Mohamed Basheer
SUMMARY OF SKILLS
- Project Planning & Scheduling
- Resource Analysis
- Cash Flow Analysis
- Manpower forecast / Histograms
- Preparation of Progress reports
- Change Order Management
- Delay Analysis, Recovery Schedules
- Extension of time Claims
- Material Procurement Schedules and Material approvals.
- Subcontractor Programme Co-ordination and Progress Review
- Review / Analysis of resource utilization and turnover analysis
- Establishing Cost control Systems
- Technical proposals for Tenders
ROLE AND RESPONSIBILITY AS PLANNING MANAGER
- Setting up Company Standard Planning / Project Control Procedures.
- Strategize / Critical review of Contract Program.
- Bi weekly Project review meetings with CEO, of all Projects under Heavy construction Division
- Guidance to the Site Planners in delay analysis, recovery program and claims
- Time feasibility study and Program Risk analysis at Tender Stage
July 2010 to till date EL-Seif Engineering Contracting Company, Riyadh, Saudi Arabia
POSITION : Planning Manager / Special Projects Div
Mar 2001 to May 2010 AHMED MASOOR AL-A’LI Co.BSC (c),BAHRAIN. (An ISO 9001:2008 Company.)
PROJECT: BAPCO-LBOP PROJECT.
Civil, Buildings, Foundations, Underground Services, Roads and Infrastructure for Lube Based Oil Plant Main Contractor: Samsung Engineering Co.Value: US$50 Million. Client: Bahrain Petroleum Co.
PROJECT: BAHRAINFINANCIAL HARBOUR INFRASTRUCTURE.
This project includes 4 Nos of Post tensioned Bridges and underground service networks (Sewer, Storm, Water, HV/LV, Irrigation and District Cooling) and Road works .Value: BD 36.50 Million. Client: Bahrain Financial Harbour Holding Co.
PROJECT: SHEIK KHALIFA BIN SALMAN HIGHWAY: INTERCHANGE 3&4
This project includes Two Underpasses and Grade Road works. Value: BD 16.28 Million. Client: Bahrain Ministry of Roads.
PROJECT: AL-DANA BEACH RESORT, Worked As Project Controls Engineer
This project includes 20,00 SQM build up area of tourism chalets with high quality finishes, Swimming pools , Services ,Accesses roads and External works
Value: BD 11.25Million. Client: AL JAZEERAH TOURISM CO.
PROJECT: THE SITRA MALL
Shopping Complex at Sitra with Pile Foundation and Pre Engineered Superstructure High Quality Finishes and Interiors.
Value: BD 9.40 Million. Client: Ministry of Municipalities, Bahrain
PROJECT: ACCESS ROADS TO FORMULA -1 RACING CIRCUITS .
Value: BD 13.95 Million. Client: The Ministry of Works
II.Aug1998 to Mar 2001 MANNAI ENGINEERING CO.LTD,BAHRAIN.
Engaged in Civil / Structural, Interior Decoration, Mechanical and Petrochemical jobs on Turnkey basis. POSITION: Senior Planning Engineer. ALBA - COKE CALCINING PLANT & ASSOCIATED FACILITIES This project includes Process Plant, Storage Building, Administration Building, Five Substations, Blending & Storage Silos, Desalination Plant and External works
Value: DM 58.080 Million. Client: ALUMINIUM BAHRAIN Consultant: Technip, GERMANY AIRPORT HOTEL AND BUSINESS CENTRE AT BIA
Five star status Hotel. This project includes Soil improvement RCC Framed Ground + Four story Building, Finishes, Shop fittings, External Works and Associated Facilities.
Value: BD 7.03 Million. Consultant: MSCEB
CONSTRUCTION OF SEEF MALL
The Biggest Shopping complex in Bahrain includes six cinemas.
Value: BD 7.50 + 4.5 Million. Client: HOUSING BANK, BAHRAIN
MAJLIZ AT RIFFA PALACE- Client:HH Amir of Bahrain
OFFICETOWERAT DIPLOMATIC AREA.- 12 Stories & Three Tier Car Parking
INTERIOR PROJECTS:ManyShop Fitting and Finishing jobs such as Debenhams, Marks & Spencers, JCPhenny, McDonald etc.
III.Sep1993 to Feb 1998 MOHAMMED AL-OJAIMI CONTRACTING EST.,Saudi Arabia.
Engaged in Electrical and Civil works with Saudi Consolidated Electric Company (SCECO) such as construction of HV substations, Support facilities, transmission and distribution system networks (underground and overhead), etc..
POSITION: Planning and Scheduling Engineer.
RESPONSIBILITIES:
Project Planning, Control, Project Scheduling, Cash Flow Analysis, Preparation of Progress reports and representing progress review meetings. Preparation of Technical proposals, Preparation of Project Invoices.
DETAILS OF MAJOR PROJECTS INVOLVED
SCECO EAST CONTRACT No. 81941 / 00
DHAHRAN CENTRAL REINFORCEMENT AND EXPANSION
Contract Value: SR.56.63 Million.
69kV Over Head Transmission Line for Saihat Grid station.
Installation of Ash-Shat’e 69/13.8kV Grid Station
Contract Value: SR.16.47 Million
69kV Underground Cables. - Contract Value: SR.98.39 Million.
115KV POWER SUPPLY TO SAUDI METHANOL CO.
Contract Value: SR.15.85 Million.
THOMAS ASSOCATES I.LLC, Contract No.TAI-AO-297
Aziziyah Villas Project Contract Value: US$.81.60 Million.
Many Saudi ARAMCCO bid Preparations.
IV.April1991 To Aug1993. B. SEENAIAH & CO.INDIA.
Highway Construction Company approved byAsian Development Bank, World Bank and Govt. Agencies.
PROJECT: Improvements to Ankola Hubli Road (SH -42)
Project includes Asphalt Paving for 132.5 KM of Highways, Construction of RCC Bridges, Slab Culverts, Pipe Culverts, Widening the carriageway, realignments.
POSITION: Asst. Resident Engineer (Technical)
RESPONSIBILITIES:
Lead the Quality Control Engineer, Project Progress report to the Head office. Preparation of monthly reports to be forwarded to the Asian Development Bank.Coordination with Consultants (RITES), Project Planning and monitoring, Coordination - measurements and billing.
V. Dec1989 to Mar1991. S.T.R. Builders
Class I Contractor, Pattukotai , India.
Project:Construction of Court Complex and Support Facilities.
Contract Value Rs 48 Million, POSITION: Engineer/Civil
VI.May1989 to Nov 1989 Mohammed Sathak Engineering College,
Tamil Nadu.INDIA. - POSITION: Associate Lecturer.
Worked as a Lecturer in the Civil Engineering Department., Handled classes in Surveying, Quantity Surveying. Handled Practical classes in Surveying and Soil Mechanics.
VII.Dec1988 to April 1989 Mohammed Sathak Polytechnic,
Tamil Nadu.INDIA. - POSITION: Instructor / Civil.
Worked as an Instructor in the Civil Engineering Department. Handled classes in Surveying and Engineering Drawings.
- Industry:
- Region: