START Date:
April, 2012
END Date:
April, 2013 Runway Resilience, Heathrow Airport (£10M)
Working as a site agent with a leading a team in the construction of new taxiways, widening of various taxiways and rapid exit taxiways to enable the Airbus A380 to taxi to Terminals 4 and 5.
Cambridge Airport Fuel Bowser Park (£250k)
Working with a very small tea as the Project Manager constructing a new fuel Bowser park at Cambridge Airport. All works airside in a mixed use commercial and MOD airfield. Due to the size of the contract I carried out all pre construction works inc CPP, programme and relevant paperwork.