Jennie Ross Mamingao
SKILLS:
Computer Literate : MS Office Excel
MS Office Word
MS Office PowerPoint
Primavera Project Planner (P6)
WORK EXPERIENCES:
Planning Engineer
Exyte Taiwan Co., Ltd.
Changhua, Taiwan
March 2019 - Present
Project Assignment: Data Center
Duties & Responsibilities
- Developing schedule with activity codes (One WBS) and global WBS as per Client requirements interface with cost loaded activities to easy track progress concerning earned value or revenue.
- Work in conjunction with the Planning Manager and project leader in the development of overall project procurement strategy, sequencing, phasing and logistics.
- Coordinate & communicate with all concerned groups including sub-cons prior to the preparation of weekly and monthly reports.
- Weekly monitoring of progress in each phases and disciplines, analyze SPI and CPI reflect in weekly report for Client submission.
- Weekly and monthly update of P6 working programme, evaluate critical path and total floats which can affect the key milestones of the project.
- Prepares progress measurement unit in each work packages whereas weightage based on cost.
- Prepares detailed commissioning schedule with complete list of equipment items includes all levels of commission such as L1– factory acceptance test (FAT), L2 - Installation Verification, L3 – Start up / Pre-functional, L4 – Functional Test and L5 – Integrated System Test (IST)
Planning Engineer
Thales Gulf
West Bay, Doha, Qatar
December 2017 to January 2019
Project Assignments: Doha Metro Project – (Systems Scope: Signaling, Telecoms, SCADA & AFC)
Duties & Responsibilities
- Coordinate & communicate with all concerned Departments (Engineering, Procurement, Construction and Offshore Groups) prior to the preparation of weekly and monthly reports.
- Weekly monitoring of progress in each systems and functionality, analyze SPI and reflect in weekly report for submission to Client.
- Monthly update of P6 working programme, evaluate critical path and total floats which can affect the timeline of the project.
- Monthly updates of TILOS programme.
- Attends weekly meeting with consortium and client representatives.
Planning Engineer
Chiyoda Almana Engineering LLC
Markaz Almana Building, Al Mattar Street Najma, Airport Road
Doha, Qatar
December 2013 to December 2017
Project Assignments: RASGAS Long Term EPCm Service Contract, Train 1 – Train 7 (Reimbursable Contract)
QATAR GAS Long Term EPCm Service Contract (Reimbursable Contract)
Duties & Responsibilities
- Report & Coordinates with the Controls Division Manager and Lead relative to Planning & Scheduling issues for various on-going projects.
- Prepares Level II project schedule (FEED & EPC) using Primavera 6 (P6) for various projects for Service Proposal (SP) and Level III / Level VI schedule upon receipt of Service Order (SO) from the Client for implementation.
- Coordinates & Liaise with all concerned Departments (Engineering, Procurement, Construction & other department prior to the preparation of Service Proposal (SP).
- Develop and updates baseline schedule in P6 and other related documents: PMU, Cost & Man-hour Plan, Monthly Cost & Man-hour forecast for all projects assigned.
- Develop short-term schedules: 3-Week Look-ahead & 3-month Look-ahead, etc.
- Prepares Chart, Histogram & S-Curve required to represent Planned, Forecast and Actual Project Status in Primavera or Excel.
- Prepares progress measurement unit (PMU) for each project assignments.
- Prepares Weekly & Monthly Progress Report for submission to Client.
- Prepares Monthly Consolidated Report for submission to Client.
- Participate in the preparation of Monthly Progress Billing for project assigned.
- Performs any other related Project Control works & documents as required by the Client, Control Division Manager and Company’s Top Management.
Planning Engineer
Saudi Oger Limited
Nadah Bldg., AL Nhadah Road
Ar Rabwa Riyadh, KSA
June 2013 to December 2013
Duties & Responsibilities
- Using specialist planning management software like P6.
- Directly reporting to planning manager.
- Prepare baseline schedule consists of engineering, procurement and construction phases projects like high rise buildings, villas, palace, universities and airport with VVIP & VIP classes.
- Selecting the appropriate techniques and sequence of events for a particular project.
- Identify and monitor critical path of each projects assigned.
- Loading resources in baseline schedule and prepare manpower histogram & S-Curve.
- Prepare monthly production report.
Planning Engineer
Six Construct Co. Ltd.
Manama, Kingdom of Bahrain
May 2012 – March 2013
Project Assignment
Client: Signature Hotels Management Company (SHMC)
Project Name: The Four Seasons Hotel Bahrain
Project Location: Bahrain Bay near Manama
Project Description: Approx. 54,000 m2, a 50 Storey Luxury Hotel
Duties & Responsibilities
- Directly reporting to planning manager.
