Experienced in planning, scheduling, resource / cost loading, project control, monitoring progress, preparing reports, dashboards, earned value management and risk assessment. Familiar with a variety of delay analysis methodologies; windows time-slice, time-impacted analysis, impacted as planned, as-built vs. as-planned. Experienced in claims preparation including review of FIDIC / special condition of contracts, reviewing of delay notifications, scrutinizing the construction programs (baseline and as-built), study of case law references relevant to the delay analysis techniques (Pickavance, AACE, SCL protocol), analyzing compensable, non-compensable, culpable, and disruption delays. Preparing extension of time with prolongation cost claims and drafting delay analysis reports. Experienced in dispute resolution concepts such as defense, mediation, arbitration and expert witness. I posses excellent communication skills