CURRICULUM VITAE

 

Mr.SURAMONTRI ROTTONG

 

Address:

770 Soi.Sukchan, Makekong

Muang, Samutsongkram 75000

 

Mobile Phone  +66 86 897 2258

Home Phone   +66 34 713 129

E-mail : Suramontri@yahoo.com.sg, Suramontri@gmail.com

 

Position to apply for Planning Engineer

 

EDUCATION BACKGROUND

 

SCHOOL / UNIVERSITY

1) Samutsongkram Technical College                            Secondary (Technical Course)                          1985 – 1987

2) Rajamangla Institute of Technology

    North Bangkok Campus                                                                Machinist (Diploma)                                           1987 – 1989

3) Rajapark College                                                            Industrial Engineer                                              2004 - 2006

 TRAINING / SEMINAR

 

1.       LAN / NETWARE 4.10 FOR (Administration)

2.       LAN / NETWARE 3.12 AND INSTALL SERVER

3.       LINE NETWORK

4.       Microsoft Access

5.       Foxpro

6.       Visual Basic

7.       Microsoft Offices

8.       MS Project

9.       Primavera P3 and P6

10.    AutoCaD

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

Alstom Transport (Thailand) Co., Ltd.                        Planning Eng.                                     (Nov, 16 – May,17 )

                                                                                               

PROJECT: MRT BLUE LINE EXTENSION PROJECT AND MRT GREEN LINE EXTENSION PROJECT

 
JOB DESCRIPTION

ü  Update project schedule for Trackworks and Third rail , Contract 1 Tunnel 2.4 Km, Contract 2 Tunnel 2.4 Km, Contract 3 Viaduct 13.1 Km, Contract 4 Viaduct and Deport 8.9 Km.

ü  Update SCHEMATIC PROGRESS and 4 weeks rolling programmed.

ü  Weekly / Monthly progress report, Project S-Curve.

ü  Monitoring Critical path, Manpower and Non-Manpower.

 

 

Company / Address                                                          Position                                                 Date

AMEC – FOSTER WHEELER                                      Planning Eng.                                     (Oct, 14 – Nov, 16 )

                                                                                                (Singapore DSME Yard) 

 

ZADCO UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2

ü  Monitors Module Fabrication Yards.

ü  China BOMESC Fabrication 5 Modules for Power Substation

ü  Indonesia SIEMENS Fabrication 12 Modules for MTR (Module Technical Room) 1,200 Tons.

ü  Singapore DYNA-MAC Fabrication 14 Modules for PAU (Pre-Assembly Unit) 10,000 Tons.

-          Prepare KPI and weekly progress report

  • Steelwork status
  • Fabrication status
  • Steelwork erection
  • Pipework erection
  • Overview of module progress and pictorial view

-          Liaise between Contractor planning team regarding claimed progress and slippage.

-          Analysis of shop fabrication data, both piping and structural. Providing  Project Manager  reports per shipment and module.

 

 

 

 

 

Company / Address                                                          Position                                                 Date

Kellogg Brown & Root  (KBR)                                       Planning Eng.                                     (Feb, 11 – Jul, 14)

                                                                                                (Korea HHI Yard Ulsan)

 

Gorgon LNG Downstream Project

The Greater Gorgon Area is located 200km offshore of the northwest coast of Western Australia and contains in excess of 40 trillion cubic feet of recoverable natural gas.

-          16.5m Manhours (EPC)

-          200K Tonnes overall

-          97K Tonnes of structure steel

-          97,000 Pipe Spools

-          1.5m meters cable

-          51 Module

 
JOB DESCRIPTION

ü  Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.

ü  Liaise between Sub-Contract planning team regarding claimed progress and slippage.

ü  Analysis of shop fabrication data, both piping and structural. Providing  superintendents reports per shipment and module.

ü  Yard progress verification: analysis of Sub-Contract claimed progress against company verified progress.

ü  Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.

ü  Summary 8 week look-ahead report communicated to senior management.

ü  Attend Primary Yard progress meetings and communicate planning progress and issues.

ü  Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.

ü  Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements

ü  Prepare weekly progress report

  • Steelwork status
  • Fabrication status
  • Steelwork erection
  • Pipework erection
  • Overview of module progress and pictorial view

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

Bechtel International, Inc.,                                              Planning Eng.                                     (Sep, 11 – Feb, 12)

                                                                                                (Thailand)

Project QCLNG Project

ü  QC LNG is a multibillion-dollar EPC contact won by OG&C on Feb 5, 2010 - possibly the largest Lump Sum Turn Key LNG job that Bechtel has taken on!

ü  Two LNG trains are being developed on Curtis Island, Queensland, AU on a 270-hectare site surrounded by an environmental buffer zone. They are to produce approximately 8.46 MTPA (million metric tons per year) of liquefied natural gas utilising the ConocoPhillips Optimised Cascade Process.

ü  First LNG to use Coal Seam Gas from the Surat Basin in eastern Australia. The gas will be delivered through a 380km buried pipeline to Gladstone.

