Dear experts,
For example, I have a project(A) inside EPS (1). The project (A) has some activities which I added activity code (Area A, Area B...). But when I copy project (A) to other EPS (2), i lost all activity code which I added in activity. When I copied project, I ticked on all option of primavera requirement. I also used 2 way for copying ( 1.directly copy project/2.I made project (B) inside EPS(2) open 2 projects (A) &(B), in WBS window of (A) I copied them to (B) ) but I still lost activity code with activity in project (B). Could you help me? Thank you