Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Adam Cruise

First Name: 
Adam
Last Name: 
Cruise
 EXPERIENCE
Director
Hornet ( PTY ) Ltd
September 2008 – present

Consulting Project Planners to the Engineering Industry.

Clients include IAMGold ( Canadian ), GRD Minproc ( Australian ), Wade Walker ( South African ), Essakane Gold ( Burkina Faso ).
Senior Lead Project Planner
GRD Minproc
August 2006 – September 2008

Lead Head Office Planner supervising 4 Planners.
Set-Up of Planning System and Standards.
Full Planning Functions from Project Feasibility Study, Inception, Engineering / Drawing Office – Procurement – Construction & Commissioning in all disciplines for the Mining Industry and Associated Process Plants and Systems ( Gold, Platinum & Other Minerals ). Integration into Overall Schedule of Sub-Contractors Project Schedules and Updates.

Senior Head Office Planner
Bateman B.V.
2003 to 2006

Project:
Elizabeth Bay Liberation Project in Namibia

Duties:
Senior Head Office Planner appointed to evaluate and oversee the Elizabeth Bay Diamond Liberation Project in Namibia awarded to Bateman by Namdeb and various other projects

Senior Site Planner
Greenblat & Hutton
2002 to 2003

Project:
Polokwane Smelter Project

Duties:
To co-ordinate, plan and monitor the fast - track project of the new Platinum Smelter and associated systems and services
Duties included assisting, monitoring and tracking all contractors planners and client reporting thereof
This was a Greenfield site with the project directive of the total construction to first heat - up of the Smelter in one year
Systems included the total handling and distribution of the matte and slag materials, to the flash drying process, Smelting, Matte and Slag handling and furnace Off-Gas handling, and all electrical & instrumentation services i.e.
Construction of the main incoming consumer substation, Furnace substation with main plant control room and the Flash Dryers substation, all site offices and workshops etc

Senior Site Planner
Geoflux (Pty) Ltd
2001 to 2002

Project:
Debswana (De Beers Corp) Orapa Diamond Mine - Botswana

Duties:
Consulting Planner for the Civil, Mechanical, Electrical and Instrumentation installations of a new underground Primary Crusher, associated Conveyors, 12000 t Splitter Bin, Substation, Holding Dam and Pump Stations, Haul Roads and Stormwater System
Two further contracts were awarded being a new Fuel Filling Station and construction of a new Slimes Dam Duties included the supervision and integration of the Civil, Mechanical, Electrical and Instrumentation Sub Contractors level 4 Project Plans, tracking by means of performance S- Curves and project reporting to the client ( Debswana - Johannesburg


Member/Planning Contractor
Cruise Corporation
July 2000 to 2001

Project:
Wade Walker ( Electrical and Instrumentation)

Duties:
Project Planning Services to Wade Walker (Electrical and Instrumentation) including design of project plan, resource allocation and levelling, resource costing, baseline and accelerated plan comparisons for contract claims and performance S- Curves with baseline, accelerated and actual performance curves
Clients:
Northam Platinum - Electrical, Lighting, Racking and Instrumentation
Expansion to Rod Mill, Ball Mill, Primary and Secondary Roughers, Cleaner / Re cleaner, Reagents, Thickening, Screening, Silo and screen feed, Fine Ore Silo, Primary and Secondary Crushers, Conveyor and Loading Systems

Site Planner
Cegelec (Alstom Industries)
February 1999 to July 2000

Project:
Mozambique Aluminium Smelter

Duties:
Site Planner on the Mozambique Aluminium Smelter construction project reporting to the consultants ( EMS)
Full project planning and performance S-Curve weekly reporting on the 66kV, 22kV, 11kV and 33kV Electrical Reticulation Installation
Project consisted of construction of Aluminium racking, installation of Switchgear, UP S’s, Transformers, Feeder and Bus Coupler banks in 14 site substations, Site Electrical Reticulation from temporary Construction power to Final Site Power ( both aerial and underground ), Power Shutdown scheduling and planning for termination, commissioning and re-energising of systems
Planning and integration into main project of subcontractors projects, being the harbour substation construction and Potline Material Handling Instrumentation and control projects
Project Leader and Planner of the site Road and Area Lighting project, liaising and integrating installation of the road and area lighting with the Roads construction teams ( WBHand Rumdel)

Project Manager
Servequip Enterprises
June 1998 to December 1998

Project:
Harbour Oil Storage and Distribution Upgrade

Duties:
Project and Purchasing Manager with this international company in Angola
Project manager on the Harbour Oil Storage and Distribution Depot upgrade in the port of Luanda

Project consisted of the overseas procurement and installation of ductile iron piping, pumps, valves and fittings, oil storage tanks, oil storage fire fighting equipment, building construction and substation construction and associated cabling and equipment Value: $ 9 million
Other projects:
Procurement and Installation of Satellite TV Re-Broadcast
System to Specific area in Luanda and offshore shipping and oil rigs
Value: $ 15 million
Procurement and Installation of a Reverse Osmosis Water treatment plant, and construction of associated water storage and distribution system
Value: $ 2 million

Asst. Project Manager
Loss Control (Pty) Ltd
January 1997 to May 1998

Duties:
Assistant project manager in corporate and industrial Access Control, Intruder detection and CCTV systems installation, incl Site supervision, purchasing, planning, cost control and Head-end equipment programming and commissioning

Member / Project Manager
Cruise Corporation
May 1995 to November 1996

Duties:
Project manager for 2 divisions of Siemens Ltd, being the Transformer manufacturing and Pre-paid Metering divisions
Duties included project planning, production planning, purchasing, costing and tendering, technical and commercial documentation
Clients included: Alusaf, Eskom Majuba, Sappi, Iscor, Becor and various municipalities

Purchasing Manager
Fluor Constructors
November 1994 to April 1995

Duties:
Set-up of a Purchasing Dept for new division of Fluor, taking over existing orders placed by Fluor Engineers and implementing a new purchasing system
Duties included purchasing, Material requirement planning
Tender evaluations and Budgeting
Clients included: Sasol, Sappi and various other civil works

Contracts Engineer
G.E.C. Measurements
January 1988 to August 1994

Duties:
Contract management for a new division of GEC to design and build relay protection and control systems with loose relays being marketed by GEC Projects division
Also as factory production manager doing production planning, purchasing and scheduling
Clients included: Eskom (phase 1, 2 and 3), Cullinan Power Projects, various Eskom Power Stations and Municipalities

Owner
The Casting Agency
October 1984 to September 1987

Duties:
Owner of a Film and TV Casting Agency, supplying actors, extras and stunt personnel to the film, television and advertising industries

Apprentice Aircraft Maintenance Engineer
Field Aviation (Pty) Ltd
January 1981 to August 1984

Duties:
Working on Engines, Airframes, Hydraulic and Pneumatic, and Cable systems
Professional Since: 
Aug-1992 (32.0 yrs experience)
Oldest experience: 
Sep 2006 (18.0 yrs experience, WARNING: 14.0 years variance with Professional Since)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.