Archer Alfornon
|
PROFESSIONALSUMMARY:
Archer has extensive experience in various technical, engineering disciplines, projects and maintenance. He specialises in the development, implementation and management of all project planning and controls systems, and offers invaluable support to the specific needs project teams. Works involved in LNG Construction Process Area, Mining Plant Site, Mechanical Design, Piping, Chilled Water Piping (CHWP), Fabrication and Installation, Project Planning preparation with the use of Primavera V3.1, P5/P6/P7/P8.1 & Microsoft Project in application of SAP System & JD Edwards.
Archer’s ability to work so efficiently stems from a positive, open minded approach and well developed interpersonal skills. He oversees master schedules on all works, including planning, scheduling, cost control, progress measurement and earned value management. His deep knowledge of and aptitude for scheduling and progress systems and his proven ability to identify potential problem areas through critical path analyses, have, in combination with his expertise in formulating mitigating plans and fostering positive, working relationships, are key areas to ensure project success
RELEVANTPROJECT EXPERIENCE:
Monadelphous, Eurombah Creek GPF | July 2014 – Current | Experienced Planner / Scheduler | $200m |
Eurombah Creek GPF (Gas Compression Facility) 2 Trains consisting of PAU’s (pre-assembled units) HP and LP compressors, Dehydration facility and large compressor building, HV switch yard and associated works. The purpose of the upstream Gas Processing Facilities (GPF) is to receive gas from the wellhead gathering system network where it is then compressed, dehydrated and metered prior to entering the main pipelines to Curtis Island. Each GPF consists of inlet separation and coalescing for removal of bulk water and solids from the gas stream, four stages of electric-driven centrifugal compression with associated gas cooling and scrubbing. The scope of works includes full civil scope, material, supply, fabrication, surface treatment and delivery to site, storage at site and installation of structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning and assistance in load commissioning and performance testing works. | |||
| |||
| |||
Monadelphous, Wandoan | Feb 2014 -Jul 2014 | Lead Planner / Scheduler | $20m |
This scope covers the transfer and metering of Sales Gas under controlled conditions. The scope of work broadly includes the equipment and nominated material supply, fabrication, surface treatment and delivery to site, storage at site and installation of control and metering skids, structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning, and assistance in load commissioning and performance testing works. The client is Australia Pacific LNG is a joint venture of Conoco Phillips, Origin & Sinopec to develop extensive Surat Basin coal seam gas reserves, process & deliver the CSG to an LNG facility located in Gladstone QLD, ultimately export up to 16Mtpa LNG to world markets. |
Monadelphous, Wheatstone | May 2013- Jan2014 | Experienced Planner | $300m |
The contract covers construction, operation support and other services in the early phases of the Wheatstone project. It will include installation of surface and underground utilities, temporary services and access roads along with water, wastewater treatment and power generation facilities. This is another significant contract reflecting our reputation for the safe and reliable delivery of construction and maintenance projects in the oil and gas sector. It also continues our relationship with Chevron Australia Pty Ltd and also Bechtel (Western Australia) Pty Ltd, the engineering, procurement and construction contractor for both the Wheatstone LNG Plant, BHP Billiton’s Worsley Efficiency and Growth Alumina Refinery Project at Collie, in the South-West of WA. |
Monadelphous, Kestrel CHPP, | Jun 2011-May 2013 | Lead Planner | $260m |
The scope included the structural, mechanical, piping, electrical and instrumentation upgrade of a Coal Preparation Plant including raw / produced coal stockyard and upgrade of existing stacker / reclaimers and Stockyards. |
PROJECT HISTORY:
Project name | Role | Project type | Duration |
Monadelphous, Eurombah Creek | Experienced Planner / Scheduler | CSG | Jul 2014 - Current |
Monadelphous, Wandoan | Lead Planner / Scheduler | CSG | Feb 2014 – Jul 2014 |
Monadelphous, Wheatstone | Experienced Planner | LNG | May 2013 – Jan 2014 |
Monadelphous, Kestrel CHPP | Lead Planner | Coal | Jun 2011 – May 2013 |
Ambatovy Project (SNC LAVALIN INT’L INC. “EPCM”) | Snr. Planner/Scheduler | Lump Sum (US$4.761 Billion) Nickel/Cobalt | Sep 2008 – Feb 2011 |
RasGas LNG Onshore Expansion Project Phase 2 (Chiyoda/Technip JV) | Snr. Planner | Lump Sum (US$4 Billion) LNG | Dec 2006 – Jul 2008 |
Various (CAT International Co. Ltd.) | Snr. Planning & Scheduling /Projects Controls Engineer | Heavy Industrial | Dec 2005 – Nov 2006 |
Various (Saudi ARAMCO Testing and Inspection (T&I) Planning and Projects Unit, Maintenance Div., KSA) | Planning/Projects Engineer | Oil/Gas | Dec 2002 – Oct 2005 |
GRTA “General Refinery Turn Around”- Saudi ARAMCO, KSA | Shutdown Planner/ Project Controls Engineer | Oil/Gas | Mar 2004 – Apr 2004 |
Various (Projects & Maintenance – Al Suwaidi Ind’l. Serv. Co. Ltd., KSA) | Planner Engineer/Quantity Surveyor/ Mechanical Engineer | Oil/Gas | Oct 2001 - Dec 2001 |
- Industry:
- Region: