reynaldo parayno
1. Prepare baseline schedule (Work Breakdown Structure, activity durations, activity logic relations, resource loading-manpower, equipment, cost) using Primavera P3 or Primavera P6 v.0).
2. Derive by computing from involved quantity/ties activity durations using company productivity standards(if data is available)
or by using available data posted in Planning Planet, expert or experience-based data.
3. Updating data in Primavera from Excel Spreadsheet uploaded site (physical % - complete/approved) progress %ages.
4. I also do non-planning related works such as Quantity Survey, Structural Design, a little on Survey Layout Works, Supervision/Inspection of various construction activities such as excavation, backfilling & compaction( on sloping as well as flat terrain), massive concreting and related works, formwork installation up to finishing works such as plastering, painting, tiles (floor/wall) installation, marble/granite installation, ceiling installation, etc.
5. In addition I also prepare Bar Cutting List for Infrastrusture ( Dam Repair-Sloping Revetment, Irrigation Structures, Various
Massive Concrete Parts, etc.)
6.I also do Construction Methodology preparation for Consultant Review/Approval and use by Site Supervisor work implementation and used as basis for inspection/approval by same consultant. This include a Steel Sheet Pile Driving Work, other usual construction activities such as polythelene sheet installation, form installation, excavation,concreting, structural steel erection, etc.
7. Costing of different activities/scope(Philippines Bidding) -subject to approval by managing partner.