2014 (current) – Consórcio QGIT (Queiroz Galvão, IESA e Tecna)
Project: EPC for UPGN (Natural Gas Processing Unit)
Costumer: PETROBRAS – COMPERJ (Itaboraí / RJ)
* Eletrical and instrumentation planning supervisor. Budgeted project value about R$ 1.8 billion
2013 – Schahin Engenharia
Project: Bridges and industrial access
Costumer: PETROBRAS – COMPERJ (Itaboraí / RJ)
* Contract administration and Claims
2011/2012 - COMPLAN Gerenciamento e Controle (Owner / Consultant)
Costumer: Netplan Engenharia
Project: Installation of the MOP1 Offshore Platform
Client: PETROBRAS
* Consulting and implementation of planning and control
* Consulting and operation of MS Project
* Software Development
Project: Installation of the unit HDT Comperj - Consorcio Itaboraí
Client: PETROBRAS - COMPERJ (Itaboraí / RJ)
* Consulting and implementation of planning and control
* Consulting and operation of Primavera P6
Costumer: Misel Engenharia
Project: Modules to FPSO Cidade de Paraty
Client: SBM / PETROBRAS
* Piping planning and control
Project: Turnaround of the unity U1710
Client: PETROBRAS – REDUC
* Planning and control elaboration
Costumer: Skanska Brasil
Project: Expansion and modernization factory Lubricants - LUBRAX
Client: PETROBRAS - BR Distribuidora (Duque de Caxias / RJ)
* Responsible for the implementation of planning and control activities of the Project, manufacture and assembly of piping
Customer: Jaraguá Engenharia e Instalações Ltda
Project: Installation of the tubular reformers of the UGHs U-35 and U-36
Customer: PETROBRAS – RNEST (Ipojuca / PE)
* Responsible for the implementation of the physical and financial planning
* Structure the planning environment with integration between different systems and external interfaces
* Set up the timetable and other planning documents
2009 to 2011 - Consórcio HDS – Skanska Brasil e Promon Engenharia
Project: EPC for the UHDS of the Gasoline Portfolio
Customer: PETROBRAS – REFAP SA (Canoas / RS)
* Responsible for the planning and control of the commissioning and integration activities of electromechanical installations
* Responsible for the planning and control of the piping manufacture and installation activities (pipe shop – 1100 ton)
* Responsible for the integration of various progress control and measurement systems (Gitec / Worksheet / Controltub)
2009 - DM Construtora de Obras Ltda
Project: EPC for U-87 Cooling Unit and U-73 Wastewater Collector and Segregator
Customer: PETROBRAS – RLAM (Refinaria Landulpho Alves de Mataripe) (Salvador / BA)
* Implement contract management, provide support to contract administration in project management and cost control
* Implement initial planning and budget validation
2008 - COMPLAN Gerenciamento e Controle (Décio Dalke Junior ME) (Owner / Consultant)
Customer: DM Construtora de Obras Ltda
Contractor: PETROBRAS – RLAM (Refinaria Landulpho Alves de Mataripe) (Salvador / BA)
Project: EPC for U-87 Cooling Unit and U-73 Wastewater Collector and Segregator (Service performed at headquarters in Curitiba)
* Plan the project, supervise the planning department, prepare for the beginning of the project and implement Contract Management
Customer: Irmãos Passaúra e Cia Ltda
Contractor: Cosan Centro Oeste e Promon Engenharia – Plant in Jataí / GO
Project: Construction and installation of the Ethanol Plant in Jataí – GO (Sugar cane processing)
* Implement the planning sector, set up initial procedures and documentation for the project.
2008 - Multitek Engenharia
Customer: Petrobras Transporte (TRANSPETRO) – Volta Redonda Terminal (Volta Redonda / RJ)
Project: Compliance of the construction to the Fire Fighting System
* Plan the construction project
* Manage, plan and provide support in contract management (contract administration)
2007 - COMPLAN Gerenciamento e Controle (Décio Dalke Junior ME) - Freelance
Customer: Accentum Manutenção e Serviços Ltda. (Rioman Consortium)
Contractor: Quattor Petroquimica – Rio Polímeros S.A (RIOPOL) (Duque de Caxias / RJ)
* Plan maintenance shutdowns
* Manage/systemize maintenance shutdown projects
2007 - Qualidados Engenharia
Customer: Petrobras – REPAR (Araucária/PR)
Projects:
* General Unit Shutdown 2008: Service planning and management of Project PGU 2008
* General Unit Shutdown 2010: Service planning and management of Project PGU 2010
2006 - Thorga Engenharia SA
Customer: CGTEE (Thermal power generation company) (Candiota / RS)
Project: Permanent maintenance contract - multidisciplinary
* Implement the maintenance planning system (TPM methodology)
* Plan the corrective, preventive and predictive maintenance activities
* Plan maintenance shutdowns
2006 - Estrutural Serviços Industriais Ltda.
Customer: Petrobras - Refap SA (Canoas/RS)
Project: Pre shutdown of Towers, Vessels and Exchangers of U-0001 and U-0002
* Plan shut down activities, define scope and validate the budget
2005 - Thorga Engenharia SA
Projects:
- COPESUL, BRASKEM, INNOVA, IPIRANGA (Triunfo – RS) / boiler and complement maintenance (Autoclave Braskem shut down, Bulk 1- 2 Braskem shut down, Boiler 46GV03 shut down)
- COPESUL (Triunfo – RS) / General Maintenance shut down – Plant 2
- Petrobras – UN-SIX (São Mateus do Sul/PR) / General Maintenance shut down / URE Revamp
* Responsible for the planning, monitoring and control team
2005 - Qualidados Engenharia (Salvador / BA)
Projects:
- UPGN II – UN-BSOL (Urucu – AM – service in SSA / BA) shut down
Plan and prepare for the Sep/2005 shut down
- POLITENO Indústria e Comercio (Camaçari / BA)
Manage expansion projects and maintenance shutdowns
* Draft the macro planning of the shut downs and provide support to the PMBOK knowledge areas
* Set up the planning and control structure
2004 - Consórcio Skanska Brasil – Promon Engenharia
Customer: Petrobras - Refap SA (Canoas/RS)
Project: : Installation of the Hydrogen Generation Unit - UGH
* Responsible for controlling the manufacture and installation of piping and supports
* Responsible for scheduling QC installation and testing services and for operating the Controltub system
2004 - Cemon Engenharia e Construções Ltda
Customer: Petrobras - Refap SA (Canoas/RS)
Project: Revamp of the U-50 Atmospheric Distillation Unit
* Plan and control shut down services
* Control manufacture and installation of piping and supports using Controltub
* Develop and operate physical and financial progress control system
2003 - Bechtel do Brasil Construções Ltda
Customer: Petrobras - Refap SA (Canoas/RS)
Project: Construction and installation of a cracking (URFCC) and hydrotreatment unit (UHDT)
* Develop systems for planning, commissioning and quality control
* Implement Controltub in external pipe shop
* Provide technical services on computers and systems to the project
2002 - Hochtief do Brasil – Mei Engenharia
Customer: Petrobras - Refap SA (Canoas/RS)
Project: Underground Services of the second extension (URFCC, UCR, UHDT)
* Plan civil, electrical and instrumentation engineering services
* Materials take off for purchasing
* Develop control systems for materials and planning
2002 - Bechtel do Brasil Construções Ltda
Customer: Klabin Riocell (Guaíba/RS)
Project: Project Riocell 2000 – Plant extension
* Develop internal systems
* Provide technical services on computers and systems to the project