May, 2019 Project Planner
Tunnel and Pipeline
Itare Dam. Molo, Kenya.
The Project involved:- Asphalt Concrete Core Rockfill Dam – 57m high, with 63m high concrete Intake tower,
- 400m long concrete Diversion Culvert, 400m Crest and 550 long concrete Spillway and designed max output capacity of 153,972 mc/day.
- Raw Water Mains (DN 1300, 1.3KM)
- Water Treatment Plant (100,000mc/day conventional plant with flocculators, sedimentation basins, rapid gravity sand filters)
- Treated Bulk Transfer water pipelines (DN 1200 to 800, 103 KM)
- Bulk Transfer Tunnel (3m dia and 12.66Km long by EPB TBM).
- Bulk Reservoir storage Tanks, Cumulative design storage 30,000 mc and
- Bulk Distribution Pipelines (DN 800-250, 35KM). Ancillaries:
- EPB TBM Tunnel Boring for the Tunnel
- Tunnel Railway line (14KM)
- Precast Segment Carousel factory
- Roads and Bridges, 37 KM
- Asphalt plant
- Quarry, Crushing plant
- Preparing and Managing Master schedules and the Program of Works.
- Work Scoping and Quantifying to generate logical sequences for the Construction and
- Engineering work programmes.
- Track, monitor and forecast progress of all activities and deliverables.
- Perform probabilistic analysis of completion dates and potential alternatives.
- Work breakdown with Management to develop Production structures. Monitor and evaluate allocation of resources and provide recommendations to maintain required progress.
- Contractual matter monitor for analyzing delays, time losses and additional works and to work out EOT claims. Time Impact Analysis and Report for EOT claims.
- Prepare Recovery plans and analysis for possible rate, cost and variations.
Experience Hours (Planning & Scheduling):
500
Experience Hours (Cost Management):
200
Experience Hours (Forensic Analysis):
200