fhy frank
First Name:
fhy
Last Name:
frank - Over 8.5years work experience in project management role.
- Participate in 7 projects, 5foreign projects and 3 involved from detail design to mechanical completion.
- The planning and scheduling methodology is a high level of proficiency for <?xml:namespace prefix = st1 />EPCproject.
- Advances planning experience for various project was referred to industrial pharmaceutics, petrochemical and chemical building etc.
- Skill in schedule software tools by using P3~6 and Microsoft Project/Exceletc.
- Planningand scheduling wholeEPCmproject integrating each phase deliverable activities as to establish schedule have a reasonable duration,and logical sequence. It was experienced up to five Levels of schedules as requirement.
- Advanced skills to monitoring, updating, analysing schedule/progress and setting up progress measurement through various project phases.
- Competent to Risk Management & Opportunities through project lifecycle. Risk assumption and assessment for each phase & stage and involved parties of project. Simulate risks and set reliable targets for project management team.
- Skilled project hierarchy for phase, unit, discipline, deliverable list, activities, systems, resources and Volumes. The capability of settingup project WBS, DBS, VBS and OBS to meet project management requirement in correspond with Client approved procedure.
- Skilled technical knowledge for CSAdesign and construction. General knowledge for the processes of discipline design, construction, costestimate/control,document control, contract management, safety and QA/QC management.
-
Competent to maintain good interpersonal relationship with various parties to facilitate project proceeding closely.
- flucent english
Professional Since:
Oct-2002 (22.4 yrs experience)
Oldest experience:
Jun 2008 (16.8 yrs experience, WARNING: 5.6 years variance with Professional Since)
Years Experience:
42 - Industry:
- Region: