Professional Experience Professional Experience Professional Experience Professional experience | [ From 02 /09/2012 till Date ], Kuwait University- Construction Program (KUCP) Position : Chief Engineer Specialists - SABAH AL-SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY
- It’s a complete university, its area reach to 6 Million square meters, and its estimated Budget will reach to(KD 3,000,000,000).
- It is contains two campus. Main Campus & Medical Campus , Main Campus Contains 9 different Buildings Packages ,6 colleges (Each College contains Separate Building for Men & Separate Building For Women ) in addition to three other buildings packages which are ;Academic Support Facility, Administration Facilities,Student Activities and Athletic Facilities (SAAF),such buildings will be supported by 9 infra Structure Packages which areUtility Service Tunnels E & W, CUP 1 , 2 & 3 + MEP Works within the Utility Service Tunnels, Site Utilities, Ring Roads, Parking and Landscape, Decked Parking and Shelters (West and East)
- Medical Campus will include Medical Colleges and The Hospitals
- The university will accommodate about 40,000 Students
- Close to 100 Buildings and 100 Parking Lots
- World Class Learning Facilities
Responsibilities & Skills: - Monitor and supervise the implementation of the PM/CM Technical services as per the project management agreement.
- Review the deliverables of the PM/CM consultant.
- Supervise and Monitor all the scheduling and control aspects in the SSUC project.
- Monitor the compliance of the different project parties regarding the preparation, submittal, review and approval of the project Schedules.
- Supervise the Implementation of the Project Control System by the different project parties through the different Packages and for the whole campus.
- Monitor the Master schedule updates done by the PM/CM consultant and highlight the resulted variances compared to the approved plan.
- Supervise the implementation of the Project contract Manager Program (PCM) as a main part of the Complete PCS system that should be implemented by the project Management Consultant.
- Monitor and issue a summary reports about the overall progress of the University different packages.
- Handling all Kuwait university budget issues related to SSUC Project.
- Attend the progress and planning meetings whenever required.
- Monitor the implementation of the recovery schedules that may be required to absorb any recorded delays.
- Review and study the delay analysis reports issued by the consultant.
- Sharing with the PM/CM in the Preparation of KUCP response to any contractor or Consultant claims.
[ From 01 /05 /2010 till 31/08/2012], Arab Contractors- Kuwait Arab Contractors.JV- (Kuwait) Position : Assistant Project Director for Planning & Control Jaber Al-Ahmad Al Jaber Al Sabah Hospital Project(KD 304,000,000) it’s a hospital consists of an over 1100 bed, The Hospital project includes various buildings; Main Building, Dental , Central Plant, Under Ground Tanks, Residential , Car parking and other structures. The plot area of this Project is approximately 225,000m2. Responsibilities & Skills: Manage and lead the Planning Team which contains 3 senior planning Engineers to perform the following duties: - Preparation of the Project’s detailed time schedule.
- Loading the schedule by the major resources and all of the contract quantities & prices.
- Tracing the Progress and prepare the required updates for the project schedule.
- Producing the progress reports and presentations.
- Attend the progress and planning meetings with the client.
- Making the necessary re-scheduling for the project to catch the agreed finish date after getting the approved time extensions.
- Prepare any recovery schedules may be required to absorb any recorded delays.
- Issuance of delay analysis reports & recommendations to recover the delays.
- Sharing with Charter Q.S. in the Preparation of any contractor’s claims.
[ From 16 /12 /2006 Till 30/04/2010], Kuwait United Construction Management (K.U.C.M) Position : Project Control System (PCS ) Manager Responsibilities & Skills: - Implementing The PCS Strategies & Management Plan for (Tennis Complex Project, KD 40,000,000) at its different phases (Basic Design, Interior design, Construction & Close out).
- Making the required review and related actions for all the PCS submittals done by the Designers and contractors for the same project.
- Tracking the Compliance of the Contractors with The Contract Requirement & Taking the Required Contractual Actions accordingly.
- Sharing with the Management Team is Study of the Claims submitted by the contractors and preparing the required counter claims.
- Making the required reviews and related actions for The PCS submittals done by the contractors for some other Different Projects (Jet Aviation Package 4B & 4C, Discovery Project & Hawally - Municipality project).
[From 10 /10 /2002 Till 15/12/2006], TOTAL MANAGEMENT CONSULTANCY- Kuwait. Position : PCS Manager , Senior Planning and Control Engineer Responsibilities & Skills: Detailed Schedules preparation. - Preparing the detailed time schedule for (KUWAIT NATIONAL LIBRARY) Project (KD14, 000,000) which constructed by AL HANI Co. & Supervised by MPW.
- Preparing The Detailed time schedule for (MAIN STORES AT SHIWAIKH) Project Owned by KUWAITI SUPPLY CO. & Constructed By AL GHANIM INTERNATIONAL CO.
- Preparation of Detailed time schedule for (The Avenues Project Owned by MABANEE, KD 54,000,000 and Constructed by Al GHANIM Int.)
- Preparation of Detailed time schedule and Method Statement of some different projects. (As Construction Training Institute (CTI)Owned By PAAET, KD14,000,000 & constructed By MUSSAD Al SALEH & Sons Co.)
Detailed Schedules Revision & Approval. - 360°– MallProject (KD 45,000,000), owned by AL-TAMDEEN & Constructed by AL_AHMADIAH.
- The Project (New Central Souk & Retail Shops),KD 4,100,000 , (Owner: DASMAH & BENAID Al-QAR Cop. Society), I have Reviewed, Commented, Discussed & Approved the Detailed time schedule prepared by the Contractor (The Kuwaiti Manager Co.) .
Monitoring and control Process. Implementing & Supervising all the actions related to & required by project control system manual , Preparing the Required Detailed Recovery & Revised Schedules, Monitoring & Control and Issuing the Required Reports for the Following Projects: - 360°– MallProject (KD 45,000,000)- Kuwait, 2006
- KUWAIT NATIONAL LIBRARY Project(KD14, 000,000) which constructed by AL HANI Co., Supervised by TAAP & Owned by MPW., 2006
- New Headquarter & Car Park for STATE AUDIT BUREAU (KD 22,400,000), From Start of February 2004 till March 2006.
- College Of Health Sciences (BOYS), KD 7,000,000, AT PAAET CAMP (From Dec.2002 till Nov.2003).
- Bid Pack No 9 / For AL RIYASH CO. / KNPC New Headquarter from September, 2003 Till Feb.2006.
- Electricity & Water Training Institute (EWTI), KD 6,000,000, at PAAET Camp. (From Dec., 2003 till End of January 2004).
- Headquarter For Ministry of Industry At South Sura Zone- Kuwait.- October 2002
- Civil Service Commissioning-New Headquarter. At Al SHIWAIKH Area – Kuwait, 2002
Claims preparation. - Sharing in the preparation of the Claim Done on behalf of Public Warehouses Co (PWC). against The Ministry of Finance Concerning The changes which have been done in the finishes & E/M works of Doha Warehouses Camp which affected The Main Function of The warehouses, and require a lot of Demolishment, Dismantle & Refurbishment works to return them to their original status, about 15 warehouse (1000 m2 each)
- Sharing in the preparation of The Claim Done on behalf of BURHAN Construction Co. concerning the Extension of time required for SIMPHONY Project.
[From 12/01/2002 Till Date15/09/2002], SIAC Industrial Construction& Engineering Co, Egypt. Position: Senior Planning and Control Engineer. Responsibilities & Skills: - Preparation of Detailed time schedule for ALEXANDRIA CITY CENTER PROJECT (L.E. 71,000,000) which Owned to MAJED AL FATIM and Constructed By HMS-JV (AL-HABTOOR, MURRAY AND ROBERTS & SIAC JV)., Avery big Commercial Mall, Planned to be Constructed in 11 Month.
- Loading the schedule by the major resources and contract quantities.
- Tracking & Monitoring the project Progress, Making the required update of the project schedule, producing the progress reports by the end of every week and month.
- Making the necessary re-scheduling or Modifications for the project time Schedule to catch the agreed finish date (Recovery Program).
- Preparing Daily construction Reports.
[From 15/05/2000 Till 15/12/2001], Arab Contractors (Red Sea Branch), Egypt. Position : Senior Planning and Control Engineer Responsibilities & Skills: - Preparation of detailed time schedule for the MARSA ALAM INT. AIRPORT PROJECT (L.E. 70,000,000) which contains more than 40 different Buildings Including; Terminal (Passenger & VVIP) Building 5200 m2, Control tower, Ancillary buildings (26 Different buildings), Housing buildings (10 Buildings) along with all related E/ M activities & Internal finishes ,External works, Roads and Utilities. And Navigational aids & Meteo sys. (No. of Activities reached to more than 4550 activity).
- Loading the schedule by the major resources and all of the contract quantities & prices.
- Tracing the Progress and prepare the required update for the project schedule, producing the progress reports by the end of every week and month.
- Making the necessary re-scheduling for the project to catch the agreed finish date after getting the approved time extensions.
- Sharing with Charter Q.S. in the Preparation of the contractor’s claims.
[From December,1999Till 10/05/2000],Egyptian Project Management Consultancy(E.P.M)- Egypt Position : Executive Project Manager & Contract Administrator Responsibilities & Skills: - Executive project managerfor Development and renovation of DAR Al KOTTUB building project – BAB EL-KHALK, Cairo (L.E. 60,000,000).
- Monitoring & Tracking all the Site activities.
- Coordinates between different project parts.
- Dealing with the different authorities for any required approvals or arrangements.
- Solving any problems or obstacles facing the progress of the works.
- Auditing & reviewing the time schedules prepared by the contractor to comply the contract requirements.
- Administer and control the project’s Documents, correspondences & Submittals from the contractual point of view.
- Arrange and manage the site meetings between the different parts of the project.
[From January, 1996Till End of November, 1999], Egyptian Project Management Consultancy (E.P.M) - Egypt. Position : Senior Planning and Control Engineer, Contract Administrator - Head of Planning & Control Team Responsibilities & Skills: - The head of the Planning & Control Team for Iran Cane Sugar factories Project (Construction of 5 Sugar Factories in Iran Cost L.E. 600,000,000).
- Responsible for preparing the master and detailed plans for the five cane sugar factories.
- Monitoring and control the project progress including Manufacturing, Procurement & Installation.
- Making the updates of the plans and preparing the follow up & progress reports Using Primavera P3 Under windows, Excel. & Word.
- Administrating the Contract of Iran cane sugar project which includes dealing with more than 150 Sub-Contractors &Sub-suppliers for the main contractor (Sugar & Integrated Industries Company – Egypt -SIIC) & Monitoring all Related P.Os.& Deliverables
- Sharing in the planning process of some other projects (Swiss village& Four season) - sharm AL Sheikh
- Sharing in planning process & preparation of tender documents for Port said Complex building (Owner: :Free zone authority , Budget about L.E. 75 million)
- Trainer for Primavera program (Under windows Ver.1.1, V.2.0 & Ver.3.0) for many different big firms in Egypt.
[From January , 1990 to January ,1992 & From Nov. ,1993 Till January, 1996] , Cairo wastewater Project Organization (CWO) , Egypt Position: Owner Representative. Responsibilities & Skills: Tracking Compliance of the project Submittals , Correspondences, with the contract Conditions (FIDIC) & Documents and Supervising progress of the Construction works For: - Helwan Waste Water Treatment plantProject (Receiving and Treating about 350,000.00 cubic meters of waste water per day)
- Construction works of Helwan Storage Reservoir with a capacity (550,000.00 cubic meters of waste water per day), Construction works were include the following; Concrete works reach to 1650 cubic meters, Building up Dams using 140,350.00 cubic meters of backfilling, Filling & Compaction for roads reach to 2200 meters length, and Filling & Compaction of CLAY layer for the whole reservoir area (185,000.00 sq. meters).
- The repair works of 900 mm GRP Main sewer lines.
[From April, 1992 to Sept., 1993], Arabic Computer Systems Company, Riyadh, Saudi Arabia. Position: Representative Engineer. Responsibilities & Skills - Supervising the overall setup and operating of the computer Hardware and Software In the Ministry of P.T.T.
|