Najeeb Moithein
|
NAJEEB MOITHEIN
Bachelor of Engineering (Honours), MBA, PM, PLANNING & CONTROL MANAGER+971 50 101 3655
+971 56 608 8724
+914 85 282 3377
Over the past 23 years of working assignment as a project control in various industries alia: Oil &Gas, Industrial sector, Power sector and Gold mine, building project in various locations in the GCC & Asian countries, he played a vital role in the organisation, offering and suggesting dynamic project management technique for implementation.
He holds a Bachelor’s Degree in engineering plus Masters in Business Administrations, he contributed vast experience in the construction industry in an international environment.
OBJECTIVE
To seek position for EPC projects execution for planning/monitoring and control (Oil &Gas, Power sector, Buildings, Roads and Bridges)
ATTRIBUTES
- Honours Degree in MBA and Four years Degree in Civil Engineering.
- Sound planning, organizing and monitoring works by CCS/CPMS & P3/P6.
- Contractual correspondence with client and subcontractor.
- Project control system implementation
- Project progress, extensions of time, claims and delay events analysis
SPECIALISM
- Experience in Impact Vs planned, schedule window analysis, as built Vs planned analysis
- Specialized in project management, Human Resource & Information Technology.
- Experience in Oil & Gas, Gold Mine Project & Power Project & Airport, Buildings.
- Monitoring, recording, reporting and coordinating activities through CPMS CHIYODA).
- Computer literacy in P3, MS project, AutoCAD, Ms Office, 3D studio, CPMS & PIC.
KEY SKILLS
- Analyzing Tender programmes with Design value engineering, Pre-construction Phase including Approvals & Procurement of long lead items and detailed construction Phase of works.
- Planning Presentations demonstrate the Phases with Resources justifications to achieve the completion milestone.
|
Identify unproductive work and changing content in programmed updates including analysing and demonstrating the effect of delays to a project schedule.
RESPONSIBILITIES
- Preparation of Tender /Construction programme.
- Monitoring and reporting progress against the baseline plan at regular intervals as directed by the Project Team.
- Development of projects baseline plans utilizing the internal project planning.
- Monitoring, controlling and reporting of Subcontractors’ progress.
- Responsible for implementation and maintenance of project planning & control procedures
- Part of progress meeting and analysis of delay events.
- Defending and creating claims.
- Progress monitoring, updating and recovery of any program delays.
- Providing analysis of programs and their documents to determine cause and effect of delaying events and entitlement to extensions of time and related costs.
- Preparing Tender documents, method statements, speculation.
CAREER HISTORY
- July’14- till date – eni –Italy-Agipkco,Jv with NCOC
- Dec’12- June14 - Al Habtoor Leighton Group(HLG)-Dubai/Iraq
- May’10- Nov’12 - Emirates National Oil company(ENOC)
- Apr’08 - Mar’10 - Group Five Construction Dubai (UK)
- Mar’07- Feb’08 - Chiyoda Corporation(EPC)-Japan- QCS-Qatar
- Jun’06 - Dec’06 - Douglas OHI(EPC)-Oman
- Apr’99 - Mar’06 - Cemex–India.
- Mar’92 - Dec’98 - Al- Osais- Saudi Arabia
Eni- agip Kco- Kazakstan(NCOC)
Lead Planning Engineer –The Kashagan field is located in the Kazakhstan sector of the Caspian Sea. The project contain the replacement Oil and Gas 28’’ (3mm thick CRA (Corrosion Resistant Alloy Clad steel Carbon steel pipeline from D island To OPF (Onshore + Offshore). Pig trap modification onshore and off shore with above ground installations (AGI) along the onshore section of the pipelines at valve locations TR2, TR3, TR4 TR5 and TR7.The project include
- Removal of old 28’’ Pipeline for Oil Line & Gas
- Preparation of Construction Pad
- Pipe storage Yard Construction
- Temporary road access
- Excavation at Shallow water+ swamp & Onshore area
- Automatic welding& Double joint plant and manual tie in
- Push and Pull, Winter preparation etc
- Excavation, lowering and back filling
- Pig traps dismantling and reinstallation
- Cathodic protection
- TR Valve station- Replacement valves and Instrumentation
- Cleaning & Gauging and pre commissioning
- Start-up activities
Al Habtoor Leighton Group –Dubai
|
PROJECT PLANNING MANAGER –Zubair Early Production Facilities -6x50000 BOPD –OIL /Gas separation Unit. The project comprises of 3 areas, Hammar, Rafidiya, Zubair with total 6 oil trains and associated facilities. A fast track, recently awarded 300,000 BOPD Early Production Facility (Oil/Gas Separation Plant) located near Basra in Southern Iraq. The project scope includes for the development of 3 separate Early Production Facilities (Oil/Gas Separation Plant) which include Oil/Gas/Water Separation, Oil Pumping, De-sanding/Desalting, Utilities and Power Generation, Oil Storage Tanks and Export Pipelines, additionally provision of early works for site access, security perimeters and temporary manpower accommodations camps to cater for the 1,500 project workforce.
