Experince
January 2015 – Until now
Company :Jaya CM as Consultant
Position :Planner and Scheduler
Project :Podomoro City Deli Medan
Owner :Podomoro Land
Reference :Feydy Bonenehu as Project Control Manager(085270752726)
Main duties tasks and responsibilities :
· Develop the Master Schedule.
· Review the daily, weekly and monthly progress report.
· Recommended necessary action for critical path.
· Modify the current project with realistic data.
· Distribute the analyze reportto Site Manager and owner about weekly, monthly and overall progress.
· Review theprogress measurementreport.
· Conduct the monthly progress meeting.
· Communicate project performance to the project team.
August 2012 – December 2014
Company :Black and Veatch/Jaya CM as Consultant
Position :Planner and Scheduler
Project :Banjarsari Minemouth Coal Fire Steam Power Plant 2x135 MW
Owner :PT. Bukit Pembangkit Innovative
Reference :Robert Cone (my.linkedin.com/pub/robert-cone/15/100/b55)
Gerald W Peters as Site Manager (08111680830)
Main duties tasks and responsibilities :
· Develop the Master Schedule.
· Review the daily, weekly and monthly progress report.
· Recommended necessary action for critical path.
· Modify the current project with realistic data.
· Distribute the analyze reportto Site Manager and owner about weekly, monthly and overall progress.
· Review theprogress measurementreport.
· Conduct the monthly progress meeting.
· Communicate project performance to the project team.
August 2012 – December 2014
Company :Black and Veatch/Jaya CM as Consultant
Position :Planner and Scheduler
Project :Transmission Line 150 kV Banjarsari – Lahat Substation
Owner :PT. Bukit Pembangkit Innovative
Reference :Robert Cone (my.linkedin.com/pub/robert-cone/15/100/b55)
Gerald W Peters as Site Manager (08111680830)
Main duties tasks and responsibilities :
· Develop the Master Schedule.
· Review the daily, weekly and monthly progress report.
· Recommended necessary action for critical path.
· Modify the current project with realistic data.
· Distribute the analyze reportto Site Manager and owner about weekly, monthly and overall progress.
· Review theprogress measurementreport.
· Conduct the monthly progress meeting.
· Communicate project performance to the project team.
November 2011 - August 2012
Company :PT Krakatau Engineering as Contractor
Position :Project Control Engineer
Project :Indonesia Integrated Steel Mill Power Plant 2x100MW
Owner :PT. Krakatau Posco
Reference :Irfan Alfaiz as Project Manager (08129976770)
Main duties tasks and responsibilities :
· Develop the Master Schedule.
· Prepare the Project Execution Plan.
· Record the progress each area working plan.
· Tracking theprogressactivityand actual costs.
· Controling project finance condition.
· Recommended necessary actionto catch up project progress.
· Reforecast the scheduleif necessary.
· Modify the current project with realistic data
· Distribute thedaily, weekly and monthlyprogressreport to owner.
· Communicate project performance to the project team
· Prepare the Project Measurement Report
· Communicate with Contract Administrator about the payment to owner.
· Monitoring sub-contractors progress
April 2011 – August 2011
Company :PT KSB Indonesia
Position :Order Processing and Purchasing
Prooduct :Pumps
Reference :Vhonyas Order Processing and Purchasing (085710333967)
Main duties tasks and responsibilities:
· Checking quoatation and order from customer.
· Processed order with equip “order review checklist”, make order calculation, purchase order for goods import and order confirmation.
· Coordination with Finance, Engineering, Logistic, Services, Warehouse, Sales Support, Forwarder and PPC about goods status.
· Monitoring import goods to factory until goods ready for sent at factory then continued by Dept import to regulate the delivery passes sea or air through forwarding agent.
· Monitoring goods that bought local done by PPC pass local purchasing.
· Contact the customer if the good already send to their company.
February 2010 - March 2011
Company :PT Gunanusa Utama Fabricators as Contractor
Position :Production Staff
Project :ICP-R Process Platform Project MHSRP II
Owner :ONGC India
Reference :Ardhani Widaryoko as Project Coordinator (081330214938)
Agus Putra Djajaas Supertendent (021-8804443)
Main duties tasks and responsibilities :
· Assist Project Coordinatorjobs.
· Monitor the implementation of the task sheets in the field.
· Monitor the location of goods made in cutprofile of disciplinary structure
· Prepare methods or tools tosolve the fabrication problems.
· Coordinate with supervisors to perform fabrication, installation and erection.
· Monitoring daily and progress activities.
· Select the new employee for Pipe Fitter.
November 2008 - August 2009
Company :PT Global Internasional Industries
Position :Lead Production
Product :Lamps (Shinyoku branded)
Reference :Liem Liak Hui as Production Manager (02191473888)
The main duties and responsibilities :
· Running the daily production schedule.
· Ensuring the work undertaken can be achieved by an efficient and timely manner.
· Ensure zero bottlenecks in the assembling line.
· Mapping production lines and the number of operators required for each type of production items.
· Coordination with QC to ensure that incoming raw materials in accordance with the specifications and requirements.
· Coordination with the PPIC to ensure the arrival of material and production scheduling.