ü  Modules Fabrication at Sriracha Job Site Chonburi Thailand Module Type

§  14 Cryogenic Rack, Propane Chiller

§    8 Propane Condenser

§  14 ISBL Piperack

§  44 OSBL Piperack & Jetty Modules

                                        Total Manhouse 6,500,000  Weight 46,641 Tonnes

 

 

JOB DESCRIPTION

ü  Programmed of Work , Progress “S” Curve,  Manpower histogram (By trade).

ü   Monitoring actual of progress comparing with BOQ 

ü   Maintain and update Project schedule

ü   Work variation and forecast volume 

ü   Project S-Curve, Milestone schedule, 3 week look ahead program

ü   Critical Shipment follow up and recovery plan preparation

ü   Evaluate and produce Weekly progressive report, manning report

ü   Monthly progressive / Critical milestone report and update P6

ü   Scheduling time period of bid proposal. 

 

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

SNC Lavalin Thermal Power                                         Planning Eng.                                     (Sep, 10 – Aug,11)

                                                                                                (Jordan)

 

Project : IraqFast Track Project(4x125 MW) Base on Jordan (Amman)

 

JOB DESCRIPTION

ü  Programmed of Work , Progress “S” Curve,  Manpower histogram (By trade).

ü  Monitoring actual of progress comparing with BOQ 

ü  Maintain and update Project schedule

ü  Work variation and forecast volume 

ü  Project S-Curve, Milestone schedule, 3 week look ahead program

ü  Critical Shipment follow up and recovery plan preparation

ü  Evaluate and produce Weekly progressive report, manning report

ü  Monthly progressive / Critical milestone report and update P3

ü  Scheduling time period of bid proposal. 

 

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

Foster Wheeler International Corporation                Planning Eng.                                     (Nov, 09 – Sep, 10)

ThailandOperations                                                        

 

JOB DESCRIPTION

Project : Thailand Propylene Oxide Project Owner is Dow Chemical Thailand, Ltd.

                Total of Man- hours 5,221,876

ü  Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified CMS progress.

ü  Programmed of Work , Progress “S” Curve,  Manpower histogram (By trade).

ü  Progress, Man-hour & Productivity Report , Progress Evaluation Summary Report.

ü  Three  Week Look-ahead schedule, Weekly Manpower / Man-hour Report.

ü  Analysis of shop fabrication data, both piping and structural. The purpose of the level 4 Category Schedule is to set up an overall monthly project status.

ü  Prepare weekly progress report

  • Steelwork status
  • Fabrication status
  • Steelwork erection
  • Pipework erection
  • Overview of module progress and pictorial view

____________________________________________________________________________________________

 

 

 

Company / Address                                                          Position                                                 Date

Foster Wheeler International Corporation                 Planning Eng.                                   (Dec, 07 – Nov, 09)

ThailandOperations                                                        

 

JOB DESCRIPTION

Project : Pluto LNG Project Western Australia    Onshore Pre-Assemblies of Module Thailand

Owner is Woodside Burrup Pty Ltd.

261 Preassemblies

Weights ranging from 10 Te to over    1,700 Te.

Combined circa gross weight of         49,000 Te.

                        138 PAR’s gross weight                     26,000 Te       

                        76 PAS’s gross weight                          3,000 Te

                        47 PAU’s gross weight                       20,000 Te

Circa weights and Quantities:

                                                30,600             Te        Steelwork

670,000           WDI    Pipe

                                                7,000               M         Hot Insulation

                                                19,000             M         Cold Insulation

270,000           M         Electrical & Instrument Cable

                                                7,250               No.      Instruments

                                                325                  No.      Equipment

ü  Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.

ü  Liaise between Sub-Contract planning team regarding claimed progress and slippage.

ü  Analysis of shop fabrication data, both piping and structural. Providing FWW superintendents reports per shipment and module.

ü  Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified progress.

ü  Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.

ü  Summary 8 week look-ahead report communicated to FWW senior management.

ü  Attend Primary Yard progress meetings and communicate planning progress and issues.

ü  Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.

ü  Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements

ü  Prepare weekly progress report

§  Steelwork status

§  Fabrication status

§  Steelwork erection

§  Pipework erection

§  Overview of module progress and pictorial view

ü  Implement P.E superintendent fortnightly lookaheads and analysis on work fronts by priority and review resource levels.

ü  Develop Sub-Contract weekly schedule and implement good planning practices.

ü  Compile planning procedures when applicable to incorporate into Sub-Contract Project Measurement Procedure i.e GTG’s.

____________________________________________________________________________________________

 

 

 

 

Company / Address                                                          Position                                                 Date

IHI (Ishikawajima-Harima                                             Planning Engineer                             (July,07 – Dec,07)

Heavy Industries Co.,Ltd.)

 
JOB DESCRIPTION

Project QATAR GAS II (ONSHORE PROJECT LNG STORAGE 5 TANKS)

Owner is Chiyoda Corporation and Technip France Joint Venture (CTJV).

140,000 m³ the tanks have an outer diameter of 78 m and are about 40 m high. The 80 cm thick walls are horizontally post-tensioned using 19x0.62" while12 strand tendons Ø 0.62" were used for the vertical post-tensioning.

 

-          Monitoring actual of progress comparing with BOQ 

-          Maintain and update Project schedule

-          Work variation and forecast volume 

-          Project S-Curve, Milestone schedule, 3 week look ahead program

-          Critical Shipment follow up and recovery plan preparation

-          Evaluate and produce Weekly progressive report, manning report

-          Monthly progressive / Critical milestone report and update P3

-          Scheduling time period of bid proposal. 

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

CUEL Company Ltd,                                                        Planning Engineer                             (Jun,03 – Jun,07)

 
JOB DESCRIPTION

Platform Phase 25 – Phase 32, Plocc 2

Owner is Chevron

ü  Maintain and update Project schedule

ü  Work variation and forecast volume 

ü  Project S-Curve, Milestone schedule, 3 week look ahead program

ü  Critical Shipment follow up and recovery plan preparation

ü  Evaluate and produce Weekly progressive report, manning report

ü  Monthly progressive / Critical milestone report

ü  Scheduling time period of bid proposal.  

____________________________________________________________________________________________

 

Company / Address                                                           Position                                                Date

Thai Jurong Engineering Ltd.                      Project Planning Coordinator        (April-2000)-(Jun-2003)

 
JOB DESCRIPTION

 I had worked for TJEL for various projects.

MTC Technical Testing Center. 

The New Bangkok International Airport Project for section PLB with ShinMaywa, Japan.

My Job Duties are

§  Coordinates with Project Site

§  Makes Project Schedule by MS-Project and s-curve

§  Cost Control key in all cost report to project manager.

§  Update Progress by Primavera soft ware.

§  Planning manpower, Equipment  and cost and make monthly report to ITO

____________________________________________________________________________________________

 

 

 

 

 

Company / Address                                                          Position                                                 Date

HIAP  SENG  SINGAPORE                                             Planning Eng.                                    (JAN-1999)–(JAN-2000)

SINGAPORE       

 

JOB DESCRIPTION

ü  Make planning and schedule to Project Manager.

ü  Record Progress. SALAYA Project, SOP Project

 

____________________________________________________________________________________________

 

Company / Address                                                          Position                                                 Date

THAI NEPCO COMPANY LIMITED                          Planning                                               July, 1998 to 1999

 

JOB DESCRIPTION

PROJECT                           

Power Plant Rojana Project (Ayuttaya)  122 MW combined cycle,

SAHA Cogeneration (Chonburi) 122 MW combined cycle

§  Make planning and schedule to Project Manager.

§  Update Progress

____________________________________________________________________________________________

 

Company / Address                                                           Position                                                 Date

PRIL Pacific Resources Int. Ltd.                                      Scheduling                                            Sep. 1996 to July  1998

Fomosa, Plastic Group.

Mailiao, Yulin, Taiwan R.O.C.

PROJECT                                                                                                                                                                              QUANTITY

1. T001 – FBM6TOAO, PVC Silo Tanks, 28 Sets                                                                                        28,283                    TONS

2. T002 – BZUMTO3O, Utility Tank 9 Sets                                                                                                         559                  TONS

3. T003 – SM-1, Piping, CSPPOAE & CUCPOAE                                                                                     134,808                 DB

4. T004 – DOZMTOII, DOP, Storage Tank 26 Sets                                                                                      18,000                 TONS

5. T005 – SR11 – Shin – Kang Fabrication Shop                                                                                       100,877                 DB

6. T006 – EH9MT020, Storage Tank 3 sets                                                                                                         161                 TONS

7. T007 – V63PZPPOPAE, Utility Pipe Rack 530 Km.                                                                               663,203                DB

8. T008 – BQ4MT020, Storage Tank 18 Sets                                                                                                   1,473                 TONS

 

JOB DESCRIPTION

ü  Update Progress and schedule, monthly report

____________________________________________________________________________________________

 

Company / Address                                                           Position                                 Date

PAE(Thailand) Public Company Limited                   MMS                                      Jan 1993 to Sep. 1996

 

JOB DESCRIPTION

ü       Update Progress and schedule

ü       Material control

____________________________________________________________________________________________

Company / Address                                                           Position                                 Date

Bechtel International, Inc. (Kuwait)                              Operator                             Sep.  1991 to  Dec. 1992

A – PROJECT

1.    Project (AL – AWADA) To put our a fire in the oil well, Firefighter, (after gulf war)

2.    Project (AL – TAMEER)  Maintain refinery, oil well (after gulf war)

3.    Flow line Project, Pipeline

 

JOB DESCRIPTION

ü  Duties and Responsibilities.

ü  Input material data, Control

ü  Input schedule record

Professional Since: 
Jan-2017 (7.8 yrs experience)
Oldest experience: 
Jul 2007 (17.4 yrs experience, WARNING: 9.5 years variance with Professional Since)
Years Experience: 
5

Market Place

No results found... (try selecting a different content filter)