SATISH YADAVALLI
CURRICULUM VITAE
SATISH YADAVALLI
E-mail:satishyadavalli@yahoo.com
Mobile: +91-9347139568
Permanent Address:
D.No: 30-66-3, Kanithi Colony, Vadlapudi, Visakhapatnam, Andhra Pradesh. Pin - 530046
Personal Details:
Father Name: Y.Somasekharam
Date of Birth:19.06.1984
Nationality: Indian
Language: Telugu, English & Hindi
Passport No: F9976085
Marital Status:UnMarried
Career Objectives:
· To be a part of result oriented professional team that provides a challenging, innovative work environment and opportunities for career and professional development.
· To build my own knowledge base so that I can handle any eventual crisis either single handedly or better if with the co-operation of a supporting group.
· To excel in any field that I need to get into and make turn the venture into a success |
EXPERIENCE : + 05 YEARS(THERMAL POWER PLANT) § 4 years of experience in the field of Project Management - Project Planning, Scheduling, Monitoring and Equipment Tracking using project control software’s viz. Primavera, MS Project and MS Office on all Windows Platform in field of Construction. § 11/2 years of experience in the field of Electrical Operation and Maintenance Process. ACADEMIA § Pursuing MBA from Sikkim Manipal University (Distance Mode) from 2011. § Post Graduation Certificate in Project Management (PGCPM) from IGNOU (New Delhi) with 65% in 2011. § B. Tech (Electrical & Electronics Engineering) from JNTU, First class with distinction 71% in 2006 at Visakhapatnam. § Intermediate with 86% in 2002 at Visakhapatnam. § X Class with 80% in 2000 at Visakhapatnam. KEY SKILLS § Project Planning, Scheduling, Monitoring & Controlling using Project Management Software’s PRIMAVERA (V 6.0) & MS PROJECT (V 2003, 2007 & 2010). § MS Office, Working on All Windows Platforms, Basic Knowledge on HTML. |
EXEPERIENCES: | ||||
Period | Company | Project | ||
From March 2011* | M/S ABHIJEET PROJECTS Ltd part of M/s ABHIJEET GROUP (Nagpur, Maharastra)
| 1. 10MW BIOMASS Power at Durgapur, West Bengal named as “Corporate Ispat Alloy Ltd (CIAL Power)”
2. 300 MW THERMAL Power at Visakhapatnam, Andhra Pradesh named as “Kaizen Power Ltd (KPL)” | ||
Designation: Senior Engineer - CMSC (Corporate Management and Support Cell i.e. Project Management Dept)
Role & Responsibility at 10MW Biomass power at Durgapur: (Under Commissioning): · Project Planning, Scheduling, Monitoring, Updating and Progress reporting using MS Project for Site & Primavera (P 6.0) for Head Office. · Preparation of S-Curve i.e. % Progress achieved Vs Duration for overall project and forecast completion. · Preparation of Agenda for Minutes of Meeting (MOM) & Record Notes, MIS report, Daily progress report, Weekly progress report and Monthly presentations on the status of the project to Head office as well as Site management and highlighting the constraints & criticalities for sorting out the issues. · Coordinating the project with the Site Execution and different Agencies involved in the project and informing to Procurement team to make the equipment available before erection activities commencing and presenting the impact of delay in overall Erection schedule. Role & Responsibility at 300MW Kaizen Power Ltd at Visakhapatnam: (Just Commenced): · Project Planning, Scheduling and Monitoring of commenced civil works using MS Project & MS Office. · Preparation of Baseline schedule (L1, L2 & L3) for entire project. · Preparation of S-Curve i.e. % Progress achieved Vs Duration for civil activities and individual areas and forecast completion. · Preparation of Agenda for Minutes of Meeting (MOM) & Record Notes, MIS report, Daily progress report, Weekly progress report and Monthly presentations on the status of the project to Head office as well as Site management. | ||||
Period | Company | Project | ||
From December 2007 to February 2011
| M/S M.N. Dastur & Co Ltd (Kolkata, West Bengal) A Consulting firm Pioneer in Design, Engineering, Inspection, Project Management and Execution of Steel Plants and Power Plants | 1. 67.5 MW Thermal power plant at Visakhapatnam Steel Plant, (VSP) Visakhapatnam 2. Power Distribution system at Visakhapatnam steel plant | ||
Designation: Engineer - Project Management & Equipment Tracking Dept. residing at Visakhapatnam for 6.3MTPA expansion project of Visakhapatnam steel plant (VSP)
ü 67.5MW Thermal power plant (TPP) VSPis expanding the existing TPP of 247.5 MW to meet power for 6.3MTPA Expansion with 1 No Turbo Generator (namely TG-5 of 67.5MW), 1No Turbo Blower (namely TB-4) and 1No Boiler of 330 Tons/Hr (namely BR-6) along with the associated units like Water Systems, Ash Handling Systems, Utility systems, Power generation & distribution to substation Grid, Illumination system and Fuel Conveyor system.
ü Power Distribution system (PDS) for Steel melt shop, Mills & Raw material Handling plant.
VSPis expanding the Power facilities required for the expanding Zones like Steel melt shop, various mills (WRM, SBM & STM) and Raw Material Handling plant by installing 220 KV Main receiving station (MRS), 220 KV Gas Insulated Switchgear (GIS), 220/33 KV & 220/11 KV Substation buildings with switchyard, 33/11/6.6 KV HT Switchgear, 690/415 V LT Switchgear, LT Power distribution – PCC/MCC/PDB/LDB, Illumination system, Protection systems & Communication systems.
Role & Responsibility · Project Planning, scheduling, Monitoring, Updating and Progress reporting using Primavera (P6) & MS Project for TPP & PDS. · Making Daily, Weekly & Monthly presentations on the status of the project to Clients management and other statutory bodies regarding progress and highlighting the criticalities for sorting out the issues. · Identification, monitoring & streamlining of critical paths running through the Project Master Schedule and individual contracts. · Coordinating the project with the Client & different Agencies involved in the project and making the equipment available before erection activities taking up as per the sequence schedules. · Executive summary for the status of Manufacturing and delivery of Equipment for review to the top Management of the customer and follow-up of critical items. · Fortnightly report submission to Client on the status of manufacturing of equipment and impact of delay on Erection & Commissioning activities. · Screening the location/area of manufacturing of the equipment and scheduling action plan for follow –Up to Dasturco’s inspection branches regarding manufacturing status. · Studying the Electrical drawings like SLD, Equipment layout, Schematic wiring, Cable routing schedule, P & I Diagrams. · Undergone for Inspection of LT equipment like Motor control centre (MCC), Power distribution board (PDB), Lighting distribution board (LDB), Marshalling kiosk for switchyard etc. at Manufacturer premises. · Verification and processing the supply & erection Bills for Agencies for their payments against the equipment supplied to site in the VSP’s on-line Billing Server.
| ||||
Period | Company | Scope of Work | ||
From June 2007 to November 2007
| Synergies Castings Limited (SCL), Aluminum based casting process plant at Visakhapatnam | Worked as a Graduate Engineer Trainee (GET) in Electrical Process & Maintenance Dept.
· Grabbed Knowledge on the process of manufacturing of cast Alloy wheels. · Operation & Control of Switchgear panels, Maintenance of Motors for CNC machines, LPDC machines, Paint line machines etc and Spares maintenance done.
| ||
From August 2006 to May 2007
| Sri Ambica Heavy Electrical Engineering Maintenance works for Visakhapatnam steel plant | Worked as a Site In charge in Electrical Maintenance dept and used to do Maintenance jobs in Visakhapatnam Steel plant. · · Regular check-ups and Maintenance of CNC Machines, Motors at Visakhapatnam steel plant.
| ||
- Industry:
- Region: