Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

prakash subramaniam

First Name: 
prakash
Last Name: 
subramaniam

 

Prakash Subramaniam

 

   Contact Details

 

 Address                       : PT297-A,Kampung Baru Sungai Nipah,, Port Dickson,Negeri Sembilan,

                                          Port Dickson, 71960, Negeri Sembilan, Malaysia

 Telephone No.              : +60-066583342

 Mobile No.                   : +60166658342

 Email                          : akash_219@hotmail.com

 

   Personal Particulars

 

 Age                             : 31 years

 Date of Birth                : 1 Feb 1980

 Nationality                   : Malaysia

 Gender                        : Male

 Marital Status               : Married

 IC No.                        : 800201-05-5039

 

   Qualification

 

 Qualification                 : Diploma

 Field of Study              : Engineering (Mechanical)

 Major                          : Mechanical Engineering

 Institute/University       : Polytechnic Ungku Omar,Ipoh, Malaysia

 Graduation Date           : Dec 2001

 

 Certification

 -PMP (PROJECT MANAGEMENT PROFESSIONAL) – Completed PMP preparation course. Expected to sit for exam end of Feb 2012

 -CPE (CERTIFIED PLANNING ENGINEER) (2009)

 -Completed basic course on Primavera P6

 -Introduction course on using SAP (PM).

 -Advance level of Primavera P6 (Aker solutions).

 

   Experience: Total 10 Year(s) of Experience

 

 Employment History

 

Company Name          : AKER SOLUTIONS (M) SDN.BHD

 Position Title                : PROJECT PLANNER

 Specialization               : Engineering – Oil & Gas (Subsea Manufacturing)

 Industry                      : Subsea manufacturing-Xmas Tree and Wellhead Systems

 Duration                      : Oct 2010 – Present

Responsibilities              :- Produce, maintain and update execution activities in Project Master schedule

                                           As well as client’s activity planning .Ensure the project activities are fully

                                           Integrated in the overall plan as per commitment to client.

                                         - Establish Project Baseline and rebaseline if required by client.

- Liase with the various assets planners and attends all planning and

                                            Coordination meetings held by the various functional groups in order to

                                            Coordinate execution of activities as required.

                                         - Advice the project Management team of any deviation to the execution,

                                           Provide support in the identification of area of delays and help at the preparation

                                           Of recovery plan to maintain the plan.

                                         - Update and prepare progress update on execution activities planned

                                            To all parties involved in the projects.

                                         - Update progress weekly/monthly in schedule and S-curve and

                                            Prepare “Critical Path Analysis” from plan which needs to monitor 

                                            and advice project managers accordingly.

                                         - Assist in the interpretation of engineering drawings to assist in the

                                           In the development of project schedule.

                                         - Assist team of planners in preparing tender plan.

                                         - Attend daily production meeting and weekly client meeting.

                                         - Data collection such as Engineering progress, Procurement updates and

                                           construction status to update daily plan.

                                         - Prepare three week look ahead schedule and update every week to make sure

                                           Project executed accordingly.

  

                                                  

POJECTS UNDERTAKEN     : - KANOWIT SUBSEA SYSTEMS- 4 x WELLHEAD’S  

                                           (CLIENT:PETRONAS)

                                         - YC13-4  YA CHENG GAS FIELD DEV –3 x WELLHEAD’S & 3 x XMT’S                                           

                                           (CLIENT: CNOOC).

                                         - OTWAY PHASE 3 DEVELOPMENT PROJECT  - 3 x WELLHEAD’S &  3 x XMT’S

                                           (CLIENT:ORIGIN ENERGY RES)

 

TENDER POJECTS            :  - LIWAN

                                         - RELIANCE KG Extension

 

 

 

 Company Name         : SHIN EVERSENDAI ENGINEERING (M) SDN.BHD

 Position Title                 : PLANNING,SCHEDULING AND TENDER ENGINEER

 Position Level               : Senior Executive

 Specialization                : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : Feb 2009 – Sept 2010

 Work Description          :       - Reporting GM on Project Tendering status and ongoing project status.

                                          - Tender for projects-Overall value more than 50million(Civil and steel Structure

                                            works).

                                          - Attend coordination meeting on Conceptual design & planning with Architect's

                                             and C & S Engineer's.

                                          - Prepare Overall Preliminary Project planning and Scheduling.

                                          - Overall project planning, execution, implementation and Technical Clarification

                                             on design.                                                          

 

 

Company Name           : SHIN EVERSENDAI ENGINEERING (M) SDN.BHD

 Position Title                 : PLANNING & SCHEDULING ENGINEER

 Position Level               : Senior Executive

 Specialization                : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : Sep 2006 - Jan 2009

 Responsibilities                 : - Incharge of preparing schedule and Technical Documentation

                                           - Updating progress and preparing weekly & monthly report.

                                          - Preparing and monitoring manpower loading.

                                          - Monitoring fitup & welding works for Critical activities

                                            (Boiler Pressure Parts and Piping).

                                          - Preparing and Submit Erection Procedures.

                                          - Preparing of Method Statements for all Lifting activities.

                                          - Planning of Manpower and Resources for Project Execution

                                          - Planning and Technical clarification of Heavy lifting.

                                          - Preparing the Project Schedule for Erection of Structures, Pre-assembly &   

                                             Erection of Boiler Pressure Parts and Non Pressure Parts, Main and  

                                             Miscellaneous Piping, Ducting, Coal Bunker, Auxiliary Equipment, Painting &

                                             Insulation works.

 

 PROJECTS UNDERTAKEN:

 SEPTEMBER 2006 TO Jan 2009 : Erection works for 3 units of Boiler.

                                           3 x 700MW COAL FIRED POWER PLANT, TANJUNG BIN,JOHOR.

                                      : Erection works for 2 units of Boiler and ESP & FGD.

                                            2 x 700MW COAL FIRED POWER PLANT, JIMAH , NEGERI SEMBILAN

 

 

 Company Name             : INSOFORCE (M) SDN.BHD

 Position Title                     : SITE ENGINEER

 Position Level                    : Junior Executive

 Specialization                    : Engineering - Civil/Construction/Structural

 Industry                           : Construction / Building / Engineering

 Duration                           : May 2005 - Aug 2006

  Responsibilities                 : -Incharge of company insulation and scaffolding works.

                                          - Site Coordination and attend clarification meeting with clients.

                                          -Prepare schedule for every projects taken by company.

                                          -Estimate material usage and manpower utilization for all the projects.

 

 PROJECTS UNDERTAKEN:        

 MAY 2005                             : Painting & Insulation Works.

                                               YTL POWER PLANT, PASIR GUDANG

 

 JUNE 2005  JULY 2005       : Gas Turbine 12 & Steam Turbine Turn Around             

                                           Insulation works, Panglima Power Plant.                                        

                                           -SIEMENS MALAYSIA SDN BHD

 

 AUG 2005                      : Damper and Frame Refractory Lining works.                                           

                                           -GROUP STEEL CORPORATION SDN BHD, MELAKA.

 

 AUG 2005                        : Piping, Equipment & Air Cond Ducting Insulation works

                                           -HUALON CORPORATION SDN BHD, MELAKA

                                           -YTL POWER PLANT, PASIR GUDANG.

 

 AUG 2005                           :  Air Cond Ducting Fabrication & Insulation works

                                           -KOTRA PHARMA (M) SDN BHD, MELAKA

 

 SEP 2005  OCT 2005             : Gas Turbine 11 & Steam Turbine Turn Around works,

                                            Panglima Power Plant , Melaka.                                       

                                               -SIEMENS MALAYSIA SDN BHD

 

 NOV 2005                              : Dry line ducting erection & Insulation works, SPB Panel

                                                Board, Segamat.

                                                -C.T.ENGINEERING SDN BHD, JOHOR

 

 DEC 2005                             : Equipment Insulation works.

                                              -ORNA STEEL CORPORATION SDN BHD, MELAKA

 

 JAN 2006                               : Insulation Repair works.

                                               -YTL POWER PLANT, PASIR GUDANG           

 

 FEB 2006                               : PWHT Insulation works.

                                              -FOSTER THERMAL ENGINEERING SDN BHD.

 

 MAR 2006 TO APR 2006           : Insulation and Scaffolding.

                                                -GT 12 turnaround works, Panglima power plant,

                                                 -SIEMENS MALAYSIA SDN BHD

 

 MAY 2006 TO AUG 2006        : Turnaround (insulation maintenance works).

                                               - TITAN PETRO CHEM SDN BHD.                                                

 

 Company Name         : INSOFORCE (M) SDN.BHD

 Position Title                 : ASSISTANT CONTRACT ENGINEER.

 Position Level                : Junior Executive

 Specialization                : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : May 2003 - May 2005

 Work Description          :

 

 ROLE                              : ASSISTANT CONTRACTS ENGINEER.

 SCOPE OF WORKS           : -Prepare quotation for insulation and scaffolding works.

                                      -Take off bill of quantities.

                                        - Report directly to Contracts Manager.

                                        - Plan and coordinate with Project Coordinators and Engineers.

                                        - Attend Technical and Financial meetings with clients to finalize the tenders.

 

 PROJECTS UNDERTAKEN:   

                                                            

 MAY 2003  SEP 2003           : -Hot & Cold Piping Insulation works.

 CLIENT                               : SERDANG HOSPITAL, SERDANG

 

 OCT 2003  JAN 2004           : -Hot & Cold Piping Insulation works.

 CLIENT                              : KL SENTRAL HOTEL, KUALA LUMPUR.

 

 FEB 2004  JUNE 2004         :  -Insulation & Scaffolding for shutdown works.

 CLIENT                              : YTL POWER PLANT, PASIR GUDANG.

                                                                                        

 JULY 2004  AUG 2004        : Hot & Cold Insulation and Scaffolding works.

 CLIENT                             : TITAN TPC-2 TURN AROUND.

 

 SEP 2004                          : Piping Insulation and Maintenance Works.

 CLIENT                             : YTL POWER PLANT, PASIR GUDANG.

 

 OCT 2004FEB 2005            : Piping & Equipment Insulation works.

 CLIENT                             :-SNC IND LAMINATES S/B,PASIR GUDANG

                                           -IDEMITSU SM (M) S/B,PASIR GUDANG

                                           -TAKEUCHI MDF SDN BHD, PASIR GUDANG

              

 MAR 2005  APR 2005      : Piping Insulation works.

 CLIENT                              : PSR-2 PROJECT STAGE-1 (LOCAL ENGINEERING SDN BHD, TERENGGANU)          

 

  Company Name         : INSOFORCE (M) SDN.BHD

 Position Title    : SITE SUPERVISOR (Piping erection & Insulation work

 Position Level   : Fresh / Entry Level

 Specialization   : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : Nov 2002 - May 2003

 Work Description          :

 

 CLIENT                                : KAWASAKI HEAVY INDUSTRIES   

 PROJECT                          : CCGP COMBINE CYLCE POWR PLANT, PENANG

 

 NATURE OF DUTIES:         

                                        -Supervise Boiler, HP & LP Steam Piping erection and insulation works.

                                        -Prepare schedules for erection and insulation works.

                                        -Attend clarification meeting with client.

                                        -Coordinate with clients and sub contractors.

                                        -Prepare daily progress reports.                                            

 

 Company Name         : LINSUN (M) SDN.BHD

 Position Title    : SITE SUPERVISOR (Insulation, scaffolding & fabrica

 Position Level   : Fresh / Entry Level

 Specialization   : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : July 2002 – Oct 2002

 Work Description          :

 

 Project : 3 x 700MW Coal Fired Power Plant

 Responsibilities :

                                       -Supervise insulation works for FGD ducting, PC piping and boiler secondary piping.

                                       -Supervise scaffolding erection for insulation works.

                                       -Planning and schedule for insulation and scaffolding works.

                                       -Attend clarification meeting with client.

                                       -Prepare daily reports and final bill of quantities.                                                         

 Company Name         : ESHWARA MMU (M) SDN.BHD

 Position Title    : Supervisor (Insulation,scaffolding & fabrication)

 Position Level   : Fresh / Entry Level

 Specialization   : Engineering - Civil/Construction/Structural

 Industry                      : Construction / Building / Engineering

 Duration                      : Dec 2001 - June 2002

 Work Description          :

 Project                            : 3 x 700MW Coal Fired Power Plant

 Responsibilities                :

                                        -Supervise insulation and scaff works for Steam Turbine Piping and Boiler Piping.

                                        -Prepare daily reports and attend daily & weekly meetings to with clients to review

                                          the progress.

                                        -Prepare schedules for awarded jobs.

                                        -Prepare monthly progress claims.     

 

   Skills

(Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just started using or learning the skill)

 

  Skill                                      Years               Proficiency

 ---------------------------------------------------------------------------------------------------------

  Ms Office                                                    >5                        Advanced

  Ms Project and Primavera                              >5                        Advanced

  Repair Computer and Maintenance                   >5                       Advance

  AutoCad                                                         5                      Intermediate

 

   Languages

(Proficiency: 0=Poor - 10=Excellent)

 

  Language                                 Spoken                    Written

 -------------------------------------------------------------------------------------

  English                                       10                 10

  Bahasa Malaysia                         10                 10

 

   Text Resume / Additional Info

 

Strengths :

 

-  Project Planning and monitor the schedule using CPM scheduling method (Primavera Project

   Planner version 6.0 and MS Project). 

-  Ability to work both as Group Leader and Team Player.

-  Have ability to organize complex projects,defining project priorities, resolving challenging issues

   And delegating tasks.

                       

   Job Preferences

 

 Expected Monthly Salary           : -

 Willing to Travel           : Yes

 Willing to Relocate        : Yes

 Possess Own Transport             : Yes

 

   References

 

 Name              : Mr.Rozianuar bin Daud

Position                        : Project Manager

 Company                    : Aker Solutions (M) Sdn.Bhd

 Telephone                   : 03-31698200

 Email              : rozianuar.daud@akersolutions.com

 

 Name              : Mr.Thong.P.F

 Position                       : General Manager

 Company                    : Shin Eversendai Engineering (M) Sdn.Bhd

 Telephone                   : +6017 2470855

 Email              : p.f.thong@eversendai.com

 

  

Professional Since: 
Sep-2006 (17.9 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.