steven barclay
First Name:
steven
Last Name:
barclay 2009 – Current - Network Planner
This consists of creation of network plans and identification of materials to support execution of the plans including preparation of estimates and the detail scheduling of work orders.
• Experience in project management in primavera P6 Rel 6.2
• Report & perform critical path analysis
• Create & update S-curves.
• EVM – Earned Value Management
• Continually monitor and review of network resource plans.
• Scheduling projects
• Risk co-ordinator
• Work within all company and legislative health & safety guidelines.
• Liaise with stakeholders & management
• Ensure plans define & reflect scope & workload
• Responsible for developing, updating & metrics
• Computer literate with the following Microsoft packages – Project, Excel, Access database, Outlook, Power point & Word.
2007 – August 2009 - Cost Engineer
• Close liaison & communication with technical & operations teams at all levels within the company
• Assisted in the constructed estimate for HVAC (heating, venting, air & conditioning) system to populate the astute cost model
• Estimate and construct Ventilation system procedures
• Understanding of engineering drawings at manufacture and installation levels
• Producing insulation guidelines
• Estimate and construct weapons procedures
• Understanding of engineering drawings at manufacturing/installation levels
• Produced bottom up/ top down labour & material estimates to completion
• Construct audit trails to each piece of work to the MOD (Ministry of Defence) acceptance.
• Provide man hour budgets & advice to production for project monitoring purposes
• Review & implement new cost ideas for design cost reduction objectives focusing on new design initiatives to cost saving.
• Compile bills of materials, quantities & norms
• Develop & maintain customer relationship both internal & external & support negotiations with all customers
• Apply quality & HS&E management system documentation e.g. process instructions, workmanship standards, risk assessments to particular work scope and adhere to all HS&E rules & control measures.
This consists of creation of network plans and identification of materials to support execution of the plans including preparation of estimates and the detail scheduling of work orders.
• Experience in project management in primavera P6 Rel 6.2
• Report & perform critical path analysis
• Create & update S-curves.
• EVM – Earned Value Management
• Continually monitor and review of network resource plans.
• Scheduling projects
• Risk co-ordinator
• Work within all company and legislative health & safety guidelines.
• Liaise with stakeholders & management
• Ensure plans define & reflect scope & workload
• Responsible for developing, updating & metrics
• Computer literate with the following Microsoft packages – Project, Excel, Access database, Outlook, Power point & Word.
2007 – August 2009 - Cost Engineer
• Close liaison & communication with technical & operations teams at all levels within the company
• Assisted in the constructed estimate for HVAC (heating, venting, air & conditioning) system to populate the astute cost model
• Estimate and construct Ventilation system procedures
• Understanding of engineering drawings at manufacture and installation levels
• Producing insulation guidelines
• Estimate and construct weapons procedures
• Understanding of engineering drawings at manufacturing/installation levels
• Produced bottom up/ top down labour & material estimates to completion
• Construct audit trails to each piece of work to the MOD (Ministry of Defence) acceptance.
• Provide man hour budgets & advice to production for project monitoring purposes
• Review & implement new cost ideas for design cost reduction objectives focusing on new design initiatives to cost saving.
• Compile bills of materials, quantities & norms
• Develop & maintain customer relationship both internal & external & support negotiations with all customers
• Apply quality & HS&E management system documentation e.g. process instructions, workmanship standards, risk assessments to particular work scope and adhere to all HS&E rules & control measures.
Professional Since:
Aug-2009 (15.3 yrs experience)
Oldest experience:
Dec 2009 (15.0 yrs experience, WARNING: 0.3 years variance with Professional Since)
Years Experience:
10 - Industry:
- Region: