Francis Faustino
FRANCIS FAUSTINO
Brgy San Jose, Quezon City
Philippines 1551
Career Objective: To improve and enhance the skills, knowledge, and attitude in the chosen field.
SKILLS AND QUALIFICATIONS
ü Hard working, fast-learner, and good team player.
ü Can work in any environment and/or multi-cultural setting.
ü Eager to explore and learn new things.
ü With good moral character.
ü Speak English fluently.
ü Computer Literate Microsoft Office (Advance User Of
ü Microsoft Excel), Windows OS, Knowledgeable in Primavera
3.0 , 6.0
JOB EXPERIENCE
Ø BONATTI S.P.A KSA BRANCH
General Contractor Oil / Gas / Petroleum
Position: JUNIOR PLANNING ENGINEER
October 16, 2010- Present
Job Description:
1. Monitor work progress with respect to the approved schedules/milestones.
2. Perform schedule updating & review (PRIMAVERA 3.0 & 6.0). Update S-Curve per area/system/discipline. Run tabular & graphical reports in weekly and monthly basis.
3. Perform monthly progress invoice to proponent/client.
4. Understand all project costs including material, personnel, and equipment cost. Check subcontractor progress & service invoice, evaluates unit rate as per Purchase Order / Contract.
5. Create database as per contract. Maintain, organize and update datasheets of resources use.
6. Participate in department activities for continual improvement in the project control & services.
7. Participate in project review meetings & constant communication with the client (Saudi Aramco).
8. Preparation of reports as required by PMT’s, Project Controls related reports, Saudization, or required by client.
Projects:
1. Upgrade Abu Ali Plant
(Saudi Aramco Project)
Jubail KSA
Project includes the Upgrade of the existing Water Injection Pumping (WIP), of the Saltwater Disposal System (produced water) and of the Distributed Control System (DCS/SCADA), located inside the existing Abu Ali Plant approximately 60 Km north of Jubail.
Ø Upgrade the Water Injection Pumping (WIP) System
Ø Upgrade the Saltwater Disposal System
Ø Upgrade the Distributed Control System (DCS)
2. Upgrade Flare System at Uthmaniyah and Shedgum Gas Plants
(Saudi Aramco Project)
Al Hofuf Ksa
Project includes the development of complete detail engineering, the procurement of all materials, other than FGRS and Nitrogen
Generation Units provided directly by Saudi Aramco, and all required
civil, structural, mechanical, piping electrical, communication
instrumentation and control systems works for the installation of the
FGRS and the Nitrogen Generation Unit
ØInstallation of Flaring Gas Recovery System (FGRS)
ØInstallation of new Nitrogen Generator Unit (NGU)
ØInstallation of new Flare Injection Pilot System
3. Upgrade Firewater Juaymah NGL & Fractionation (JNGLF)
(Saudi Aramco Project)
Ø CARDRIAN BUILDERS INCORPORATION
(INTERIORS & GENERAL CONSTRUCTION)
Cardrian Bldg., B29 L17 Chestnut St.
West Fairview, Quezon City 1118
Position: TIMEKEEPER
November, 2006- January, 2009
Job Description:
1. Compiles employees' time and production records.
2. Reviews timesheets, work chart, and timecards for completeness.
3. Computes total time worked by employees, using calculator or computer, posts time worked to master timesheet, and routes timesheet to payroll department.
4. May pay employees.
5. May calculate time worked and units produced by piecework or bonus work employees, and be designated Time Checker (clerical) or Work Checker (clerical).
6. May locate workers on jobs at various times to verify attendance of workers listed on daily spot sheet and be designated Spotter (any industry).
7. May interview employees to discuss hours worked and pay adjustments to be made and be designated Pay Agent (clerical).
Position: WAREHOUSE MAN
May, 2006- November, 2006
Job Description:
1. Monitors inventory levels of warehouse supplies and assist in keeping an accurate inventory.
2. Assists in the control of, and is responsible for, the construction Materials, the warehouse facilities, and the equipment of the association.
3. Assists the Warehouse Coordinator (Lead Warehouseman) in order to ensure that sufficient material is provided in an efficient manner for all construction, maintenance, and services to be performed.
4. Perform warehouse maintenance and housecleaning.
Ø SQUARE EVOLUTION IN CREATIVITY,
Rm 301 Sri Building 2441, Pasay City
Position: JUNIOR GRAPHIC ARTIST
Duties Include: Designing in an artistic and in a professional way of
making art.
Ø THE LAND TRANSPORTATION OFFICE
Malabon Extension office
Position: DATA ENCODER
Duties Include: organized receipt records/ filling Motor Vehicle
Registration
Encode of Motor Vehicle registration / Drivers License
Ø OFFICE OF THE CONGRESSMAN VINCENT “BINGBONG” P.
CRISOLOGO
Quezon City Hall extension office of the congressman DIST.1
Position: AREA COORDINATOR
Duties Include: Helping Congressman Vincent P. Crisologo in his
Projects such as medical and livelihood mission and coz-oriented
EDUCATIONAL BACKGROUND:
1998 - 2003
| University of the East
| Bachelor of Science in Engineering (Mechanical)
| Samson Road Caloocan City |
1994 - 1998
| Holy Trinity School | Secondary | William Shaw St. Caloocan City
|
1992-1994
| Sacred Heart Academy | Primary | #42 Amoranto St. La loma Quezon City
|
PERSONAL INFORMATIONS
Age : 33 years old
Sex : Male
Status : Married
Religion : Roman Catholic
Citizenship : Filipino
Birth Date : April 21, 1979
Birth Place : Quezon City, Philippines
Height : 170.22 cm
Weight : 81.82 kg
I SOLEMNLY SWEAR that the statement above is true and correct.
______________
John Francis F. Viray
(Applicant)
- Industry:
- Region: