Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

ahmed saleh

First Name: 
ahmed
Last Name: 
saleh

Ahmed Ibrahim Saleh

_______________________________________________________

 EGY Mobile :- 00971509842567  & (0020100) 157 4566

 

E-mail:Ahmedibsaleh@gmail.com

 

Dear Sir/Madam,

 

Professionals in every field must be aware of changes and possess the flexibility and imagination to stay ahead of trends in our global competitive markets.

My MSc / MBA studies and my 10 years practical experience in project management field of all aspects (planning/cost

Control, time management …) of 1 6 years in construction field   have taught me how to bring ideas

to life on time and under budget, creating an inevitable link between both the organization’s mission and our tactical plans in

the sites

The enclosed résumé elaborates on the details of my skills and experience.

I am looking forward for new opportunity in the Middle East or North Africa Countries

 You may reach me at the above telephone numbers or e-mail address.

Thank you for your consideration. I look forward to talking with you.

 

With enthusiasm

Ahmed Ibrahim Saleh


 

        Name

Ahmed Ibrahim Abd El-Magied Saleh

 

Profession

Membership of the Egyptian Engineering Syndicate -Civil  Dept.., Cairo

Nationality

Egyptian

Graduation Degree

Very Good

Military Service

Completed

Marital

Married

Date of Birth

20/6/1973

Language

Mother tongue- Arabic

English-Very Good

French – fair

 

Education

Degree

ý  B.Sc. of Civil Engineering 1995 From Ain Shams University

ý  Master Degree in Structural Engineering 2004 From Ain Shams University – Cairo - Egypt

ý  Master of Business Administration 2007 From Arab Academy in Cairo- Sheraton discrete

ý  Finished first phase studying  Ph. degree  in construction Management studies at Cairo University

Training  Courses

Following Courses at American University in Cairo

1999-Primavera  & 2003-Legal Aspects of Fidic Contracts &2004 Commercial Law &2007-Negotiation Skills &2008-Cost Control

Computer skills

v   : Primavera P6/P3--in-depth using MS Office Programs ( EXCEL- WINWORD- Power Point-MS Projects)- – Microsoft Project-SPSS

v   AUTOCAD

Address

10th Ismail El-Falaky St, El-Mahkama SQ., Heliopolis – Cairo – Egypt-Postal No.11351& Valid Drive License At  KSA & UAE

Phone

Egypt :- ( 00971-509842567)  / Egypt-00201001574566

 0020226425793 - 002/01222136987 

Email

 

ahmedibsaleh@gmail.com

ahmed_isaleh@yahoo.com

 

Duration                                     : 1/6/2011 till now

Employer: - HLG Al Al Habtoor Leighton Group Company –Abu Dhabi, UAE

Company Activity                  :  Contractors (JV - CCC/HLG)

I am honored to participate in following projects

 Project                  : LAND MARK SKY TOWER

 Comprises of  71 Floors (26 floors Residential, 27 floor Offices, Health club, Restaurant ,Sky Garden, Mechanical floors)

(Cost Value            : Lump sum - Project budget 650,000,000 $US

Position: -Senior  Planning Engineer -Project Control Department            

Client :- Department of President Affair DOPA-AbuDhabi

Job overview

v    Responsible for performing all planning and Schedule development, progress performance, variance analysis, schedule tracking, project monitoring, cost reports and relevant services

v    Target  Schedules of  MEP Packages , Finishing Packages

v    Responsible for Preparing Project Procurement Schedule for all Packages

v    Allocating resources , estimated cash flow charts distributed  along project life

v    Preparing periodical reports for monitoring construction , engineering-procurement progress and promptly prepare recovery plans to compensate time delays

v    Preparing earned value progress report

v    Participate in preparing  EOT claims

v    Preparing periodical productivity reports

v    Experienced in one-on-one management of contractor claims including time impact analysis, negotiation of dispute resolutions

 

Duration                                     : 1/9/2009 to 15/5/2011

Employer: - CCC–Consolidated  Construction Company

Company Activity                  :  Contractors

I am honored to participate in following projects

 Project                  : Housing Development Project Al- Rayyan Hills Resort-Sana’a Yemen

 Comprises of (Phase 1- comprises of 172 villas comprising of  different villa type fully furnished , Residential buildings 9 floors (9000 m2 ) comprising of concrete works, finishing works, electrical ,MP, Elevators,  Firefighting works , Stone cladding, Aluminum works and infrastructure works comprising of  sewage networks ,domestic networks Water Reservoir, 33KVA Substation, firefighting networks, medium networks ,low voltage networks ,light current networks, irrigation networks, S/H Landscape, Irrigation networks,… Storm water ne works )

Cost Value             : Cost Plus Project estimated budget 250,000,000 $US

Position: - Senior Planning Engineer -Project Control Department            

Project Management and Supervision Services:- QPM - Qatari Project Management

Client :- QD- Qatari Diar

 

 Duration                                    : 15 -8 - 2008 to 31-7-2009

Employer: - SNC-Lavalin inc.– Constrction Company

Company Activity                  :  Contractors

Company Nationality    : Canadian –North America

I am honored to participate in following projects

 Project                          : Benina international Air Port – Benegazi-Libya

 Comprises of (Main Terminal Building-Air Side Works-Land Side Works- Campsite Works) Cost Value          : Cost Plus Project estimated budget 330,000,000 EUR

Position: - Senior  Planner       

Project Management and Supervision Services:- Aéroport de Paris Ingénieri,  Libya, (ADPI).,El Naser Street, Tripoli, Libya

Job overview

v    Preparing Schedule of the Camp site . Value 18,000,000 Euro

Consisting of infrastructure Utilities (Sewage networks, Potable water Networks

, Fire Net Works, Electrical net works, Concrete Reservoir , Laboratory unit , Housing ,Offices Modules)

v  Passenger Terminal Building,(about 65,000 m2) Procurement –Engineering – Construction Activities for (Concrete Structure, finishing Works, integrated with Several Air port special Systems (Baggage handling system – Security systems – Metal Roof

v  Viaduct works (arrival departure,  connecting Land side with Terminal buildings)

 –Structural Glazing,…….)

v  Air side works Runways, Taxiways, Apron (Earth works, Apron concrete works, drainage system-utilities networks Asphalt works,………)

 

 

Duration                                 : 1-7-2001 to 31-7-2008

(Project Manager Aug-2005 to Jul-2008, Planning & Cost Control Manager Jan-2005 to Jul-2005, Planning Manager Dec-2003 to Dec-2004, Planning-Cost Management Engineer Mar-2002 to Nov-2003, and Site Engineer Jul-2001 to Feb-2002)

Employer: - Engineering Department –Smart Village -(http://www.mcit.gov.eg/)   

Company Activity                  :  Project Management

I was honored to participate in following projects

 

 Project                          : NILE University Project (First phase) at El sheikh Zayeed City- (http://www.nileu.edu.eg/)

 Comprises of (Infra structure project, utilities building, Administration building & Educational buildings) Cost Value          : 100,000,000 $US

Position: - Project Manager:-leading team of 9 engineers from different trades (Aug-2005 to July 2008)

 

Contractors: Petrojet Company, MEDCOM Company, GINZA for Construction Company

Consultant    : CEGMAN GroupJ.V (El Adwy Naseef Consultant & Shaker Group-Consultant)

Job overview

v    Involved  in preparing the tender documents (Specifications & Method of measurements & Bill of Quantities & Contract Terms- Technical and financial evaluation for bidders' offer)

v    Preparing master schedule for the university buildings, associated infrastructures and landscape works for each project phase

v    Review engineering-procurement-construction schedules – resource/cost loaded  for construction activities

v     Review cost reports ,earned value for all projects in each phase

v    Review Monthly Payment Certificates

v    Monitor and facilitate the progress of projects through continuous updating for approved time schedule , weekly and monthly site meetings with different management levels from consultant and contractors team

v    Generate Monthly reports presenting the projects progress - the Project Challenges & anticipated extra costs due to variation orders or extra works &Analysis for  providing Recommendations to speed up the work progress in site

v    Involved  in the approval of quality control plan & HSE Plan

v    Involved  in making decisions concerning variation orders and claims submitted by contractors

v    Involved  in the approval of the architectural submittals& inspection Supplied Materials on Site & Review monthly Invoices prepared by Contractors

v    Coordinate and Communicate with the project team and senior management to make sure that the works in different trades (structural-ARCH-Plumbing-HVAC-Fire fighting-light current-low current)  is done accurately with high quality, on time, within budget, according to the project specifications and requirements.

v    Close the project. This final step consists of two distinct activities:

o                     Hand off. Ensure that the deliverable is handed off to the Tenant.

o                     Recycle. Make sure that the hard-earned lessons learned during the project are passed on to others.

|Position: -Project Control Manager in the following Projects (Planning & Cost Control)

(Jan-2005 to July 2005)

working in  the Office buildings comprising of (concrete works – Arch, works, MEP works) and associated infrastructure works comprising of (sewage networks , domestic water, electrical networks, fire fighting networks, irrigation networks , fiber cables, light current networks , irrigation networks,….)

v  Establish and maintain progress monitoring procedures and maintain an informed position on all matters relating to site progress and procurement of materials.
 Management Teams.

v   Review / Approve Contractor’s project schedules for construction logic, activity duration, and resource allocation. Monitor the Contractor’s Material Submittal schedule, Monitor the Contractor’s Shop Drawing submittal schedule..

v   Advise and assist the consultants and contractors in the development of their schedules.

v   Monitor and report the actual progress of the work versus the planned work.

v  Prepare technical Proposal and Tender evaluations.

v  Prepare monthly progress reports text and Schedule summaries / look-ahead.

v   Estimate time element of change of orders and incorporate within the schedules.

v  Monitor actual production rates and compare with plan.

v  Prepare reports as requested commenting on all aspects of project progress making

v  Recommendations for improvement where appropriate. RISK REPORTS and Meetings.

 

1-Project   :The Egyptian Post Building (B146) at Smart Village- Cost Value : 39 Million LE

(http//www.smart-villages.com)

From 1-12-2004 to 31-7-2005

Position Project Control  Manager

2-Project   :Medium Companies Building (B124) at Smart Village Cost -:71 Million LEProject   :Small Companies Building (B115) at Smart Village -Cost Value -:24 Million LE

|Position :- Planning Manager.

From 1-12-2003 to 1-12-2004

Project  :- Utility Buildings (B12&B25) at Smart Village -Cost Value -:6 Million LE

From 1-3-2002 to 1-12-2003

Post:- Project control engineer (Planning-Cost Management )

Project  :Mosque & Social Activity Building at Smart Village

Cosst Value -: 5 Million LE

Contractor                                      : Arab Contractors Company

|Position: - Site Engineer.

From 1-7-2001 to 1-3-2002

Project      : B2&B5 Residential Buildings at Smart Village Cost :- 25 Million LE       

                                                        

Duration                                     : 1/2/1999 till 31/5/2001

Employer: - CAMPENON BERNARDSGE

Position:-Technical Office Engineer                

Company Nationality                 : French

Project                                          : El-AZHAR Road Tunnels-Cairo-Egypt.

Consultant                                  : National Association of Tunneling.

Cost Value                                   : 1100Million LE

Job overview

v      Preparing workshop drawings for Ventilation Stations, Exit & Entry shafts for TBM machine.

v      Participating in the design of Salah Salem Ventilation station.

v      Participating in the design of Attaba Ventilation station.

v      Coordination between structural drawings, architectural drawings, electrical and electromechanical, plumbing drawings.

v      Preparing bar list for reinforcement concrete drawings.

                                                               

Duration                                     : 1/4/1998 till 31/1/1999

Employer: - Alexandria Construction Company

Position: - Technical Office Engineer

Company Nationality                : Egyptian

Project                                         : Golden Pyramids Plaza, Nasr City

Consultant                                  : Bechtel.

Cost Value                                  :100Million$

Job overview

v      Preparing workshop drawings for (Three Hotels , Three Apartments Hotels and Two Furnished Apartments Buildings ) Each consists of two garage floors and 16-residential/ office floors(Eight Commercial centers) each consists of three garage floors and four typical floors.

v      Coordination between structural drawings, architectural drawings, electrical drawings and electromechanical drawings.

v      Preparing bar list for reinforcement concrete drawings.

                                                               

Duration                                 : 1/10/1997 to 30/3/1998

Employer: - Arab Contractors Company (Bridges Department)

Position                                       : - Site Engineer

Company Nationality                : Egyptian

Project                             : Engineering Base Project at Cairo Air Port

Consultant                                  : Mahram-Bakhowm

Cost Value                                   : 120 Million$

Job overview

v      Inspection site civil construction works  ,site surveying, Soil improvement, concrete shuttering ,cast in-situ  road slabs, masonry, finishing , ensure compliance with specification and drawings

v      Reviewing Drawings, Processing , checking, and tracking all technical and engineering submittals , Contact and coordinate with manufactures and suppliers  for construction supply items , Materials inspection &preparing soil and compactions reports & concrete tests results, co-ordinate between subcontractors

References furnished upon request

Professional Since: 
Nov-2001 (22.9 yrs experience)
Oldest experience: 
Jul 1996 (28.3 yrs experience, WARNING: 5.3 years variance with Professional Since)
Years Experience: 
17

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.