Hi all.
I need help on the productivity calculation for structural steel works
How many manpower we should consider for how many tonnage.
Now i have 700ton steel beams and column. It is for the construction of 6 floor factory expansion. The duration is 6month
I need to calculate on the manpower.
Please give me some guidance
Thank u so much in advance