START Date:
May, 2018
END Date:
January, 2019 Responsibilities:
- Analysed approved Baseline Schedule (both program & narrative) integrity based on contract agreement, issued for construction documents (specification & drawings), approved method statement and governing construction standards.
- Analysed existing Progress Reports (both program & narrative) integrity based on its consistency of actual dates, agreed productivity rate and manner deployment of resources.
- Analysed Delay Events by collecting all related documents to be able to determine a strong factual storyline in preparation for corresponding fragnet that shall be use in impacting approved Baseline Schedule.
- Prepare delay analysis to determine time impact on Baseline Schedule and corresponding narrative that shall be use as part of Extension of Time or EOT evaluation.
- Prepare an As-Built Schedule with documented references such correspondence, progress reports, register logs, inspection, information request, drawings, meeting minutes and all project documents.
Project Involved:
- AE7 - Meydan One Project (Dubai)
- A W Rostamani – Trio Building Project (Dubai)
- Arabtec – Tiara Union Tower Project (Dubai)
- Damac – Suburbia Project (Dubai)
- Arabtec – Media City Project (Dubai)
- SRG – Al Zour LNG Import Project (Kuwait)
- Arabtec – World Trade Center (Qatar)
Experience Hours (Planning & Scheduling):
1450
Experience Hours (Forensic Analysis):
1450