The default constraint in Microsoft Project is ASAP. This is the ideal for most forward scheduling situations. Here we look at the As Late As Possible (ALAP) Constraint http://ow.ly/XWd830aUwVd [1]
The default constraint in Microsoft Project is ASAP. This is the ideal for most forward scheduling situations. Here we look at the As Late As Possible (ALAP) Constraint http://ow.ly/XWd830aUwVd [1]
Links:
[1] http://ow.ly/XWd830aUwVd
[2] http://www.planningplanet.com/forums/microsoft-project