- Monitor the progress of the construction site and update progress in the Primavera (P6) working programme.
- Daily site progress photographs.
- Issue weekly site progress photographs to the Client.
- Issue Site daily report.
- Prepare and maintain weekly KPI’s progress graphs for concrete production, block work, screed, MEP trades and facades.
- Prepare and maintain Area progress drawings.
- Prepare and maintain concrete pour history for Tower cores and slabs.
- Issue 2-week look ahead of Construction progress update.
- Assist in production of Client monthly report.
- Partially work in North Manama Causeway – Road access to Bahrain Financial Harbour and Bahrain Business Bay.Prepares monthly report, monitor progress and maintain working programme.
Planning Engineer
Saudi Oger Limited
Second Floor, Inara Plaza, Riyadh, KSA
April 2010 to December 2011
Duties & Responsibilities
- Using specialist planning computer software like P6.
- Prepare baseline schedule consists of engineering, procurement and construction phases of incoming private projects like high-rise buildings, villas, palace and universities.
- Selecting the appropriate techniques and sequence of events for a particular project.
- Monitoring progress throughout the construction process and comparing this with the projected schedule of work.
- Reports on the site every once a week for the monitoring of progress, materials and manpower.
- Consolidate progress reports from the site weekly and monthly and submit it to the top management.
- Updates resources loading based on remaining works.
Planner/Scheduler
ALT Cladding Incorporated
Chino Roces Ave. Corner Bagtikan St. San Antonio Village, Makati City
September 2009 – April 2010
Duties & Responsibilities
- Prepares project schedule (EPC) using Primavera 6 (P6) for various projects.
- Prepares Bar Chart and S-Curve with resources load in P6.
- Details the schedule based on the present condition or workability of the project.
- Analyzes variances on time and resources.
- Maintains and update schedule, baseline against actual and highlight critical activities ensures to carried out on time.
- Generates and recommend resources requirements and responsible for workability of plans and schedules.
- Attends mock up test of curtain wall which having a stick and unitize system.
EEI Corporation
July 2009 -September 2009
Project Assignment
Client: Ayala Land, Incorporated
Project Name: One Serendra District 1, Phase 2B
Project Location: Fort Bonifacio, Taguig, Metro Manila
Project Description: Residential Condominium
Cost Engineer
EEI Corporation
June 2008 – June 2009
Project Assignment
Client: Medical Doctors Incorporated
Project Name: Makati Medical Center Annex Building
Project Location: #2 Amorsolo St., Legaspi Village, Makati City
Project Description: 12 Storey Building
Cost Engineer
EEI Corporation
April 2008 – June 2008
Project Assignment
Client: Globe Asiatique
Project Name: Globe Asiatique Tower II
Project Location: EDSA & Boni Avenue, Mandaluyong City
Project Description: 30 Storey High Rise Building
Duties & Responsibilities
- Gathers data and verifies actual cost entry for the preparation of cost evaluation reports.
- Takes the lead in monitoring and quantity take-off of change orders, additional works and claims.
- Monitors and reconciles subcontractors and suppliers’ billing based on accomplishment work, quantity and unit price.
- Analyzes cost variance between agreed budget and actual cost. Review and sets priorities in allocation of project funds for PM’s guidance.
- Set-up forecast cost for the payable and possible expenses every month to maintain the incremental movement and replace it with actual cost every cut-off.
- Encodes manhour utilization per activity level on ACTIVITY BASED COST program and monitors equipment utilization.
Quantity Surveyor
EEI Corporation
May 2007 – December 2007
Project Assignment
Client: JGC Philippines, Inc.
Project Name: CBN HPP-2 Project
Project Location: Rio Tuba Bataraza, Palawan
Project Description: Nickel Processing Plant
Duties & Responsibilities
- Implements the quantity monitoring system based in contract and actual works.
- Prepares progress accomplishments and productivity reports weekly and submit it immediate head for consolidation of all reports.
- Visits site to monitor the daily progress.
- Identifies records and monitors variances and deviations in approved drawings against the bid/contract drawings.
- Prepare quantity take-off of all additional works, change orders and claims for the billing supporting documents.
- Checks and validates subcontractors’ accomplishment.
- Coordinates with planning and cost engineers for accomplishment of an activity and quantity prior for billing.
- Encodes and analyze manhour distribution and equipment utilization.
- Industry:
- Region: