 CAREER SUMMARY
18 years experience in the field of Oil & Gas Industries and Petrochemicals for Project Management, Project engineering, Project Controls (Planning & Scheduling) and Plant operation to coordinate and
•     Develop, Monitor & Update Project Schedule
•     Detailed Planning & Scheduling procedure and implement
•     Assist Contract Administration
•     Develop & implement Progress measurement system and Quantity survey
•     Project Progress Reporting & Performance analysis
•     Contract Variations, Claims & Project Close out reports
•     Co-ordinate multidiscipline engineering activities
•     Manage EPCM activities for projects


DETAILED PROFESSIONAL EXPERIENCE
I)     Aug 09 – Till Date     Manger – Project controls
Petrofac Engineering Services India Limited, Chennai, India
1)     PROJECT     New AGRP/ AGRP Revamp(Proposal Engineering)
SCOPE     Proposal for EPC of New AGRP/AGRP Revamp project
LOCATION     Kuwait
CLIENT      KNPC
POSITION HELD     Planning engineer
DURATION     Ongoing (3 Months)

1) PROJECT     Yanbu Export Refinery Project (Proposal Engineering)
SCOPE     Proposal for EPC of Hydro cracker area of YERP
LOCATION     Saudi Arabia
CLIENT      Saudi Aramco
POSITION HELD     Planning engineer
DURATION     6 Months
II)     Sep 07 – Jul 09          Planning and Scheduling Supervisor
SNC Lavalin Incorporated,
               Edmonton, Canada
1)     PROJECT     Keystone Oil pipeline project
SCOPE     Engineering services for pipeline facilities consisting 47 Pump stations, 4 terminals and trap sites. Total pipeline length 3750 km from Hardisty, Canada to Patoka & Cushing, USA
LOCATION     Edmonton, Canada (Engineering office)
CLIENT      TransCanada Pipeline Limited
POSITION HELD     Lead Planner
DURATION     21 Months
III)     Jun 01 – Sep 07     Senior Planning Engineer
     Petrofac International Limited, Sharjah
1)     PROJECT     Karachaganak 4th train stabisation and sweetening project
SCOPE      Design, Engineering, Procurement, Installation & Commissioning of Oil Treatment plant & Sour Gas Compression
LOCATION     Kazakhstan
CLIENT     AGIP KCO
PROJECT VALUE     US$ 500 Million
POSITION HELD     PROJECT CONTROL MANAGER
PERIOD      Aug 2006 to Sep 2007
2)     PROJECT      Kashagan Field Development Programme).
SCOPE     Design, Engineering and Procurement 2 trains each of Oil Treatment plant (165kopd), Gas treatment plant& Sulphur plant
LOCATION     Kazakhstan
CLIENT     AGIP KCO
PROJECT VALUE     US$ 514 Million
POSITION HELD     PROJECT CONTROL MANAGER
PERIOD      Oct 2004 to Sep 2007
3)     PROJECT      Dorood Project onshore Facilities
SCOPE     Design, Engineering, Procurement, and Installation & Commissioning of Oil treatment, Water injection and Gas injection plants. Scope includes pipeline from wellhead to cluster to field processing facility
LOCATION     Kharg, Iran
CLIENT     Elf Petroleum Iran (Total)
PROJECT VALUE     US$ 250 Million
POSITION HELD     Lead Planner (Home office and site)
PERIOD      Nov 2001 to Oct 2004
4)     PROJECT     EPC of Munga Field production facility
SCOPE     Design, Engineering, Procurement, and Installation & Commissioning of Field Oil treatment facility.
LOCATION     Munga, Sudan
CLIENT     GNPOC
PROJECT VALUE      US $ 25 Million
POSITION HELD     PLANNING ENGINNER (Home Office)
PERIOD     Jun 2001 to Nov 2001     
IV)     Apr 00 – Jun 01     Planning Engineer
     Howard Finley Al Khaleej Limited,
     Abu Dhabi, UAE
1)     PROJECT     ADWEA Cataloguing Project
SCOPE     Preparation of Technical specifications, Inventory data, Spare Part Identification, Conversion of data for CMMMS package for Umm Al Nar Power plant, Abu dhabi.
LOCATION     Abu Dhabi
CLIENT     ADWEA
POSITION HELD     PLANNING ENGINEER
PERIOD     Apr 2000 to Jun 2001
V)     Aug 94 – Mar 00     Manager (Projects and Services)
     DB IDEA Ltd,
     Chennai
1)     PROJECT     C4 Hydrogenation unit
SCOPE     Design, Engineering, Procurement, and Installation & Commissioning Management services for C4 Hydrogenation unit of Haldia Petrochemicals Limited
LOCATION     Haldia, India
CLIENT      Haldia Petrochemicals Limited
PROJECT VALUE     Rs 220 Million
POSITION HELD     Project Engineering Manager
PERIOD     Jun 1998 to Mar 2000
2)     PROJECT     Pyrolysis Gasoline Hydrogenation unit
SCOPE     Detailed Engineering of Pyrolysis Gasoline Hydrogenation unit of Haldia Petrochemicals Limited
LOCATION     Haldia, India
CLIENT      Haldia Petrochemicals Limited
PROJECT VALUE     Rs 320 Million
POSITION HELD     Project Engineering Manager
PERIOD     Apr 1997 to Jun 1998
3)     PROJECT     Fumed Silica project
SCOPE     Design, Engineering, Procurement, and Installation & Commissioning Management services for Fumed Silica project
LOCATION     Mettur, India
CLIENT      Chemplast Sanmar Limited
PROJECT VALUE     Rs 100 Million
POSITION HELD     Project Manager
PERIOD     Feb 1996 to Mar 1997
4)     PROJECT     Butadiene Revamp project
SCOPE     Design, Engineering, Procurement, and Installation & Commissioning Management services for Indian Petrochemicals Corporation Limited
LOCATION     Baroda, India
CLIENT      Indian Petrochemicals Corporation Limited
PROJECT VALUE     Rs 500 Million
POSITION HELD     Project Engineer
PERIOD     Aug 1994 to Feb 1996
VI)     Nov 91 – Jul 94     Senior Executive(shift)
     EID Parry Ltd,
     Chennai,India
1)     PLANT     NPK Fertilisers complex
CAPACITY     350 MT/DAY
DUTY ASSIGNED     Responsible for Operation, Maintenance and Administrative activities of Fertilser complex consisting of Sulphuric acid, Phosphoric acid, Fertilizer and Utilities plants
VII)     Aug 91 – Oct 91     Process Engineer
     Pentasia Chemicals Ltd,
     Cuddalore,India

1)     PLANT     Pentaerythyritol and Sodium Formate plant
     DUTY ASSIGNED     Responsible for Operation, Maintenance and Administrative activities of Pentaerythyritol and Sodium Formate plant
VIII)     Apr91 – Jul 91     Project Engineer
     Ramani Chemasea Entech Systems Ltd,
     Chennai
DUTY ASSIGNED     Responsible for design of Utility lines for Monochrotophos project
IX)     Sep 81 – Aug 89     Technician
     Tuticorin Alkali Chemical Ltd,
     Tuticorin,India
PLANT     Sodium carbonate and Ammonium chloride plant
DUTY ASSIGNED     Responsible for operation of Utilities and Ammonium Chloride plants
Professional Since: 
Jul-1994 (30.8 yrs experience)
Oldest experience: 
Oct 2011 (13.6 yrs experience, WARNING: 17.3 years variance with Professional Since)
Years Experience: 
8

Market Place

No results found... (try selecting a different content filter)