Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Manoj Kumar Madaan

First Name: 
Manoj Kumar
Last Name: 
Madaan
  •  

 

  • Analyze and review the scope of work, client requirements, division of responsibility, project objectives and constraints to develop the strategy for effective project delivery.
  • Develop master project EPS structure, project & sub-project structure, activity ID structure, activity codes, WBS, OBS, EWPs & CWPs, define & develop resources dictionaries , cost accounts, allocate resources to activities, assign unit rates and lump-sump costs and determine original budgets.
  • Detailed EPC Level III schedule (~ 5000 activities/project) development/monitoring and Integrating Sub contractors' sub-projects into the master schedule & subsequent schedule analysis during the projects' Implementation phase
  • Interfacing with contractors, major sub-contract equipment/material Vendors and Internal Engineering, Procurement, Construction, Logistics, Finance, Contract Administration departments during implemention of projects
  • Calculating Earned Value(CV,SV,CPI,SPI & CSI) and interpret  schedule results
  • Preparation of Recovery schedule, Tender & Shutdown Schedule & Delay Analysis (As Built Schedule) to claim EOT  as required.
  • Preparation of Asset capitalization, Data Acquisition (CMMS) for SAP, Close out Report, Invoices & Project Dossier.
  • Preparation, Review & Publishing of MIS & Monthly, Weekly, daily reports and Presentations, using bar Charts, S-­Curve and presenting the same to the Project Manager & Client.
  • Coordination & Monitoring of all installation and fabrication works which included material flow Planning, Purchase for long lead delivery items and Coordinate with the Procurement team for timely delivery of materials
  • Maintain & update all Schedules, collecting actual data, evaluating dates to completion and Project delays by effective monitoring of actual progress and productivity compared with the scheduled baselines.
  • Review monthly the forecasts to complete, any deviation from baselines.
  • Prepare two and four Week look-a head’s Plan and Histograms.
  • Preparation of Cost reports, Cost trend/analysis, Cost projections/Cash flow, Cost code of accounts, progress billing, Cost estimation, price & quantity reconciliation with the client prior invoicing and payment.
  • Establishment of work performance measurement tools and techniques for installation sequencing and ensuring & verification of works are being reported.
  • Anchoring on-site Construction Activities to ensure completion of Project within the time & cost parameters and effective Resource utilization to maximize the output.
  • Analyse the labour productivity and Planned for the labour requirement and manpower allocation.
  • Providing and obtaining the feedback from all Key Persons (Project Manager, Construction Manager, Supervisors, and Quantity Surveyors, etc).
  • Guiding draughtsman to complete the layout and related drawings as per the client requirement necessary for execution monitoring of works.
  • Identifying bottlenecks and making recommendation in areas of slippage.
  • Involvement in the preparation of Construction Completion Inspection Test Records, & Pre- commissioning Inspection Test Records.
  • Maintaining the Log of Issues/Constraints and Concerns.
  • Coordination with client and subcontractors to sort out schedule / claim related issues and helping management to solve several relevant problems.
Professional Since: 
Jun-2007 (17.5 yrs experience)
Oldest experience: 
Jun 2007 (17.5 yrs experience)
Years Experience: 
13

Market Place

No results found... (try selecting a different content filter)