Hi All,
Is there a short cut in my to replace the budgeted unit in activity cost For example, the 5 budgeted unit to replace by 9667.24 on my excel sheet. Note: There are 2 budgetted unit in each activity. One is my cost and another is my resources. I do not want to change the Mec.Mechanical value because its my labour resource. I only want to change the Activity Cost.Activity Cost. Value I have about 800 Activity Costs to transfer from Excel to P6 to Activity Cost. If there is a short cut, it would save me a lot of time. THANKS!
Mike