Project Development of Level-4 programme and implementation of all planning and monitoring &control tool to effective managing the project. The planning package includes resource, Project Monitoring System
Emirates National Oil Company –Dubai (CYLIN GAS)
- SENIOR PLANNING - Planning, Scheduling, Resource Assigning, Monitoring current Vs Baseline programme and Cost Control by cost coding system. Preparation of monthly reports, updating material submittal status and procurement schedule. Preparation of Financial (Profit & Loss) report has been reported to top management. Preparation of tender programmes, Manpower Histogram & Financial cash flow curve. The project as follows
- Falcon-Bulk Oil storage Terminal
- East WARF Fuel Pipeline work at EIL terminal
- ENOC Fujairah Distribution Trading terminal
- VOPAK-Product tank bottom plate Replacement
- ELOMP-Marine product line pumping station
- EIL-Fire Revamping Project including control monitoring system
GROUP FIVE CONSTRUCTION (UK Branch)-Dubai
- DEPUTY PLANNING MANAGER-Finalizations of Tender technical submission includes Bid Programme, Manpower Histograms, Plant & Equipment list and Method statement and as per Specifications & application. Technical presentation and Negotiating contractual durations with planning life cycle analysis to the client after bid evaluations. And also finalization of CL-14 programmes and Target programme for ongoing projects. Responsibility handled the detail Planning & Control measures and Acceleration Construction schedule / Recovery schedule and Progress Measurement process for project execution. E mal (Emirates Aluminium) – EMAL SMELTER COMPLEX (Biggest in the world) E mal project Anode Baking Furnace (Carbon Package) Electrical Substations - UAE
DOUGLAS OHI -OMAN
Planning Engineer- SOHAR POWER & DESALINATION PROJECT (The largest water & power Plant in the Sultanate of Oman)
The project comprises of, clarification package, Filtration packaged Aeration Package, sludge dewatering package, chemical package, and utility and sweater intake facility.Preparation of target variance reports to analyse progress activity wise.
Monitoring weekly measurements received from site engineers to analyse production on various items of works
|
CHIYODA-TECHNIP JOINT VENTURE-QATAR
- Schedule Engineer(CHIYODA) - Qatar Gas LNG Project: Process Train 6&7CTJV, Japan's Chiyoda and France's Technip Joint Venture, signed the contract for the engineering, procurement and construction of the Ras Gas onshore projects trains 6 and 7. Each train is designed to produce 7.8 million tonnes per year of liquefied natural gas, making them two of the world's largest LNG trains. Responsible for monitoring programs for subcontractor, controlling mile stones, analysis based on updated programme submitted by the subcontractors. Active involvement in the process area .underground piping and equipment erection and dress out scheduling
- CEMEX ENGINEERS -INDIA
- Planning Engineer-./ Project engineer -Villas and commercial building roads and bridges and industrial buildings. Responsible for planning and coordinating. Preparing reports update schedule, organizing the daily activities, implementation of modern construction management practices and maintain good customer relation and finish the project on time.
AL-OSAIS+KILBORN- SAUDI ARABIA
- Site Engineer-Gold mine project; Al-Osais joint venture with Kilborn Inc Canada in Kingdom of Saudi Arabia. The total Cost of the project is 200million Saudi Riyal. Drafting construction Drawing using Auto Cad
ACADEMIA
- Master of Business Administration-MBA from ICFAI university-Hyderabad
- B-Tech in Civil Engineering-from Kerala University-India.
- Diploma in Civil Engineering from Board of Technical Education Kerala.
- International English language Testing-IELTS qualified.
- Software Training in Primavera, MS Project, AutoCAD, 3D studio ,CPMS
PASS PORT DETAILS
PERSONNAL DETAILS
- Najeeb Moithein
- INDIAN
- DOB-10-05-1972
- Family with Children
- UAE VALID DRIVING LISCENCE
- Industry:
- Region: