sarayut rakhakaew
First Name:
sarayut
Last Name:
rakhakaew Experience Summary
Over five years experience in field of Oil and Gas Industrials
Experiences gained preparing plans, resource plans, schedule and progress monitoring systems for project; including part of engineering, procurement, construction schedule Level 3 including Level 4 for controlling documents registration and Drawing status. Working knowledge of the necessary process to control schedule and progress, the ability to work closely with procurement, engineering and construction staff
Works typical; Construction of well site, piping, electrical, instrument, crude oil pipe lines under ground, structure, pressure vessel, heat exchanger, storage tank and ducts.
Experience with Foster Wheeler
July07 – Present Project Esso Sriracha Umbrella Project (Revamp Project )
Position Planning Engineer
Responsibilities
• Develop Engineering, Procurement and resource loaded Construction baseline schedule, as per defined work scope, Establish required Work Breakdown Structure (WBS) and corresponding weightings for project progressing and progress certification purposes, Develop visual presentations required (Progress S-Curves) as an extract of resource loaded schedule, by manhours. Update master EPC schedule through range coordination with the engineering department, onsite and offsite procurement team and project construction execution team,
• Prepare Two - Weeks Look Ahead schedule, Develop and update Project Critical Item Action List issued every Weekly Internal Meeting,
• Preparation of weekly and monthly report for client review and comment, Attend weekly procurement and construction meeting with the Client. Handle verification and progress certification of work for Engineering, Procurement and Construction, Update construction weekly progress monitoring sheets, required to meet the weekly planned progress, Develop impact evaluation schedule, planning summary report and longest and critical path comparison,
Timely Preparation and issue of :-
• Overall project schedule, Strategic project schedule Level II
Project network Level III
• Preparations Shut Down Schedule
• Develops and assist sub-contractor Planning team in developing level 4 planning for integration to the Master Schedule
• Preparations of the Control Measurement S-Curve Review; analyze the current Pre-TA (Construction Phase) and gives sound advice to the construction manager for Schedule Optimization for Turnaround execution.
Shut Down Experience
Pre-Shutdown Planning – assist in preparation of schedules, Tools & Tackles, materials including spares), blinds, test fittings & gauges, assessment of manpower requirement, scaffolding requirement, provision of identification tags for repair / replacement, etc. and execution of pre-shutdown overhauling of stand-by machineries/equipments.
Shutdown Planning – assist in preparation of daily job list, manpower planning, job’s follow up, preparation of Daily Report, updating the Master Schedule & Schedule Charts, attending shutdown review meetings, preparation of daily report, preparation of Actual Schedule, etc.
Shutdown Activities – assist in the execution of maintenance activities as per schedule and daily job list, fixing up the priorities, continuous follow up of jobs, materials arrangement (spares, tools, etc), coordinating with the other service departments for fabrication, machining, etc.
Post Shutdown Reporting - preparation of shutdown reports, actual schedule charts & master schedule, delay analysis for the delayed activities, review of spares consumed.
Job Experience Of Phase Pre Turn Around
• HVN Cut Improvement Project
• CCR Triconex Upgrading Project
• Electrical Load Shed And Reacceleration System Replacement Project
• Stack Sampling Phase 2 & 3
• APS1 Bottom Stripping Tray Replacement Facilities Project
• Electronic Governor And Overspeed Trip Project
• FCCU Product Yield Improvement
• TARP Tower LHA And Auto Cut Off Project
Other Experience
May 05 - Jun 07 Project PTT Exploration and Production Public Company Limited ( PTTEPS Sirikit Oil Field Oil & Gas production on shore, crude, LPG plant,Lankrabua )by TESCO ENGINEER Co.,Ltd.
Position Planning Engineer
Responsibilities Develop schedule and update works progress. compile all document . Preparation of the progress report to project manager. Perform to take a latest drawing for site/ cross check drawing for construction process.Perform to follow up materials status for shop and field fabrication progress and result.Review 2 weeks look – ahead schedule. Calculate progress by use of CPMS ( Construction Progress Management System) on weekly and Monthly basis.
Co-operate to QA/QC Department to materials receiving, blasting painting, NDT, hydrostatic test progress and result.
Feb 04 - May 05 Project Solution International Consultant Location General Motors ( Thailand ) Limited Manufacturing
Position Planning Engineer
Responsibilities Co – ordinate all aspects of engineering project , budgeting ,develop scheduling and Control schedule for engineer , Procurement and construction package to support new project. Review of project in GMTh with project manager and assist project manager in daily project management activities .Co-ordinate work in fields with attention to technical detail, conflicts , cost and schedule.
Review construction schedule to assist in coordinating upcoming project with insure contractor equipment , QA / QC and project cost are being track during construction. Resolve problem in the project execution phase and require to project team. Look Ahead 3 weeks schedule of the project and daily tracking with sub contractor .Ensure that project safety ,standard and specification comply with specification. Evaluate technical assessment of contractors.
Ensure project close out information , documentation and as-built are complete and turned over to project manager.
Jan 03 – Jan 04 SNC Lavalin International Inc.
Project :The Great Man Made River Project ( Pipe Lines).
Position QA/QC Supervisor and Scheduler
Responsibilities Cooperated site team with engineering/shop drawing team for working at the same way. piping installation, punch list, instruct construction, as built, Create schedule for pipeline , planning and monitoring, Material take off, daily progress report, weekly progress report, coordinate meeting, modify the piping.
Special Qualifications
• Good command of spoken and written English
• Good knowledge of project Controller (Planning & Controlling Schedule)
• Good knowledge of Oil and Gas Engineering
Computer Skills
• Primavera Program P3&P3e, P6, Microsoft Project, Excel, Word, Power Point. Open Plan & Welcome home.
PLANNING EXPERIENCE
• Scheduling maintenance activities for major overhauling work.
Self has good knowledge on Windows based software like Word, Excel, PowerPoint, Outlook Express, MS Projects and has prepared many PowerPoint Presentation Slides Shows.
Email Address :
Sarayut.rakhakaew@gmail.com
Over five years experience in field of Oil and Gas Industrials
Experiences gained preparing plans, resource plans, schedule and progress monitoring systems for project; including part of engineering, procurement, construction schedule Level 3 including Level 4 for controlling documents registration and Drawing status. Working knowledge of the necessary process to control schedule and progress, the ability to work closely with procurement, engineering and construction staff
Works typical; Construction of well site, piping, electrical, instrument, crude oil pipe lines under ground, structure, pressure vessel, heat exchanger, storage tank and ducts.
Experience with Foster Wheeler
July07 – Present Project Esso Sriracha Umbrella Project (Revamp Project )
Position Planning Engineer
Responsibilities
• Develop Engineering, Procurement and resource loaded Construction baseline schedule, as per defined work scope, Establish required Work Breakdown Structure (WBS) and corresponding weightings for project progressing and progress certification purposes, Develop visual presentations required (Progress S-Curves) as an extract of resource loaded schedule, by manhours. Update master EPC schedule through range coordination with the engineering department, onsite and offsite procurement team and project construction execution team,
• Prepare Two - Weeks Look Ahead schedule, Develop and update Project Critical Item Action List issued every Weekly Internal Meeting,
• Preparation of weekly and monthly report for client review and comment, Attend weekly procurement and construction meeting with the Client. Handle verification and progress certification of work for Engineering, Procurement and Construction, Update construction weekly progress monitoring sheets, required to meet the weekly planned progress, Develop impact evaluation schedule, planning summary report and longest and critical path comparison,
Timely Preparation and issue of :-
• Overall project schedule, Strategic project schedule Level II
Project network Level III
• Preparations Shut Down Schedule
• Develops and assist sub-contractor Planning team in developing level 4 planning for integration to the Master Schedule
• Preparations of the Control Measurement S-Curve Review; analyze the current Pre-TA (Construction Phase) and gives sound advice to the construction manager for Schedule Optimization for Turnaround execution.
Shut Down Experience
Pre-Shutdown Planning – assist in preparation of schedules, Tools & Tackles, materials including spares), blinds, test fittings & gauges, assessment of manpower requirement, scaffolding requirement, provision of identification tags for repair / replacement, etc. and execution of pre-shutdown overhauling of stand-by machineries/equipments.
Shutdown Planning – assist in preparation of daily job list, manpower planning, job’s follow up, preparation of Daily Report, updating the Master Schedule & Schedule Charts, attending shutdown review meetings, preparation of daily report, preparation of Actual Schedule, etc.
Shutdown Activities – assist in the execution of maintenance activities as per schedule and daily job list, fixing up the priorities, continuous follow up of jobs, materials arrangement (spares, tools, etc), coordinating with the other service departments for fabrication, machining, etc.
Post Shutdown Reporting - preparation of shutdown reports, actual schedule charts & master schedule, delay analysis for the delayed activities, review of spares consumed.
Job Experience Of Phase Pre Turn Around
• HVN Cut Improvement Project
• CCR Triconex Upgrading Project
• Electrical Load Shed And Reacceleration System Replacement Project
• Stack Sampling Phase 2 & 3
• APS1 Bottom Stripping Tray Replacement Facilities Project
• Electronic Governor And Overspeed Trip Project
• FCCU Product Yield Improvement
• TARP Tower LHA And Auto Cut Off Project
Other Experience
May 05 - Jun 07 Project PTT Exploration and Production Public Company Limited ( PTTEPS Sirikit Oil Field Oil & Gas production on shore, crude, LPG plant,Lankrabua )by TESCO ENGINEER Co.,Ltd.
Position Planning Engineer
Responsibilities Develop schedule and update works progress. compile all document . Preparation of the progress report to project manager. Perform to take a latest drawing for site/ cross check drawing for construction process.Perform to follow up materials status for shop and field fabrication progress and result.Review 2 weeks look – ahead schedule. Calculate progress by use of CPMS ( Construction Progress Management System) on weekly and Monthly basis.
Co-operate to QA/QC Department to materials receiving, blasting painting, NDT, hydrostatic test progress and result.
Feb 04 - May 05 Project Solution International Consultant Location General Motors ( Thailand ) Limited Manufacturing
Position Planning Engineer
Responsibilities Co – ordinate all aspects of engineering project , budgeting ,develop scheduling and Control schedule for engineer , Procurement and construction package to support new project. Review of project in GMTh with project manager and assist project manager in daily project management activities .Co-ordinate work in fields with attention to technical detail, conflicts , cost and schedule.
Review construction schedule to assist in coordinating upcoming project with insure contractor equipment , QA / QC and project cost are being track during construction. Resolve problem in the project execution phase and require to project team. Look Ahead 3 weeks schedule of the project and daily tracking with sub contractor .Ensure that project safety ,standard and specification comply with specification. Evaluate technical assessment of contractors.
Ensure project close out information , documentation and as-built are complete and turned over to project manager.
Jan 03 – Jan 04 SNC Lavalin International Inc.
Project :The Great Man Made River Project ( Pipe Lines).
Position QA/QC Supervisor and Scheduler
Responsibilities Cooperated site team with engineering/shop drawing team for working at the same way. piping installation, punch list, instruct construction, as built, Create schedule for pipeline , planning and monitoring, Material take off, daily progress report, weekly progress report, coordinate meeting, modify the piping.
Special Qualifications
• Good command of spoken and written English
• Good knowledge of project Controller (Planning & Controlling Schedule)
• Good knowledge of Oil and Gas Engineering
Computer Skills
• Primavera Program P3&P3e, P6, Microsoft Project, Excel, Word, Power Point. Open Plan & Welcome home.
PLANNING EXPERIENCE
• Scheduling maintenance activities for major overhauling work.
Self has good knowledge on Windows based software like Word, Excel, PowerPoint, Outlook Express, MS Projects and has prepared many PowerPoint Presentation Slides Shows.
Email Address :
Sarayut.rakhakaew@gmail.com
Professional Since:
Jan-2003 (22.0 yrs experience)