Kishor Deshmukh
First Name:
Kishor
Last Name:
Deshmukh KISHOR M. DESHMUKH
4537 Cherry Forest Circle Tel : (860) 857-9265
Louisville, KY, USA 40245 E-mail: deshmkm@yahoo.com
EDUCATION AND TRAINING
B. S. (Civil Engineering)
Advance Training in Earned Value Management (EVM) at Sikorsky Aircraft, Stratford, CT
Advanced Training in Primavera Expedition Version 8.0 by Primavera Corp.
In-house training in Primavera P3e at Northeast Utilities, Berlin CT.
In-house training in Primavera P3 Project Planner at Millstone Station, Waterford CT.
Basic and Advanced Schools in Project/2 by PSDI, Ann Arbor, MI.
In-house training in Planning and Cost Engineering with Bechtel Power Corp. Ann Arbor MI.
Member of the Toastmasters International.
SUMMARY OF EXPERIENCE AND SKILLS
• Dominion Resources – Working as Project Scheduler on Dominion Nuclear Engineering Projects.
• Sikorsky Aircraft – Worked on the Design and Development Project of the next generation aircraft for US Marines, as a member of the Planning and EVM Team, using Primavera P6 and advance EVM techniques.
• Electrical Distribution: Worked on Northeast Utilities DSCADA commissioning project – planning, scheduling and project controls, using P3e.
• Nuclear: Worked at Millstone Point - Unit 1, Unit 2, and Unit 3; Nine Mile Point Unit 2, Pilgrim Nuclear Station, Davis Besse Nuclear Station, and Midland plants during past twenty years, on various facets of planning, scheduling and project controls functions.
• Construction: Prior twelve years were mainly associated with the construction and management of infrastructure, industrial, Petro-Chems and housing projects. Worked as Field Engineer to Project Manager, on various aspects of construction - field supervision, tender preparation, budgets & cost, project control etc.
• Participated in developing and implementing several Refuel, planned and forced outage schedules, coordinating with operations, maintenance, engineering, health physics, materials management and outage management at various plants. Developed Project Plans and Schedules for 10CRF50.54f (Design/Licensing Basis) at Millstone Point Unit 1 and Procedure Upgrade Project for Millstone Station.
• Extremely proficient using Primavera P6, P3e – Enterprise and Primavera P3 - Project Planner version 3.1 - setting up coding structure, WBS, Cost Accounts, Resource library, and a variety of graphic layouts to suit user needs. Very proficient in use of MS Project. Knowledgible in batch and export/import routines in and out of P3 to and from MS Access, MS Excel and MS Project and conversions to Acrobat PDF files. Resource & Cost assignment and levelizations. Very proficient in CPM Schedule analysis for time and cost.
•Well versed in EVM practices and analysis. Sikorsky Aircraft uses one of the most advanced EVM
techniques in the industry to satisfy the DOD and Congressional guidelines of oversight. Performing schedule analysis using CPM in Primavera P3e / P6 and performance analysis using EVM – BCWS, BCWP, SV, CV, SPI and CPI evaluations in Winsight.
• Extensive use of PC applications - Excel, Access, Power Point etc., productivity - MS Project, MS Word. Inter applications data transfer / conversions - MS Project to Primavera P3, Project/2 to P3 etc.
• High degree of interpersonal and communications skills. Conducted meetings, made presentations, prepared reports and critiques.
• Developed coding structures, calendar assignments and resource allocations to reflect management philosophy, system configurations, Tech. Spec. requirements and other controlling parameters to prepare the project model, establish plans & schedules - in P3e, P3, P/2 and MS Project.
• Extensive use of report writers, resource constrained scheduling, multi-calendar micro-scheduling, full range of graphics and graphics report writer applications - using Primavera P3 and MS Project.
• Worked with various maintenance databases at different plants for work order systems, Master Equipment Lists, Surveillances, Preventive Maintenance - resident on both PCs and Mainframe.
• Worked on plant modifications and engineering planning/scheduling.
• Conducted training on CPM based computerized scheduling for planning/scheduling and plant personnel at Davis Besse, Nine Mile Point 2 and Millstone sites.
• Interfaced and coordinated with various plant management levels for conduct of plans and schedules.
CHRONOLOGY OF WORK:
• Currently working as Project Scheduler - Dominion Resources Apr 2009 to Present
Richmond, VA on FPRA, NFPA and Xmer / Switchyard Capital Projects.
• Project Planner / Scheduler at Sikorsky Aircraft, Sep 2005 to Apr 2009
Stratford, CT on Design, Development and Demonstrator
Build of the next generation Heavy Lift Helicopter for the Marines.
• Project Management Consultant, Proto-Power Corporation, Groton CT Jan 2004 to Aug 2005
• Project Planner / Scheduler, DSCADA Commissioning Nov. 2002 to Dec 2004
Project, Northeast Utilities, Berlin CT
• Outage/Project Scheduler, RFO 8, 7 & 6 - Millstone Point Unit 3 and Jul. 1997 to Oct. 2002
RFO 13 - Millstone Point Unit 2, Waterford CT.
• Project Scheduler, CMP - 10CFR50.54(f) Project. Oct. 1996 to Jul. 1997
Millstone Point Unit 1, Waterford CT.
• Outage Scheduler . June. 1995 to Oct. 1996
Millstone Point Unit 1, Waterford CT.
• Outage Scheduler - Startup Punchlist and KPIs Dec. 1994 to June. 1995
Millstone Point Unit 2, Waterford CT.
• Project planner, Procedure Upgrade Project. Aug. 1992 to Dec. 1994
Millstone Nuclear Station, Waterford CT.
• Outage Scheduling Consultant Nov. 1991 to Jun. 1992
Nine Mile Point Unit 2, Oswego NY.
• Outage Scheduling Consultant Mar. 1991 to Aug. 1991
Pilgrim Nuclear Station (RFO 8), Pilgrim MA.
• Outage Planning Consultant May 1987 to Mar 1991
Nine Mile Point Unit 2, Oswego NY.
• Planning Systems Supervisor Apr 1986 to Apr 1987
Toledo Edison Company
Davis Besse Nuclear Power Station, Oakharbor OH.
• Sr. Construction Planning Engineer Aug 1984 to Apr 1986
Stone & Webster Engineering Corporation
Millstone Point Unit 3, Waterford, CT.
• Sr. Planning and Scheduling Engineer Nov 1981 to Aug 1984
Bechtel Power Corporation, Ann Arbor MI.
Midland Nuclear Station, Midland MI.
• Various Assignments - Field Engineer, Construction 1967 to 1980
Engineer, Project Manager in construction industry in India and Iran
Personal: U. S. Citizen.
References: Upon request
Professional Since:
Nov-1975 (49.0 yrs experience)
Oldest experience:
Aug 2005 (19.3 yrs experience, WARNING: 29.7 years variance with Professional Since)
Years Experience:
0 - Industry:
- Region: