified progress.
ü Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.
ü Summary 8 week look-ahead report communicated to FWW senior management.
ü Attend Primary Yard progress meetings and communicate planning progress and issues.
ü Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.
ü Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements
ü Prepare weekly progress report
§ Steelwork status
§ Fabrication status
§ Steelwork erection
§ Pipework erection
§ Overview of module progress and pictorial view
ü Implement P.E superintendent fortnightly lookaheads and analysis on work fronts by priority and review resource levels.
ü Develop Sub-Contract weekly schedule and implement good planning practices.
ü Compile planning procedures when applicable to incorporate into Sub-Contract Project Measurement Procedure i.e GTG’s.
____________________________________________________________________________________________
Company / Address Position Date
IHI (Ishikawajima-Harima Planning Engineer (July,07 – Dec,07)
Heavy Industries Co.,Ltd.)
JOB DESCRIPTION
Project QATAR GAS II (ONSHORE PROJECT LNG STORAGE 5 TANKS)
Owner is Chiyoda Corporation and Technip France Joint Venture (CTJV).
140,000 m³ the tanks have an outer diameter of 78 m and are about 40 m high. The 80 cm thick walls are horizontally post-tensioned using 19x0.62" while12 strand tendons Ø 0.62" were used for the vertical post-tensioning.
- Monitoring actual of progress comparing with BOQ
- Maintain and update Project schedule
- Work variation and forecast volume
- Project S-Curve, Milestone schedule, 3 week look ahead program
- Critical Shipment follow up and recovery plan preparation
- Evaluate and produce Weekly progressive report, manning report
- Monthly progressive / Critical milestone report and update P3
- Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
CUEL Company Ltd, Planning Engineer (Jun,03 – Jun,07)
JOB DESCRIPTION
Platform Phase 25 – Phase 32, Plocc 2
Owner is Chevron
ü Maintain and update Project schedule
ü Work variation and forecast volume
ü Project S-Curve, Milestone schedule, 3 week look ahead program
ü Critical Shipment follow up and recovery plan preparation
ü Evaluate and produce Weekly progressive report, manning report
ü Monthly progressive / Critical milestone report
ü Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
Thai Jurong Engineering Ltd. Project Planning Coordinator (April-2000)-(Jun-2003)
JOB DESCRIPTION
I had worked for TJEL for various projects.
MTC Technical Testing Center.
The New Bangkok International Airport Project for section PLB with ShinMaywa, Japan.
My Job Duties are
§ Coordinates with Project Site
§ Makes Project Schedule by MS-Project and s-curve
§ Cost Control key in all cost report to project manager.
§ Update Progress by Primavera soft ware.
§ Planning manpower, Equipment and cost and make monthly report to ITO
____________________________________________________________________________________________
Company / Address Position Date
HIAP SENG SINGAPORE Planning Eng. (JAN-1999)–(JAN-2000)
SINGAPORE
JOB DESCRIPTION
ü Make planning and schedule to Project Manager.
ü Record Progress. SALAYA Project, SOP Project
____________________________________________________________________________________________
Company / Address Position Date
THAI NEPCO COMPANY LIMITED Planning July, 1998 to 1999
JOB DESCRIPTION
PROJECT
Power Plant Rojana Project (Ayuttaya) 122 MW combined cycle,
SAHA Cogeneration (Chonburi) 122 MW combined cycle
§ Make planning and schedule to Project Manager.
§ Update Progress
____________________________________________________________________________________________
Company / Address Position Date
PRIL Pacific Resources Int. Ltd. Scheduling Sep. 1996 to July 1998
Fomosa, Plastic Group.
Mailiao, Yulin, Taiwan R.O.C.
PROJECT QUANTITY
1. T001 – FBM6TOAO, PVC Silo Tanks, 28 Sets 28,283 TONS
2. T002 – BZUMTO3O, Utility Tank 9 Sets 559 TONS
3. T003 – SM-1, Piping, CSPPOAE & CUCPOAE 134,808 DB
4. T004 – DOZMTOII, DOP, Storage Tank 26 Sets 18,000 TONS
5. T005 – SR11 – Shin – Kang Fabrication Shop 100,877 DB
6. T006 – EH9MT020, Storage Tank 3 sets 161 TONS
7. T007 – V63PZPPOPAE, Utility Pipe Rack 530 Km. 663,203 DB
8. T008 – BQ4MT020, Storage Tank 18 Sets 1,473 TONS
JOB DESCRIPTION
ü Update Progress and schedule, monthly report
____________________________________________________________________________________________
Company / Address Position Date
PAE(Thailand) Public Company Limited MMS Jan 1993 to Sep. 1996
JOB DESCRIPTION
ü Update Progress and schedule
ü Material control
____________________________________________________________________________________________
Company / Address Position Date
Bechtel International, Inc. (Kuwait) Operator Sep. 1991 to Dec. 1992
A – PROJECT
1. Project (AL – AWADA) To put our a fire in the oil well, Firefighter, (after gulf war)
2. Project (AL – TAMEER) Maintain refinery, oil well (after gulf war)
3. Flow line Project, Pipeline
JOB DESCRIPTION
ü Duties and Responsibilities.
ü Input material data, Control
ü Input schedule record
- Industry:
- Region: